Category:INSPECTION REPORT
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000382/19900221990-10-23023 October 1990 Insp Rept 50-382/90-22 on 900905-1001.Violations Noted.Major Areas Inspected:Followup of Events,Monthly Maint & Surveillance Observation,Operational Safety Verification, Followup of Previously Identified Items & LER Followup IR 05000382/19900211990-10-12012 October 1990 Insp Rept 50-382/90-21 on 900910-14.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radwaste Mgt Program IR 05000382/19902001990-09-10010 September 1990 Interfacing Sys LOCA Insp Rept 50-382/90-200 on 900730-0810. Major Areas Inspected:Plant Design Features,Sys,Equipment, Procedures,Operations Activities & Human Actions That Could Affect Initiation or Progress of Interfacing Sys LOCA IR 05000382/19900171990-08-27027 August 1990 Insp Rept 50-382/90-17 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program Including Changes to Emergency Plans & EPIPs & Changes to Emergency Facilities IR 05000382/19900111990-07-29029 July 1990 Insp Rept 50-382/90-11 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program.Licensee Implemented Effective Program & Personnel Highly Qualified & Motivated IR 05000382/19900141990-07-17017 July 1990 Insp Rept 50-382/90-14 on 900625-29.Violation Noted.Major Areas Inspected:Containment Local Leak Rate Testing Data, Surveillance Test & Calibr Program & Followup of Previous Insp Findings IR 05000382/19900101990-07-0505 July 1990 Cancelled Insp Rept 50-382/90-10 IR 05000382/19900091990-06-26026 June 1990 Errata to Insp Rept 50-382/90-09,inserting Page 6a.No Violations or Deviations Noted ML20055C7821990-06-14014 June 1990 Insp Rept 50-382/90-09 on 900501-31.No Violations or Deviations Noted.One Unresolved Item Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Monthly Surveillance Observation & Operational Safety Verification IR 05000382/19890231989-09-26026 September 1989 Insp Rept 50-382/89-23 on 890801-31.No Violations Noted. Major Areas Inspected:Plant Status,Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Operational Safety Verification IR 05000382/19890251989-09-21021 September 1989 Insp Rept 50-382/89-25 on 890828-0901.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Program,Including Organization & Mgt Controls, Qualification & Training & Licensee QA & Contractor Audits IR 05000382/19890161989-09-15015 September 1989 Insp Rept 50-382/89-16 on 890717-21.Violation Noted.Major Areas Inspected:Operations Procedures IR 05000382/19890221989-08-0909 August 1989 Insp Rept 50-382/89-22 on 890701-31.Violation Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Operational Safety Verification & LER Followup IR 05000382/19890201989-07-25025 July 1989 Insp Rept 50-382/89-20 on 890705.No Violations or Deviations Noted.Major Areas Inspected:Svc Failure of Shaft in Chilled Water Pump B IR 05000382/19890171989-07-14014 July 1989 Insp Rept 50-382/89-17 on 890601-30.Violations Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation & Operational Safety Verification IR 05000382/19890181989-07-13013 July 1989 Insp Rept 50-382/89-18 on 890626-30.Noncited Violation Noted.Major Areas Inspected:Corrective Action Program & Licensee Actions on Previously Identified Findings IR 05000382/19890151989-07-0606 July 1989 Insp Rept 50-382/89-15 on 890605-09 & 20-21.No Violations or Deviations Noted.Major Areas Inspected:Storage of Emergency Diesel Generator Fuel Oil,Containment Bldg Temp Profiles & Action on Previously Identified Insp Findings IR 05000382/19890141989-07-0303 July 1989 Insp Rept 50-382/89-14 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Radwaste Mgt & Effluent Control Programs & Review of Special & Semiannual Effluents Repts IR 05000382/19890131989-06-14014 June 1989 Insp Rept 50-382/89-13 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Followup to Previous Insp Findings & Licensee Expeditious Actions Re Generic Ltr 88-17, Loss