h.
,
lIs
/'gaC,3
e
'o,
UNITED STATES
i j , ,.
NUCLEAR REGULATORY COMMISSION
-
>k,'.
'-*/,/(' j
REGION 11
e
'o,
f
tot naanitTTA ST es.w suefs 3100
g s .-.....f
In Reply Refer To:
JUN 1 fr 1379
RII:EHB
50-348/79-19
Alabama Power Company
Atta:
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, Alabama 35291
Gentlemen:
This refers to the inspection conducted by E. H. Brooks of this office
on May 8-10, 1979 of activities authorized by NRC License No NPF-2 for
the Farley facility,IJnit 1, and to the discussion of our findings held
with J. Woodard at the conclusion of the inspection.
1
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Docu.sent Room.
6
.#
f 90sWOFM
.
-
- .
.. ..
- -
-
.
'\\"
j
.
Alabama Power Company
-2-
-
jut ! S G1
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
[.C.
R. C.
was, Acting Chief
l
Reactor Operations and
Nuclear Support Branch
Enclosure:
i
Inspection Report No. 50-348/79-19
l
cc w/ enclosures:
l
A. R. Barton
!
Executive Vice President
!
Post Office Box 2641
,
Birmingham, Alabama 35291
J. T. Young
(
Vice President-Production
Post Office Box 2641
Birmingham, Alabama 35291
l
H. O. Thrash
'
Manager-Nuclear Generation
Post Office Box 2641
Birmingham, Alabama 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
Post Office Box 2641
Birmingham, Alabama 35291
W. G. Hairston III
Plant Manager
j
Drawer 470
!
'
Ashford, Alabama 36312
R. E. Hollands, Jr.
QA Supervisor
Post Office Box U