Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEARML20064F7011978-11-24024 November 1978 /03L-0 on 781025:during Pwr Oper,Intake Cooling Water Pumps Were Running When 3B Pump Motor Failed.The 3B Pump Motor Failed Because of Short Circuit in the Motor Windings ML20090E6071976-06-25025 June 1976 /01T:on 760611,boron Concentration of Injection Tank Below 20,000 Ppm Limit.Caused by Recirculation W/Low Concentration of Boric Acid Storage Tank B.Shutdown Initiated 1978-11-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
LER-2082-007, |
Event date: |
|
---|
Report date: |
|
---|
2502082007R00 - NRC Website |
|
text
une acau su v.s Nuctsan accutAtcav couuissics ti.m LICENSEE EVENT REPORT costaet stocat: 1 I I l l I l@ irtt Ast rai=T ea tvet ALL ancusato i=scauAtio=>
l,o l ,i l, [F 1sto LIT l P l Sl3 l@l. 0101 - 10.,o
,,gCco, ..
10101010 m -w .. . l - l 0l OGl - 411..u
- 2. l 11s,. 111 T..t ol@l.u.1 l l g CcN'T lo!il ,"'u ct [L,J@l O!5l O!n 10I ?!5 10l@l068151 2191 812 @ l016 121 34 818 12l40 @
AIPQAT3aT4 8 8 60 . COCdET hywege da SvtNT 0aT1 il svsur cascairTica Ano enceAets coNsscut=cas @
go ini l While performing a leak inspection inside Unit 3 Containment, several I
. firiT) I broken hangers and a broken snubber (#37) vere discovered on 3C steam I iTTTll generene blowdown lines. Closer impaction fo1ma evidence of approximate-I lo isi i ly 12 inches of line movement. This is reportable in accordance with I
! is i i T.S. 3.13.1. A new snubber was installed within 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> of the discovery 4 I
lo!) ] I I
lossil .0
- CE C E Sw3C g CQwptngNT COCE tus og 3N[ t IC t l lH! Il @ [E_j @ lB l @ IS IUl P!O !RI Tl@ :s
[D,J @ 11 @ 23 p 5 9 50 11 12 10 .t
$5 3vf 4TIAL CCOLaats;t age m; agvise;w svt%Tvtan ageomT 40. COCE T4 p t t;.
L
@ ,a;g ;gT a.aoI 812 I L-J 10 1017 I l'l 10131 ILI L--! LO_J
_, 2. 22 2 :. :> :. a :u r 2:
Ta % a T CN C 'LANT u T= seOwe$ $ 6 i som 3 3 seg.g was sag)sga
[c_j@t34x l@
- a lzl@
as L,z_J@
M l01 010! 0l 3; 4 1@
42 lAl@
e lu P i 01219 l@ as cAUSE cEsca;* TION ANC comatcTivt actions 27 ,
iiic,i1 The cause was determined to be hydraulic shock of the blowdown lines when 1 y I the. blevdown isolation valve is onened. "'his new blevdown syste- was t
,,,,,i installed during the recent steam generator repair outage. Special instruc-iii: tI tions for blowdown system operation have been issued. Bv followine the 1 iii.i ! sequence for valve lineup and operation, the hydraulic shocking is avoided. !
, . . .e
's;N[ % Ponte CTwgasTATV5 05 0 av Dis:Ovinv oE5CpiPTiON NA Visual inspection 1i i s l [G_J@ l 01 010 l@l l lCl@l !
a[TiviTV CD 7 twt egttagg esatata5E awou=T 08 aCTIVITV LOC ATICN OF R(LEA $g Iiis1 y @e [z_j@l NA 1 l NA
, . . io i,
%vwat" T'Pt CESC83PTices -
li i s i 1010 I Ol@LZJ@l NA l st ascaen g L NJ4piti
=cwste
- t3 mi'TICN NA l li 9110101 7 8 3 Ol@l it 12 BC iCSS Cs ga DawsCI "O tactL 'y Q Tveg :s s;miIC4 %r l e i s ! (z_j@l NA 30 t a 3 9 l7(Cl .g.g g @Og l On.r*.ON NA ! !I!!IliIllI' I 64 49 83 t 3 3 ?O P.L. Pace NautospaEPAaEn r=cNE.(305) 552-3654 8207060038 820628 PDR ADOCK 05000250 a fd d
REPORTABLE OCCURRENCE 250-82-007 Licensee Event Report Page two Additional Cause Description and Corrective Actions This blowdown system has only been in use for approximately two mcnths. It was installed when Unit 3 was shutdown for repair of the steam generators.