of Dhr ML20244C6951989-06-0808 June 1989 Insp Rept 50-382/89-12 on 890416-0531.Violations Noted. Major Areas Inspected:Monthly Maint Observation,Monthly Surveillance Observation,Onsite Followup of Events & Evaluation of Licensee QA Program Implementation IR 05000382/19890081989-05-16016 May 1989 Insp Rept 50-382/89-08 on 890301-0415.Violations Noted. Major Areas Inspected:Status,Monthly Maint Observation,Event Followup,Esf Walkdown & LER Followup IR 05000382/19890111989-05-0808 May 1989 Insp Rept 50-382/89-11 on 890327-31.Violations Noted.Major Areas Inspected:Engineering & Technical Support Activities & QA Audits of Activities IR 05000382/19890041989-04-18018 April 1989 Insp Rept 50-382/89-04 Cancelled ML20245C7281989-04-12012 April 1989 Insp Rept 50-382/89-07 on 890227-0303 & 890313-17.Violation Noted.Major Areas Inspected:Previously Identified Findings, Licensee self-assessment Capabilities & Procurement Activities ML20244A7551989-04-0303 April 1989 Insp Rept 50-382/89-09 on 890308-09.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings Associated W/Testing,Low Recirculation Flow Condition & Corrective Maint of HPSI Pump B ML20247K3951989-03-25025 March 1989 Insp Rept 50-382/89-06 on 890201-28.Violations Noted.Major Areas Inspected:Plant Status,Monthly Maint Observation, Operational Safety Verification,Onsite Followup of Events, ESF Walkdown & Followup of Previously Identified Items IR 05000382/19890101989-03-15015 March 1989 Cancels Insp Rept 50-382/89-10.No Insp Rept Will Be Issued for Rept Number IR 05000382/19890011989-03-14014 March 1989 Insp Rept 50-382/89-01 on 890117-0210.Violations Noted.Major Areas Inspected:Maint Performance,Overall Plant Performance Re Maint,Mgt Support of Maint & Maint Implementation ML20247A5101989-03-14014 March 1989 Insp Rept 50-382/89-05 on 890213-17.Violation Noted.Major Areas Inspected:Licensee Action on Previously Identified Violations & Unresolved Items Re Equipment Qualification of Electric Equipment ML20235Z7771989-03-0303 March 1989 Insp Rept 50-382/89-02 on 890109-13.Violations Noted.Major Areas Inspected:Followup of Previous Insp Items,Followup of NRC Info Notices & Bulletins Applicable to Procurement & Insp of 10CFR21 Activities ML20235M7561989-02-16016 February 1989 Insp Rept 50-382/89-03 on 890101-31.Violations Noted.Major Areas Inspected:Plant Status,Monthly Surveillance Operation, Onsite Followup of Events,Diesel Generator Fuel Oil QA & NRC Bulletin 87-002 & LER Followup IR 05000382/19880271988-11-22022 November 1988 Insp Rept 50-382/88-27 on 881017-27 & 881101-07.Violations Noted.Major Areas Inspected:Licensee Actions on Previously Identified Items Re Equipment Documented in NRC Insp Rept 50-382/86-32 on 870416 ML20195J6561988-11-17017 November 1988 Insp Rept 50-382/88-25 on 880917-1031.Violations Noted. Major Areas Inspected:Plant Status,Onsite Followup of Events,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000382/19880261988-11-16016 November 1988 Insp Rept 50-382/88-26 on 881024-26.No Violations or Deviations Noted.Major Areas Inspected:Followup to Previous Insp Findings,Lers,Steam Generator Noise,& Replacement of Valve in Letdown Flow Sys IR 05000382/19880241988-11-0909 November 1988 Insp Rept 50-382/88-24 on 881011-13.No Violations or Deviations Noted.Eight Deficiencies Identified.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000382/19880211988-10-12012 October 1988 Insp Rept 50-382/88-21 on 880801-0916.Violation & Deviation Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Followup of Previously Identified Items,Operational Safety Verification & Monthly Maint Observation IR 05000382/19880231988-09-27027 September 1988 Insp Rept 50-382/88-23 on 880822-26 & 0919-23.Violations Noted.Major Areas Inspected:Potential Enforcement Findings Identified by Vendor Insp Branch in Insp Rept 50-382/87-19 ML20153D4311988-08-19019 August 1988 Insp Rept 50-382/88-19 on 880618-0731.Violations