05000250/LER-2014-001, Regarding Missed Surveillance Test Resulted in a SG Pressure Instrument Channel to Be Inoperable Longer than AOT

From kanterella
(Redirected from 05000250/LER-2014-001)
Jump to navigation Jump to search
Regarding Missed Surveillance Test Resulted in a SG Pressure Instrument Channel to Be Inoperable Longer than AOT
ML14087A129
Person / Time
Site: Turkey Point 
Issue date: 03/04/2014
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-067 LER 14-001-00
Download: ML14087A129 (5)


LER-2014-001, Regarding Missed Surveillance Test Resulted in a SG Pressure Instrument Channel to Be Inoperable Longer than AOT
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(x)
2502014001R00 - NRC Website

text

0FPL.

L-2014-067 10 CFR § 50.73 March 4, 2014 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re:

Turkey Point Unit 3 Docket No. 50-250 Reportable Event: 2014-001-00 Missed Surveillance Test Resulted in a Steam Generator Pressure Instrument Channel to be Inoperable Longer than Allowed Outage Time The attached Licensee Event Report 05000250/2014-001-00 is submitted in accordance with 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by the Technical Specifications.

If there are any questions, please call Mr. Robert J. Tomonto at 305-246-7327.

Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant Attachment cc:

Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant Florida Power & Light Company

- gag 9760 SW 344th St., Florida City, FL 33035

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2013

, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

13. PAGE Turkey Point Unit 3 05000250 1 of 4
4. TITLE Missed Surveillance Test Resulted in a SG Pressure Instrument Channel to be Inoperable Longer than AOT YEAR Y

I SEQUENTIAL I

I NUMBER FACILITY NAME 2014 -

001 - 00 3

4 2014 t

11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR§: (Check all that apply)

I

10. POWER LEVEL

[- 20.2201(b)

E-20.2201(d)

El 20.2203(a)(I)

[3 20.2203(a)(2)(i)

El 20.2203(a)(2)(ii)

El 20.2203(a)(2)(iii)

El 20.2203(a)(2)(iv)

El 20.2203(a)(2)(v)

[] 20.2203(a)(2)(vi)

El 20.2203(a)(3)(i)

El 20.2203(a)(3)(ii)

El 20.2203(a)(4)

El 50.36(c)(I)(i)(A)

El 50.36(c)(I)(ii)(A)

El 50.36(c)(2)

El 50.46(a)(3)(ii)0 El 50.73(a)(2)(i)(A)

ED 50.73(a)(2)(i)(B)

El 50.73(a)(2)(i)(C)

[I 50.73(a)(2)(ii)(A)

El 50.73(a)(2)(ii)(B)

El 50.73(a)(2)(iii)

E] 50.73(a)(2)(iv)(A)

[E 50.73(a)(2)(v)(A)

El 50.73(a)(2)(v)(B)

El 50.73(a)(2)(v)(C)

[E 50.73(a)(2)(v)(D)

E] 50.73(a)(2)(vii)

E] 50.73(a)(2)(viii)(A)

E] 50.73(a)(2)(viii)(B)

El 50.73(a)(2)(ix)(A)

E] 50.73(a)(2)(x)

El 73.71(a)(4)

El 73.71(a)(5)

El OTHER Specify in Abstract below 100

____________________________________or_

inN C Fom3 6

12. LICENSEE CONTACT FOR THIS LER NAME TELEPHONE NUMBER Iinclude Area Code)

Paul F. Czaya 1

305-246-7150CAS YTMCMOET MANU-REPORTABLE CAS YSE OMPNN MANU-REPORTABLE

CAUSE

COMPONENT FACTURER TO EPIX

CAUSE

COMPONENT FACTURER TO EPIX

14. SUPPLEMENTAL REPORT EXPECTED
15. EXPECTED MONTH DAY SUBMISSION E] YES (Ifyes, complete 15. EXPECTED SUBMISSION DATE)

Z NO DATE ABSTRACT (Limit to 1400 spaces. i.e., approximately 15 single-spaced typewritten lines)

On January 3, 2014 with the Unit 3 reactor in Mode 1 at 100% power, the instrument channel associated with Main Steam Line Pressure Transmitter PT-3-495 was found outside procedural acceptance criteria due to PT drift. PT-3-495 was replaced, calibrated successfully, and returned to service on January 4, 2014. Subsequent review determined the instrument channel was inoperable from March 9, 2013 to January 3, 2014. During the period of inoperability, the allowed outage time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> was exceeded without taking the required action to place the channel in the tripped condition and the shutdown actions of Technical Specification (TS) 3.0.3 were not entered. This event is reportable in accordance with 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by the TS. The root cause is attributed to a deviation from the normal process of using a dedicated work order (WO) to satisfy surveillance requirements. As result, Instrumentation and Control supervision failed to validate WO activities credited for satisfying TS requirements. As corrective action, the surveillance tracking program procedure will be revised to state that an independent verification is to be performed and documented prior to approval that a surveillance test has been completed when crediting non-dedicated WOs. An extent of condition review was also performed. Safety significance remained low during the period the instrument channel was inoperable because both redundant channels remained available.

NRC FORM 366 (10-2010)

DESCRIPTION OF THE EVENT On January 3, 2014 with the Unit 3 reactor [AC, RCT] in Mode 1 at 100% power during performance of the channel calibration surveillance procedure for Main Steam Line Pressure Transmitter [JE, PT] PT-3-495, the instrument channel was found outside procedural acceptance criteria due to PT drift. PT-3-495 was replaced, calibrated successfully, and returned to service on January 4, 2014.

