Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000456/2020004; 05000457/2020004
ML20238B869
Person / Time
Site: Braidwood  
(NPF-072, NPF-077)
Issue date: 08/25/2020
From: Vance Petrella
NRC/RGN-III/DRS/EB2
To: Bryan Hanson
Exelon Nuclear
References
IR 2020004
Download: ML20238B869 (9)


See also: IR 05000456/2020004

Text

August 25, 2020

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000456/2020004;

05000457/2020004

Dear Mr. Hanson:

On November 16, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite

portion of the Triennial Heat Sink Performance Inspection at your Braidwood Station Units 1 and

2 Nuclear Power Plant. This inspection will be performed in accordance with NRC baseline

Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than September 21, 2020. By

October 2, 2020, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers, should

be available at the Regional Office no later than November 2, 2020. This information should

be separated for each selected component, especially if provided electronically (e.g., folder

with component name that includes calculations, condition reports, maintenance history,

etc.). During the in-office preparation activities, the inspector may identify additional

information needed to support the inspection.

The last group includes the additional information above as well as plant specific reference

material. This information should be available at the Regional Office no later than

November 9, 2020. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period. It is important that these documents be as

B. Hanson

- 2 -

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

The lead inspector for this inspection is Vance Petrella. We understand that our licensing

contact for this inspection is James Mark of your organization. If there are any questions about

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9847 or via e-mail at Vance.Petrella@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Vance Petrella, Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-456; 50-457

License Nos. NPF-72; NPF-77

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

B. Hanson

- 3 -

Letter to Bryan C. Hanson from Vance Petrella dated August 25, 2020.

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000456/2020004;

05000457/2020004

DISTRIBUTION:

Jessie Quichocho

Elise Burket

RidsNrrDorlLpl3

RidsNrrPMBraidwood Resource

RidsNrrDroIrib Resource

John Giessner

Kenneth OBrien

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML20238B869

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

VPetrella:mb

via e-mail

DATE

08/25/2020

OFFICIAL RECORD COPY

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000456/2020004; 05000457/2020004

Inspection Dates:

November 16 - 20, 2020

Inspection Procedure:

IP 71111.07, Heat Sink Performance

Lead Inspector:

Vance Petrella

630-829-9847

Vance.Petrella@nrc.gov

Please provide the information electronically in pdf files, Excel, or other searchable formats,

preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic

media should contain descriptive names and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

I.

Information Requested by September 21, 2020

1.

List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2.

Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3.

List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous three years or since the last corrective action

program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all corrective action program documents not on

the last corrective action program document list.

4.

Copy of any self-assessment done on any of GL 89-13 heat exchangers, Ultimate

Heat Sink (UHS), and safety-related service water systems since the last heat sink

performance inspection.

5.

Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers, UHS, and safety-related service water systems.

6.

List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

2

7.

List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers, UHS, and safety-related service water systems.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous heat

sink performance inspection.

8.

Electronic copies of the current Final Safety Analysis Report, Technical

Specifications, Technical Specifications Basis, Technical Report Manual, and

Technical Report Manual Basis.

9.

List of enhancements and/or commitments made during license renewal for

GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems (as applicable).

10.

Electronic copies of the current Probability Risk Assessment (PRA) Summary Note

Books.

11.

Provide an electronic copy of piping and instrumentation diagrams (P&IDs) for the

safety-related service water system, including the intake structure.

II.

Information Requested by November 2, 2020

1.

Copies of the GL 89-13 responses.

2.

Copies of procedures developed to implement the recommendations of GL 89-13

(e.g. the GL 89-13 Heat Exchanger Program description).

3.

Copies of the selected corrective action program documents.

4.

For the specific heat exchangers selected:

a. Copies of the UFSAR sections applicable for each heat exchanger.

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Provide the calculations or evaluations that:

i. Establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. Demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. Correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. Evaluate the potential for water hammer in each heat exchanger or

associated piping; and

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

3

v. Evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the construction code, design specification, heat exchanger data sheets,

and vendor documents including component drawings applicable for the heat

exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

g. Copies of the Aging Management Programs (AMP) and the implementing

procedures that manage aging of the selected heat exchangers (as applicable).

5.

For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)

sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g. UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

e. Copy of the construction code and design specification.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems.

g. Copies of corrective action documents associated with water hammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

h. If available, provide electronic copies of the structural drawings of the intake

structure and Ultimate Heat Sink.

i.

Provide a list of calculations (with a short description), which currently apply to

UHS and safety-related service water system.

j.

Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service water system and/or UHS.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

4

k. Provide a list of any design change (with a short description) performed on the

UHS or safety-related service water system since the last heat sink performance

inspection.

l.

Copies of the AMPs and the implementing procedures that manage aging of the

UHS (including the intake structure) and the safety-related service and closed

cooling water systems (as applicable).

6.

A schedule of all inspections, cleanings, maintenance, or testing of any safety-

related plant heat exchanger to be performed during the on-site portion of the

inspection.

III.

Information Requested by November 9, 2020

1.

For the specific heat exchangers selected:

a. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested.

b. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

c. Information regarding any alarms which monitor on-line performance.

d. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

e. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

f. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded.

g. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping.

h. The documents that describe the controls that prevent heat exchanger

degradation due to excessive flow induced vibration during operation.

i.

Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

5

j.

Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

k. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

l.

Copies of the documents that verify the structural integrity of the heat exchanger

(e.g. eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

m. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

n. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers, including those credited by any AMPs (as

applicable).

o. Copies of any credited AMP monitoring/inspection results for the selected heat

exchangers (as applicable). The requested documents are to be for any

completed monitoring/inspection in the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

2.

For the UHS:

a. Copies of the inspection procedures for the verification of the structural integrity

of underwater UHS and the associated results. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection.

b. Copies of the maintenance and/or inspection procedures for underwater UHS

sediment intrusion and the associated results including underwater diving

inspections and/or sediment removal activities. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection.

c. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

d. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

3.

For the review associated with the system walkdown of the service water intake

structure:

a. Copies of corrective maintenance for the last 6 years associated with service

water strainers, traveling screens and trash racks.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

6

b. Copies of the last two inspections and/or surveillances associated with service

water strainers, traveling screens and trash racks.

c. List of preventive maintenance, including frequency, associated with service

water strainers, traveling screens and trash racks.

d. Copies of abnormal procedures for the traveling screens and service water

strainers.

e. Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to corrosion). For

example, inspections for the mounts for the, Service water pumps, service water

strainers, traveling screens and trash racks.

f. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

g. Copies of surveillance procedures and testing results performed on the service

water pump bay water level instruments. The requested documents are to be for

the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

h. Copies of procedures associated with operating during adverse weather

conditions (e.g. icing, high temperatures, or low level).

i.

Copy of the evaluation for the potential effects of low flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable.

j.

Copies of any credited AMP monitoring/inspection results for the safety-related

service and closed cooling water systems, and the UHS (as applicable). The

requested documents are to be for any completed monitoring/inspection in the

time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

If the information requested above will not be available, please contact Vance Petrella as soon