Noted. Major Areas Inspected:Enforcement Followup on Quality Verification Function Insp,Monthly Maint Observation, Allegation Followup & Operational Safety Verification ML20153C2521988-08-17017 August 1988 Insp Rept 50-382/88-20 on 880710-15.No Violations or Deviations Noted.Major Areas Inspected:Transportation of Radioactive Matls & Low Level Radwaste Mgt IR 05000382/19880181988-08-0909 August 1988 Insp Rept 50-382/88-18 on 880706-14.No Violations or Deviations Noted.Major Areas Inspected:Facility Emergency Operating Procedures,Including Control Room & Plant Walkdown,Simulator & Human factors-related Guidance ML20151E2391988-07-14014 July 1988 Insp Rept 50-382/88-13 on 880501-0617.Violations Noted.Major Areas Inspected:Monthly Maint Observation,Ler Followup, Containment Integrated Leak Rate Test,Plant Status & Followup of Previously Identified Items IR 05000382/19880171988-06-14014 June 1988 Insp Rept 50-382/88-17 on 880531-0603.One Violation & No Deviations Noted.Major Areas Inspected:Startup Testing IR 05000382/19880141988-06-13013 June 1988 Partially Withheld Insp Rept 50-382/88-14 on 880523-27 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Testing & Maint Program,Facility Lighting,Security Training & Qualification Plan & Safeguards Info Program IR 05000382/19880081988-06-0202 June 1988 Insp Rept 50-382/88-08 on 880316-0430.Violations Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Refueling Activity Observation,Esf,Sys Walkdown & Plant Status IR 05000382/19880101988-06-0101 June 1988 Insp Rept 50-382/88-10 on 880418-22.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Effectiveness IR 05000382/19880121988-05-27027 May 1988 Insp Rept 50-382/88-12 on 880501-06.No Violations Noted. Major Areas Inspected:Radiation Protection Activities During Cycle 2 Refueling Outage ML20154S2301988-05-27027 May 1988 Insp Rept 50-382/88-16 on 880512-20.Potential Violation & Deviation Noted.Major Areas Inspected:Events Which Occurred & Actions Taken by Util Prior To,During & Subsequent to 880512 Incident Re Possible Loss of Shutdown Cooling IR 05000382/19882001988-05-16016 May 1988 Insp Rept 50-382/88-200 on 880201-12.Weaknesses Noted.Major Areas Inspected:Quality Verification Organization Ability to Identify,Resolve & Prevent Recurrence of safety-significant Deficiencies in Functional Areas of Plant Operations IR 05000382/19880111988-05-16016 May 1988 Insp Rept 50-382/88-11 on 880418-22.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Inservice Insp & 10CFR21 ML20153E3091988-04-26026 April 1988 Insp Rept 50-382/88-09 on 880404-08.No Violations or Deviations Noted.Major Areas Inspected:Licensee Surveillance Procedures & Records & Verification of RCS Leak Rates 1990-09-10
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1999-10-0101 October 1999 PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 9908101999-09-15015 September 1999 PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed1999-08-12012 August 1999 PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor1999-08-0303 August 1999 PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments ML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20209B8581999-05-25025 May 1999 EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area1998-11-19019 November 1998 PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site1998-09-28028 September 1998 PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 9809231998-09-18018 September 1998 PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20151R9131998-06-0909 June 1998 EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 Facility IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided IR 05000382/19980991998-04-24024 April 1998 SALP Rept 50-382/98-99 for 961201-980321 ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering 1999-09-08
[Table view] |
See also: IR 05000382/1988009
Text
v -
L e '
, 1
W ,n
_
,
$;~ ;
'
'
1
,,
.- ,
.,;.> j;r i
~. .
