ML20064H919

From kanterella
Revision as of 18:05, 31 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
LER#78-086/03L-0 on 781221:both Trains of Component Cooling Water Were Discovered to Be cross-connected at Charging Pump 1B.FNP-1-STP-23.7 Was Rev to Show Alignment of Charging Pump 1B to Either Train
ML20064H919
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/21/1978
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20064H912 List:
References
LER-78-086-03L, LER-78-86-3L, NUDOCS 7812270309
Download: ML20064H919 (3)


Text