PT-3-495 drifted such that the output was higher than the actual value of steam pressure and its associated trip function would not have protected the safety analysis limit rendering the channel inoperable. Subsequent review determined the instrument channel is considered inoperable from the time of the due date for a missed surveillance test of March 9, 2013 to January 3, 2014.

During the period of inoperability, the instrument channel associated with PT-3-495 remained in service exceeding the allowed outage time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> with the required action to place the channel in the tripped condition not taken and the shutdown actions of Technical Specification (TS) 3.0.3 not entered. Therefore, this event is reportable in accordance with 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by the TS.

CAUSE OF THE EVENT

The root cause is attributed to a deviation from the normal process of using a dedicated work order (WO) to satisfy Surveillance Requirements (SR), which created an error likely situation for which no compensatory action was established. As result, Instrumentation and Control (I&C) supervision failed to validate WO activities credited for satisfying TS requirements.

ANALYSIS OF THE EVENT

Background

PT-3-495 is an input to Engineered Safety Features Actuation System TS Table 3.3-2, Functional Unit 1.e, High Differential Pressure Between the Steam Line Header and any Steam Line. PT-3-495 provides the Steam Generator (SG) [SB, SG] 'C' Channel III pressure signal for this function. SG pressure is equivalent to Steam Line pressure referred to in the TS. This function is required in Modes 1, 2 and 3 (Mode 3 if Pressurizer [AB, PZR] pressure is greater than or equal to 2000 psig). This transmitter also provides the steam pressure correction for the Steam Flow/Feedwater Flow mismatch coincident with SG Water Level -

Low reactor trip signal (TS Table 3.3-1, Functional Unit 12). Any error in measured steam flow affects the accuracy of the steam flow computation.

The function provided by PT-3-495 is used in the analysis for secondary side high energy line breaks. The transmitter provides the pressure signal (one of three channels) for the individual steam line associated with the 'C' SG to the instrument channel. The function initiates safety injection (SI) [BQ], feedwater line isolation, and steam line isolation.

Updated Final Safety Analysis Report, Chapter 14, Section 14.2.5 describes the Steam Line Rupture accident analysis. In this analysis, steam release from more than one SG will be prevented by automatic closure of the Main Steam Isolation Valves (MSIV) [SB, ISV] in the steam lines either by high containment [NH] pressure signals or by high steam flow coincident with low steam line pressure. For a break upstream of the MSIVs, MSIV closure is not required due to the presence of the Main Steam Check Valves [SB, SHV], which prevent blowdown of the non-faulted SGs. In this case, SI actuation would occur from high differential steam pressure between the faulted steam line and the main steam header.

SI is actuated by high steam line differential pressure in any loop. The differential pressure signals are derived by two out of three low steam line pressure signals in one line compared with main steam header pressure. The SI signal will subsequently trip the reactor and actuate main feedwater isolation. A manual block of this signal is allowed when Pressurizer pressure is below 2000 psig. The SI System provides borated water to the reactor core during a steam line break in order to counter any positive reactivity insertion due to cool down of primary coolant. Main feedwater isolation and steam line isolation are initiated to limit primary system cool down and to limit the mass and energy releases through the break.

Analysis On April 26, 2011, PT-3-495 was successfully calibrated. An I&C supervisor incorrectly approved the next surveillance test as complete. The approval was based on the review of WOs associated with replacement of instrument channel modules; however, while the WOs did specify post maintenance tests they did not include calibration of the associated transmitter. Normally, a dedicated WO would be used for the surveillance test.

As a result, the TS SR for calibration was not met. This missed SR was subsequently recognized and the test was performed on January 3, 2014 which determined the channel had been inoperable.

While a specific date cannot be established for when the transmitter drifted out of specification, the date the missed surveillance was due of March 9, 2013 is used consistent with the guidance in NUREG-1022, Revision 3, Section 3.2.2 for the start of inoperability. The transmitter was in a degraded condition likely due to age and was replaced.

Reportability

The TS Limiting Condition for Operation (LCO) 3.3.2, Table 3.3-2, Functional Unit 1.e requirement for three operable channels was not met during the period of inoperability. Because the required action to place the channel in trip was not met within the allowed outage time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the shutdown actions of TS 3.0.3 were not entered a condition prohibited by the TS existed, reportable in accordance with 10 CFR 50.73(a)(2)(i)(B).

ANALYSIS OF SAFETY SIGNIFICANCE While Steam Generator Pressure Channel III could respond to the lower pressure of a steam line break, it could not do so within its required range and so was inoperable. Safety significance remained low during the

period Channel III was inoperable because both redundant Channels II and IV (there is no Channel I) remained available and were proven to be operable by the performance of their respective surveillances.

Regarding the failure of Channel III, the assumed failure of PT-3-495 has no noticeable impact on Core Damage Frequency (CDF). Any delta CDF is well below the NRC threshold of 1E-6 per year for low risk significance.

CORRECTIVE ACTIONS

Corrective actions are in accordance with condition report 1938191 and include the following:

1. PT-3-495 was replaced, the channel was tested satisfactorily and returned to service.
2. The surveillance tracking program procedure will be revised to state that an independent verification is to be performed and documented in the surveillance tracking program prior to approval that a surveillance test has been completed when crediting non-dedicated WOs.
3. A review of WOs was conducted to ascertain the extent of condition.

ADDITIONAL INFORMATION

EIIS Codes are shown in the format [IEEE system identifier, component function identifier, second component function identifier (if appropriate)].

FAILED COMPONENTS IDENTIFIED: Rosemount Pressure Transmitter 1153GB

PREVIOUS SIMILAR EVENTS

None