,
, ,
'
!
'
.- ,
APPENDIX
L
"
,- U.S. NUCLEAR REGULATORY COMMISSION ..
^
REGION IV-
. NRC Inspection Report: 50-382/88-09 Operating' License: NPF-38
Docket: 50-3f12 l
,
' Licensee': -Louisiana Po'wer & Light Company (LP&L) -
.
..
N-80
317~Baronne Street
New Orlean's, Louisiana 70160
,
' Facility Name: Waterford Steam Electric Station, Unit 3 (W3)
-
Inspection At: W3, Taft, Louisiana , ;
Inspection Conducted: ' April 4-8, 1988
.
.
- B
Inspectors: [@ ~'
&
f 7 T. O. McKernon, Reatitor Inspector, Test
y/24Airt
Date
'
Programs Section, Division of Reactor Safety _
'
,
L
.
fWh^
H FT Eundy, Reactor Inspector, Test Programs
9 fan.ygg
Date i
Section, Division of Reactor Safety ,
Accompanied ,
By: W. C. Seidle, Chief, Test Programs Section ;
Division of Reactor Safety on April 7-8, 1988
~
>
l
Approved: -
- ANT
7.~C. SeidT % Chief, Test Programs Section Date
Division of Keactor Safety ,
I
Inspection Summa _ry
. r
Inspection Conducted April 4-8, 1988 (Report 50-382/88-09) i
Areas Inspected: Routine, unannounced inspection of the licensee's
surveillance procedures and records and verification of reactor coolant
system (RCS) leak rates. l
'
8805090454 880505
PDR ADOCK 05000382
Q DCD ;
-, - ,- ..,-.-.-,. - - - - -.,
,
+ ;-
E .
_., .
,
- . ,
-
g
,
-0'
5
"' , , ,
g. .p
2-
,
Results: The procedures and records reviewed in the areas of inservice
inspection of components and inservice testing of pumps and valves pursuant to
10 CFR 50.55a(g) and ASME Section XI appeared to satisfy all requirements. -The
procedures and records related to Technical Specifications required .
surveillances appeared to satisfy ~ all requirements. However, an area of
confusion relating to anomalies in calibration and control of measuring and
test equipment was identified (paragraph 2). The NRC inspectors verified the
se ~
~
adequacy of the licensee's calculating technique 3 for determining RCS leak
rates,
h
J
J
L
4
$
it
_.
,
,
,
NE ,
.( -
,o
.- . . ; 4 m
-
c
3
,
DETAILS
'*
,
1. Persons'Contactjd
.. LP&L
~
R. Barkhurst, ' lice President, Nuclear / Site Director
- P. Backes, Special Assistant to Vice President
- P. Prasankumar, Plant Technical Services Manager j
- S. Allenan, Quality Assurance Manager ,
R. Starkey, Operations Superintendent
- T. Smith, Plant Engineering Superintendent
- G. Wuller, Operational Licensing S_upervisor
+0. Schultr, Operations Shift Technical Aovisor Supervisor
G. Koehler, Operations Quality Assurance Supervisor
- D. Baker, Event Analysis and Response Supervisor
L. Bass, Technical Support Supervisor
- G. Robin, Inservice Inspection Coordinator
- A. Harris, Shift Technical Advisor
C. DeDeaux. Technical Specifications Coordinstor
.
'
NRC ,
y~ ' *W. Smith, Senior Resident Inspector
T. Staker, Resident Inspector
- E. Tomlinson, Nuclear Reactor Regulation .
- W. C. Seidle, Chief, Test Programs Section, Division of Reactor Safety
The NRC-inspectors also interviewed other licensee personnel during the
inspection.
- Denotes those attending the exit interview on April 8, 1988.
