MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRC FoRM 195 (2 78)
U.S. NUCLEAR REGULATORY COMMISSIO 0-DOCKET NUMBER FILE NUMBER 25 NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL IeNTHL TO: FROMI DATE OF OOCUMENT Florida Power 6 Light Company ll/S/77 /
Hi Ri Co Miami, Florida OATE RECEIVED I Ai Di Schmidt ll/ll/77 QLETTER Q NOTOR IZE O ,
PROP INPUT FORM NUMBER OF COPIES RECEIVEO Q OR IG INAL QUNCLASSIFIE 0 QCOI V DESCRIPTION Letter trans the f'ollowing.'NCL.OSURE Month~ Report l;or October'977 Plant & Component Operability &, Availability.
Thi.s Report to be used in preparing Gray Rook by PlanS h Operations.
(1-P) (9-P)
PLANT QME Turkey Point Units 3 8 4 Sti Lucie Unit 1 RJL 11/14/77 FOR ACTION/INFORMATION INTERNAL D ISTR I BUTION nc e EXTERNAL DISTRIBUTION CONTROL NUMBER
~ Arear
/ lv0103 NRC FORM 19d I2 7d)
ggP!(fY 11L @Pl
~m(ggIt I
FLORIOA POWER & LIGHT COMPANY November 5, 1977 Office of Management, Information and Program Controls U. S. Nuclear Regulatory Commission Nashington, D. C. 20555 Gentlemen:
Attached are the October, 1977, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire 77n1 ~rr01 Qe PEOPLE... SERVING PEOPLE
0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
Turkey Point UNIT Unit No. 3 DATE COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH OCTOBER 1977 DAY AVERAGE DAILY POWER .LEVEL DAY AVEBAGE DAILY PO~ LEVEL I (Nfe-Net) (MWe-Net) 593 17 622 629 18 623 3 636 19 618 639 20 5 639 21'2 620 635 620 636 622 637 24 618 639 25 615 10 637 26 615 632 27 615 12 573 28 610 13 624 29 615
'4 625 30 632 15 625 633 16 624
OPFRATING DATA REPORT DOCKET NO.
DATE Kg~~77 COhiPLETED BY >-T. Chilson TELEPHONE ~305 552-3525 OPERATING STATUS Notes
- 1. Unit Name:
- 2. Reportfng Period: October 1977
- 3. I.icensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum De p endable Ca p acit y(Net MWe: )
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe): NO.
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumulative I
- 11. Hours In Reporting Period 7 296.0 43'17..6
- 12. Number Of Hours Reactor Was Critical 633.0 34 673.1 13, Reactor Reserv~ Shutdown Hours 43.7 ill.2.
'4. 743.8 6 495. 0 33" 534;1 Hours Generator On-Line 85.0
- 16. Gross Thermal Energy Generated (MWH) 1 628 892 13 960 533 65 690 121 489 515 386 811 20 957 262
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (hIWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor' 464 396 99.8 99 ~ 8 .
89 89.0
..0'7..
4 163 971' " 19'39 78.1 906 9
- 21. Unit Capacity Factor (Using MDC Net) 85.7 70.1
- 82. 4 '66.5 0.2, 2.6 2.9'
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each)
Refuelin maintenance and ins ections - Hov. 19 1977 Jan. 16. 1978
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhlMERCIAL OPERATION
.) REASON APPENDIX D DOCKET NO. 50 - 250 A: +UIPHEHT FAILURE (EXPIAIH) Turkey Point B: Eihiiff. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAEIE Unit Ho. 3 C: REFUEI.IHC D: REGULATORY RESTRICTIOH DATE Nov. 5 1977 E: OPCRATOR TRAIHINC AND I.ICEHSE EXAMIHATIOH COHPI.ETED BY V. T. Chilson F: ADIIINISTRATIVE -
C: OPERATIONAL ERROR (EXPIAIN) REPORT HONTN OCTOBER, 1977 TELEPHONE (305) 552 3824 H: OTHER (EXPIAIN)
) EIETNOD 1: HANUAI, . HETHOD OF 2: EIANUAI. SCRAH TYPE S)EUTTINC DOWN 3: AUTOHATIC SCRAH F: FORCED DURATION THE REACTOR OR 4: 01 IIER (EXPIAIN) NO. DATE S: SCHEDULED (IIOURS) REASON(1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/COEIMENTS 25 77-10-12 1.2 Unit trip caused by malfunction of the generator voltage regulator. Corrective actions included repairing a faulty component in the voltage regulator control system. (Hon-nuclear system)
SUMMARY
- Unit No. 3 operated at approximately 100X R.P., except for outage on Scptembcr 12, 1977.
0 I
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 251 Turkey Point UNIT Unit No. 4 DATE Nov. 5 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH OCTOBER, 1977 DAY AVERAGE DAILY POWER. LEVEL DAY AVERAGE DAILY PO~ LEVEL (MWe-Net) (MWe-Net) 658 17 668 657 18 671 3 652 19 665
~
4 655 20 665 5 672 21 665 675 22 666 673 672 674 24 62 670 25 647 10 664 26 648 658 27 647 12 658 28 269 657 . 29 14 670 30 674 31 16 670 VaOTE: Average daily power greater than 666 MÃe due to cooler condenser cooling water.
