ML23095A129

From kanterella
Jump to navigation Jump to search

Steam Generator Tube Inspection Report for Refueling Outage 23
ML23095A129
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 04/05/2023
From: Gugle G
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23095A128 List:
References
BW230019
Download: ML23095A129 (1)


Text

Constellation.

April 5, 2023 BW230019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Unit 1 Renewed Facility Operating License No. NPF-72 NRC Docket No. STN 50-456 Constellation Energy Generation, LLC (CEG)

Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 www constellationenergy.com

Subject:

Braidwood Station, Unit 1 Steam Generator Tube Inspection Report for Refueling Outage 23 In accordance with Technical Specification 5.6.9, "Steam Generator (SG) Tube Inspection Report,"

Constellation Energy Generation, LLC (CEG) is reporting the results of the SG inspections that were completed during Braidwood Station, Unit 1 Refueling Outage 23 (A 1 R23).

Please direct any questions you may have regarding this submittal to Mr. Dane Brunswick, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, Gugle, Greg Gregory Gugle Site Vice President Braidwood Station

Attachment:

Braidwood Station, Unit 1 Steam Generator Eddy Current Inspection Report Refueling Outage 23 (A 1 R23), October 2022 cc:

NRC Regional Administrator, Region Ill NRC Senior Resident Inspector-Braidwood Station NRC Project Manager, NRR - Braidwood and Byron Stations Illinois Emergency Management Agency-Division of Nuclear Safety