2. e
Surveillanc_efroceduresandRecords (61700)
The purpose of this part of the inspection was to ascertain whether the
surveillance of safety-related systems and components was being conducted
in accordance with approved procedures as required by the licensee's
Technical Specifications (TS) Inservice Inspection (ISI) Plan, and
,
InserviceTesting(IST) Plan. Pursuant to this ob.iective, the NRC
,
inspectors reviewed the following licensee documents:
- 10 Year Inservice Inspection Program, Revision 3 (ISI Plan)
- W3 LP&L Pump and Valve Inservice Test Plan, Revision 5 (IST Plan)
The NRC inspectors then selected certain TS surveillance requirements and
components listed in the ISI and IST Plans and reviewed the associated
licentea test procec'ures and an appropriate number of test results records
- .
- - - - . , - - - _ . - - , .,. , . - - - - ,. .,
-
~
.
9 ,
-
.
, ,
l ,-
,*, ,. -
s;
4
,
for each procedure. The TS surveillance requirements of ISI or IST
components together with the associated test procedures reviewed by the
NRC inspectors are tabulated in the attachment.
The NRC inspectors determined that the required tests were being scheduled
and performed as required in accordance with approved procedures.
Acceptance criteria were specified in the procedures, and the records
st0ted satisfaction of acceptance criteria. Appropriate instructions for
returning equipment to service following testing were given. Also,
selected test personnel were verified to have appropriate certifications.
All requiren nts appeared to have been satisfied. However, anomalies in
calibration tnd control of measuring and test equipment (M&TE) discovered
in one test record are discussed below.
During a review of records pertaining to Surveillance Procedure MI-3-305,
Revision 3. "Instrumentation Loop Check," dated October 24, 1986, for
Bistable SG-IL 1113C, it was noted that Task Card No. 1, Note 1 indicated
that one of the test equipment maters was out of tolerance. In particular,
the record stated, ". . . as found data for SG-ILEI-1113C, TBB 19 and 20
is out of tolerance due to bad (out of tolerance) test equipment. No
adjustments were made. As left data was taken with good test equipment."
The NRC inspectors noted that five M&TE items were listed on the test
record; Decade Bcx, MIET 124.006; Transmation 1040, MIET 76.022; Keithley,
MIET 41.010; Fluka 8600. MIET 20.100; and Transmatien 1040, MIET 76.028.
' During subsequent inspection, the NRC inspectors found that only two of
the five test meters could have been suspect; these were Keithley MIET 41.010
and the Fluke 8600, MIET 20.100 meters. Through discussions with the M&TE
supervisor, it was determined that no records of Condition Identified (CIs)
or Nonconformance E(aluation Reports had been generated. The licensee's
administrative procedures required the M&TE user to report suspect "out of
tolerance" test equipment to the facility meter issue personnel.
When a suspect "out cf tolerance" test equipi.,ent item is identified, a CI
and a Nonconformance rvaluation Report are generated. In this manner a
formal review of other test data taken with the suspect test equipment can
be performed and an evaluation for safety-related concerns made. Since
none of the M&TE equipment listed on the test record had CIs or
Nonconfonnance Evaluation Reports generated during or af ter the usage
period, it appeared M&TE calibration was in-tolerance. Further, although
the as-found data were recorded using the suspect M&TE, the suspect M&TE
was not identified on the test record.
Through discussions with the licensee, it was postulated that the involved
technician recorded the "as-found" data with an out-of-tolerance test
meter and then turned the suspect meter into the facility meter issue
personnel. Upon receiving a good meter from the issue facility, the
technician took and recorded the "6s-left" data and the instrument identity
on the task card. The technician did not record the identity of the test
instrument with which the "as-found" data was measured. The licensee's
Administrative Procedure MD-1-021. Revision 1, "M&TE Accountability,"
required the MATE user to record the M&TE identity on the task card.
--. .--,. -
- - . - - _ - . _
.- - -.- . ---.
. _- _ - - _ _ _ .___ _ _ _ _ _ _ ____ _- - _ ___ ___ ____ _ _ ___ _ _ __ __ __-_ - ____________ _ _ _ __ _ _ - _ __ _ _ _ _ _ _ _ _ _ _ _ _
~
.
