IR 05000456/2019011

From kanterella
Revision as of 01:13, 2 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRC Inspection of Temporary Instruction 2515/194, Inspection of the Licensee'S Implementation of Industry Initiative... in Electric Power Systems (NRC Bulletin 2012-01) Report 05000456/2019011 and 05000457/2019011
ML19353B470
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/19/2019
From: Robert Daley
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019011
Download: ML19353B470 (10)


Text