Forwards IE Insp Rept 50-348/79-19 on 790508-10.No Noncompliance Noted
ML20125A762
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/19/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML20125A765 List:
References
NUDOCS 7908170226
Download: ML20125A762 (2)


See also: IR 05000348/1979019

Text

,

h.

e

lIs

/'gaC,3 'o, UNITED STATES

i j , ,.'-*/,/(' j NUCLEAR REGULATORY COMMISSION

REGION 11

- e

'o,>k,'. f tot naanitTTA ST es.w suefs 3100

ATL ADf7 A. GE ORCIA 30303

g s .-.....f

In Reply Refer To: JUN 1 fr 1379

RII:EHB

50-348/79-19

Alabama Power Company

Atta: F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, Alabama 35291

Gentlemen:

This refers to the inspection conducted by E. H. Brooks of this office

on May 8-10, 1979 of activities authorized by NRC License No NPF-2 for

the Farley facility,IJnit 1, and to the discussion of our findings held

with J. Woodard at the conclusion of the inspection.

1

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Docu.sent Room.

6

.#

f 90sWOFM

. _ - .

- . .. .. - - _

j '\"

.

-

Alabama Power Company -2-

jut ! S G1

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

[.C.

R. C. was, Acting Chief

l Reactor Operations and

Nuclear Support Branch

Enclosure: i

Inspection Report No. 50-348/79-19 l

cc w/ enclosures: l

A. R. Barton  !

Executive Vice President  !

, Post Office Box 2641

Birmingham, Alabama 35291

J. T. Young

( Vice President-Production

Post Office Box 2641

Birmingham, Alabama 35291 l

H. O. Thrash '

Manager-Nuclear Generation

Post Office Box 2641

Birmingham, Alabama 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

Post Office Box 2641

Birmingham, Alabama 35291

W. G. Hairston III

Plant Manager j