... . .
'
5
-
However, Adminsitrative Procedure MD-1-021 Revision 0, the procedure in
,
effect during the surveillance, did not specifically require the recording ,
of M&TE identity on the task card. The licensee stated that the general
- practice used by the 18C technicians is to record the identity of the M&TE
"
upon completion of the procedure. If during the procedure, a suspect
,
instrument is identified, the instrument is returned to the issue
i facility, and a good meter checked out. The procedure is then reperformed,
in toto, using the in-tolerance instrument and the M&TE identity is
recorded on the task card. t
. .
From the above discussion, there appears to be no safety significence in
that the licensee took and recorded the as-left data with an in-tolerance
meter. No adjustments were made to system instrumentation and the
identity of the good M&TE was recorded on the task card.
However, it is significant to note that the licensee's procedures for M&TE
accountability do not relate with the same specificity, in writing, as
fenerally practiced. Revision 1 of the M&TE accountability procedure
specifies that the identity of M&TE be recorded on the task card.
However, the implementation of this procedure is left to the
inttepretation of the M&TE user. M&TE traceability is vital to a
comprahensive M&TE program. If a general work practice is acceptable and
has shown success in its effectuation, then confusion and errors can be
avoided by incorporating the practice into the licensee's procedure. The
NRC inspectors concluded that the licensee should consider a revision to
'
the existing procedure to include more delineated guidance,
f Within tha scope of this inspection, no violations or deviations were
identified.
3. Verification of Reactor Coolant System (RCS) Leak Rates (61728)
During this inspection, the NRC inspectors reviewed the licensee's
procedure for RCS inventory leakage calculation. The following records
for RCS inventory accountability were reviewed:
.
- OP-903-024, Revision 6, dated March 30, 1988, 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br />
OP-903-024, Revision 6, dated March 30, 1988, 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br />
- OP-903-024, Revision 6, dated March 30, 1988, 1640 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.2402e-4 months <br />
- * OP-903-024, Revision 6, dated March 30, 1988, 1758 hours0.0203 days <br />0.488 hours <br />0.00291 weeks <br />6.68919e-4 months <br />
- OP-903-024, Revision 6, dated March 31, 1988, 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
The NRC inspectors verified that the licensee's calculating technique for
determining RCS leak rates was satisfactory. By utilizing the licensee's
RCS data und inputting this data into the NRC's RCSLK9 program, the NRC
inspectors verified the correctness of the licensee's calculated
"
identified and unidentified leak rates. For those leak rate results
outside the limiting conditions for operation, the NRC inspectors reviewed
.l the licensee's response and timeliness in identifying, isolating, and
i
I
- --a-mn e.e-y ? 4m'- y- yeryy-v -w-y, w mq- -
w e amy,-m =*+-y - - - - * = - - - - -
_ ., , . . _ . _ . - ___ . _ ~ - _ __ _. _
% e
-t * 'e e o
.
'-
'
_6 ,
f
1:
I reporting the incident to the NRC. In addition, the NRC inspectors
verified that post-event leak rates were within the acceptable limits of ;
the Technical Specifications.
'
i <
Within the scope of this inspection, no violations or deviations were i
identified.
'
4. Exit Interview
I
'
'
The NRC inspectors met with licenseo representatives denoted in Saction 1
on April 8, 1988, and summarized the scope and findings of the insoection.
The licensee did not identify as proprietary any of the materials trovided
to or reviewed by the inspectors during the inspection.
,
'.
'
I
s
>
i
,
t
- i
! t
I
i
l
ll
l
l' !
e
! l
I I
! ,
'
.. .-._ _ _- _ _ ..__.._, _ _. -._.._. _ _ . . . , _ . _ - . . , . _ . _ . _ _ , _ _ _ , . . - _ . , . _ . _ . _ . . _ _ - - _ .
___ _______ - _ _ _ . _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
. . .. ; .