. The hydraulic shocking of the blowdown lines was noticed when the systen first went into operation. After analyzing the problem, it was concluded that tne hydraulic shock could be prevented by following a certain sequence of valve operations whenever the blowdown system was used. A set of special -
instructions was composed and then tested with various personnel observing the blowdown lines for movement. The results were satisfactory. In the future, the blowdown system will always be operated according to the special instructions.
Future modifications are being considered to enhance the blowdown system operation.
The broken snubber (No. 37) was a new snubber that was installed and inspected on Unit 3 according to MP-0707.2 during the steam generator repair outage. -
This snubber is not currently in our Technical Specification Table 3.13-1, but the proposed Technical Specification amendment to add this snubber has been submitted to the Commission. A new snubber was installed and inspected witnin 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.
- - - - .
|
---|
|
|
| | Reporting criterion |
---|
05000251/LER-1982-002, Forwards LER 82-002/01T-0 | Forwards LER 82-002/01T-0 | | 05000250/LER-1982-003, Forwards LER 82-003/03L-0 | Forwards LER 82-003/03L-0 | | 05000250/LER-1982-004, Forwards LER 82-004/03L-0 | Forwards LER 82-004/03L-0 | | 05000250/LER-1982-005, Forwards LER 82-005/03L-0 | Forwards LER 82-005/03L-0 | | 05000250/LER-1982-006, Forwards LER 82-006/03L-0 | Forwards LER 82-006/03L-0 | | 05000251/LER-1982-006, Forwards LER 82-006/01T-0 | Forwards LER 82-006/01T-0 | | 05000250/LER-1982-007, Forwards LER 82-007/03L-0 | Forwards LER 82-007/03L-0 | | 05000251/LER-1982-007, Forwards LER 82-007/01T-0 | Forwards LER 82-007/01T-0 | | 05000251/LER-1982-008, Forwards LER 82-008/03L-0 | Forwards LER 82-008/03L-0 | | 05000250/LER-1982-008, Forwards LER 82-008/03L-0 | Forwards LER 82-008/03L-0 | | 05000250/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | | 05000251/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | | 05000251/LER-1982-010, Forwards LER 82-010/03L-0 | Forwards LER 82-010/03L-0 | | 05000250/LER-1982-010, Forwards LER 82-010/03L-0 | Forwards LER 82-010/03L-0 | | 05000250/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | | 05000251/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | | 05000250/LER-1982-013, Forwards LER 82-013/03L-0 | Forwards LER 82-013/03L-0 | | 05000251/LER-1982-013, Forwards LER 82-013/03L-0 | Forwards LER 82-013/03L-0 | | 05000250/LER-1982-014, Forwards LER 82-014/01T-0 | Forwards LER 82-014/01T-0 | | 05000251/LER-1982-014, Forwards LER 82-014/03L-0 | Forwards LER 82-014/03L-0 | | 05000250/LER-1982-015, Forwards LER 82-015/03L-0 | Forwards LER 82-015/03L-0 | | 05000250/LER-1982-016, Forwards LER 82-016/03L-0 | Forwards LER 82-016/03L-0 | | 05000250/LER-1982-017, Forwards LER 82-017/03L-0 | Forwards LER 82-017/03L-0 | | 05000250/LER-1982-018, Forwards LER 82-018/01T-0 | Forwards LER 82-018/01T-0 | | 05000250/LER-1982-019, Forwards LER 82-019/03L-0 | Forwards LER 82-019/03L-0 | |
|