IR 05000382/1988009

From kanterella
Jump to navigation Jump to search
Confirms Dates for Emergency Operating Procedure Insp 50-382/88-09 to Be Conducted on 880706-13.Insp Purpose Is to Verify That Emergency Operating Procedures Technically Accurate at Various Sites
ML20196L548
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/29/1988
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8807070590
Download: ML20196L548 (3)


Text

- . _ _ _ _ ____ ._ _ _ _ _ _ _ ________-

.- .. .

.

JUN 2 9 ggg In Reply Refer To:

Docket: 50-382/88-09 Louisiana Power & Light Company ATTN: J. G. Dewease, Senior Vice President

.

huclear Operations 317 Baronne Street New Orleans, Louisiana 70160 Gentlemen:

SUBJECT: EMERGENCYOPERATINGPRLCEDURE(E0P) INSPECTION This is to confirm the dates of the E0P inspection to be performed at Waterford 3 as discussed with Messrs. Robert Starkey and Dwight Baker of your staff. The E0P onsite inspection at Waterford 3 is to be performed during the period of July 6-13, 1988. An uit interview has been scheduled for July 14, 1988, at 9:30 As noted in Mr. Callan's letter of February 24, 1988, the purpose of the inspection is to verify at selected sites (Waterford 3 is the fourth of four CE sites to be inspected) that tl.e E0Ps are technically accurate; that their specified actions can be meaningfully accomplished using existing equipment, controls, and. instrumentation; and that the available procedures have the usability necessary to provide the operator with an effective operating too The inspection team consists of two senior reactor inspectors (Messrs. Jack'0'Brien l

and Perry Stewart), a licensing examiner (Mr. Leo D2fferding), a human factors specialist (Ms. Carol Tolbert), the St. Lucie resident inspector (Mr. Perk Bibb),

l and the Waterford 3 senior resident inspector (Mr. Ward Smith). In addition, I the CE E0P program manager (Jim Gagliardo) will accompany the team on July 5-8, 198 The inspection team is scheduled to start the inspection at 7:30 a m. on July 6, 1988. Site badging of the team and any required site-specific training l

l has been scheduled for July 6, 1988, from 7:30 a.m. to 10:30 a.m. The l

l inspection team's entrance interview is scheduled for July 6 at 10:30 a.m.

l Ms. Carol Tolbert will be badged for escorted access and the remainder of the team will be badged for unescorted acces Siaiulator availability for E0P walkdowns ilas been scheduled for Thursday and Friday, July 7-8 from 7:30 a.m. to 12 p.m. Use of the simulator for the performance of E0P scenarios has been scheduled for Thursday and Friday, July 7-8 from 12 p.m. to 4 p.m. Interviews of eight Control to ten reactor operations room and in-plant

'

personnel are scheduled for July 6-8 and 11,198 walkdowns have been scheduled for Monday and Tuesday July 11-12 from 8:30 to 3:30 qlV:DR - S ^ C:PSA D:DRP RS y iilhoan JEGagl (,/17/8 r /cjg )Jaudon

%/88 DChamberl (#ffi/88 I,JCallan b/N88 /U/88 g)

8807070590 880629

.-.

PDR Q ~

ADOCK 05000382

_- PDC ._ , - _ _ , _

h*

, -

L-

-

. - .

..

-

,

.

L Louisiana Power & Light Company -2-l Personnel identification information of the team members required for site badging has been previously forwarded and has also been included in the attached enclosur If you have any questions regarding the E0P inspection, please contact -

Mr. Gagliardo at (817)860-814

Sincerely, 051dinalsigneda

.ly [ E Jeudon' y James L. Milhoan, Director Division of Reactor' Safety Enclosure:

As stated cc w/ enclosure:

Louisiana Power & Light Company ATTN: . E. Wuller, Onsite Licensing Coordinator P.O. Box-B l

Killona, Louisiana 70066

,

Louisiana Power & Light Company ATTN: N. S. Carns, Plant Manager P.O. Box B Killona, Louisiana 70066 cc w/o enclosure:

Middle South Services ATTN: Mr. R. T. Lally P.O. Box 61000 New Orleans, Louisiana 70161 l

l Louisiana Power & Light Company ATTN: R. F. Burski, Acting Manager l

Nuclear Safety and Regulatory Affairs 317 Baronne Street P.O. Bvx 60340 New Orleans, Louisiana 70160 I

l Louisiana Radiation Control Program Director bec w/o enclosure: (seenextpage)

- -

.. _

. _ _ - - - _ - - _ _ _ _ _ _ . _ _ _ - .

'

.. . . . . .

- .

,

L

- Louisiana Power & Light Company -

3' -

bec to DMB w/o enclosure (IE51)

~

bec w/o enclosure distrib.-by RIV:

- SRI /W3-

'

R. D.:. Martin, RA-SectionChief(DRP/A)- -DRP. .

RPSB-DRS .

MIS System Project Engineer,-DRP/A RSTS Operator RIV File , D..Wigginton, NRR Project Manager DRS . .

Lisa Shea,; RM/ALF J. Gagliardo J. P. Stewart. RIV J. Persensky, NRR

,

1-i l

<

v 5 y e+4 -,. . , -.m-y, , - .. .,_- , , . ,, .. , . . _ , , ,, _ _ __