\
ATTACHMENT
PROCEDURES AND RECORDS REVIEWED
Requirement /
, Component Description -Test Procedures
TS 4.1.2.2C Verify correct actuation of auto valves OP-903-029 R4
in boron injection flow path on SIAS
.
TS 4.1.3.4C Verify drop times-for full-length CEAs NE-02-020. R0
TS 4.3.2.1, Containment. spray (CSAS) containment MI-3-201, R4
Table 4.3-2, pressure high-high channel calibration OP-903-107, R3
Item 2.b
TS 4.3.2.1, SG level low and delta P high emergency MI-3-305,.R3
Table 4.3-2, feedwater(EFAS)tripchannel MI-3-306, R4
Item 7.b calibration MI-3-201, R4
4
TS 4.4.3.1.3a Verify pressurizer heaters are OP-903-028. R2
and b automatically shed from emergency power
sources on SIAS and verify heaters can
be energized from control room
TS 4.4.6 Verify dissolved oxygen, chlorine, and CE-2-006, R5
fluorine are within limits
TS 4.5.1d Verify SI tank isolation valves open OP-903-025, R1
when RCS pressure exceeds 535 psia and OP-903-029, R3 '
upon receipt of SI test signal ;
TS 4.5.2e1 Verify each auto valve in ECCS subsystem OP-903-029, R3 i
actuates to correct position on SIAS and OP-903-091, R2
RAS
TS 4.6.1.3c Verify only one door in each containment PE-5-024. R2 ' ,
air lock can be opened at a time OP-903-113, R0
TS 4.6.2.2b Verify that each containment cooling fan OP-903-029, R3 -
group starts automatically on SIAS and
4
verify cooling water flow g,1325 gpm
r
TS 4.7.3b Verify each CCW/ACCW valve servicing OP-903-029, R3
' safety-related equipment actuates to OP-903-036, R4
correct position on SIAS and CSAS test ,
< signals
1
,
, -m- y _ - a__. ._,y _ , . , _ . . _ - , - _ _ - - - - - - - - - , . _ _ . - , - . _ - - - - - - -
, , _ , ,
3, ,- s
- -
..., ' ,;
. . . . . . . - ,
'
2
.!
"
Requirement /
Component Description Test Procedures
'
TS 4.8.2.1d -Verify 125 VDC battery capacity is '
ME-3-230. R5
adequate
TS 4.7.10.1.1f Perform functional test of fire OPa903-056, R5 *
sup3ression water system by verifying OP-903-077 R2
eac1 pump delivers 2000 gpm at 100 psid, '
cycling each valve in flow path not
testable during plant operation, and ,
sequential pump start to maintain system
pressure at 96.5 psig-
TS 4.7.10.1.3c Inspection of diesel fire pumps 12 V ME-3-100, R2
starting batteries
.
'
IST/ Charging Test CVCS charging pump 00-903-003, R6
Pump A -
IST/ Valve Test valve in safety injection system OP-903-032, R5
SI-138A
ISI Mministrative procedure for controlling N0EP-251, RO
ISI
,
ISI/ Class 1 RCS Perform RCS leak check prior to startup QI-009-003,R1-
Pressure Boundary
IS7/ Weld 04-012 Perform UT inspection of weld WTR-ISI-47, R0
(RC)
ISI/ Weld 17-039 Perform UT inspection of weld WTR-ISI-206, R0
(SI) .
'
'
ISI/ Weld 42-022 Perform UT inspection of weld WTR-ISI-E06, R0,
FCI
(MS)
Perform UT inspection of weld WTR-ISI-206, RO,
ISI/ Weld 48-001
FCI
(FW)
Perform PT inspection of weld WTR-ISI-11, R0
ISI/ Weld 58-002
(CS)
Perform visual inspection of restraint WTR-IST4, R0
ISI/ Restraint
ACR-462 (AC) ,
ISI/ Spring Hanger Perform visual checks of spring hanger WTR-ISI-8, R0
, '
FWSH-348(FW)
- . . . - . .. .-. -.- - - . - - -. .- . - - - - , _ _ - .