OP~cTING DATA REPORT DOCKET NO.
D4TE Hov. 5 1977 C051PLETED BY ~V. Chllson TELEFHOHE ~30 552-3524 OPERATING STATUS Notes
] Unit Name Turke Po U 1 o
- 2. Reporting period: October 1977
- 3. Licensed Thermal Power (MWt):
s
- 4. Namephte Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net hWe) t
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
IfAny (Net MWe): NONE
- 9. Power Level To Which Restricted,
- 10. Reasons For Restrictions, IfAny:
s This Month Yr:to.Date Cumulative ..
- 11. Hours In Reporting Period
' 45. 7 296.0 36'45.0
- 12. Number Of Hours Reactor Was Critical 659.3 4 553.3 26 275.0
- 13. Reactor Reserve Shutdown Hours 438.8:-
- 15. Unit Reserve Shutdown Favours 16.'ross Thermal Energy Generated (MWH) 1 443 071 457 595 3 049 807 17 007 490
'620
'7.9
- 17. Gross Electrical Energy Generated (MWH) 435 282 ' 890 520 &86
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 60..4 67.. 9
- 20. Unit Availability Factor 60.4
,21. Unit Capacity Factor (Using MDC Net) 59.5 66.5
- 23. Unit Forced Outage Rate 2.4 3.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
s
- 25. IfShut Down At End Of Report Period, Estimated Date nf Startup:
Nov. 11, 1977
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (9/77)
APPEtiDIX D DOCKET tlo.
.) REASotl Turkey Point h: EQUIPHEHT FAII.URE (EXPLAIN) UNIT SIIUTIMMHS AND POIIER REDUCTIONS UNIT NAHE Unit Ho. 4 B: HhltlT. OR TEST C: REFUEI.IHG DATE Nov. 5 1977 D: REGUIATOIIY RESTRICTION E: t)l'ERATOR TRAIHIHG AHD COHPIZTED BY V. T. Chilson LICFNSE EXAHINATIOH F: AIIHINISTRATIVE TELEPHONE (305) 552-3824 G: OPERATIOHAI. ERROR (EXPLAIN) REPORT HOHTII OCTOBER. 1977 II: OTHER (FBPLAItl)
) tlETIIOD I: HAtlUAL . HETNOD OF 2: HAHUAL SCRAII TYPE SNUTTIHG DOMN 3- AUIYIIIATICSCRAII Fi FORCED DURATION THE REACTOR OR 4: OTIIER (EXPLAIN) HO. DATE 8: SCIIEDULED gIOURS) REASON(1) REDUCING POMER(2) CORRECTIVE ACTIONS/COHHEHTS 16 77-10-28 86.0 Unit was removed from service to locate and repair tube leak in steam generator No. 4B. Corrective actions included plugging one leaking tube. (Huclear system)
SUHHARY: Unit No. 4 operated at approximately 10OX R.P. until October 28, 1977, when the unit was removed from service to repair steam generator No. 4B tube leak.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 St. Lucie UNIT Unit No.'
DATE Nov. 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH OCTOBER 1977 DAY AVERAGE DAILY POWER .LEVEL DAY AVERAGE DAILY POtPuR L VEL (Nfe-Net) (MRe-Net) 17 789 18 791 3 19 791 20 779 21 763 22 792 793 24 770 25 790 10 232 26 790 740 27" 776 12 773 28 .
652 13 785 29 666 14 787 30 754 789 31 686 16 789 NOTE: Average daily power greater than 777 MWe due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NO.
DATE 3hz '~977 COMPLETED BY TELEPHONE 3LZ
~305
~son 552-3824 OPERATING STATUS St. Lucie Unit No. 1 Notes I Umt Name:
- 2. Reportmg Period: Oct:ober 1977
- 3. Licensed Thermal Power (44IWt) t
- 4. Namephte Rating (Gross hIWe):
- 5. Design Electrical Rating (Net MWe):
22
- 7. Maximu m De pe ndable Ca p acit y(Net MWe: 777
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
IfAny (Net MWe): NONE
- 9. Power Level To Which Restricted,
- 10. Reasons For Restrictions, If Any:
~
~ I ~ ~
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
'45. This Month 0
523 ~ 3 Yr.-to-Date 6 182.5 1
Cumulative .
7 6
560.0 446.5
- 13. Reactor Reserve Shutdown Hours
- 15. Unit Reserve Shutdown E3ouzs JlilL -0'-
101;5.
.'101.5
- 17. Gross Electrical Energy Generated (MWH) 414 4 502 280 4 610 550
'4 ' 4" 322'96
- 18. Net electrical Energy Generated (hIWH) 390 160 223 721
- 20. Unit Availability Factor 69.4 . 81;8 82.4
- 21. Unit Capacity Factor (Using MDC Net) 67.4 73.6 ..
Unit Forced Outage Rate I>>'3.
12.3 11.
- 24. Shutdowns Scheduled Over Next 6 hlonths (Type. Date, and Duration of Each): ~
9'97&
Refuelin maintenance and ins ections March 15 June 6
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COhlhIERCIAL OPERATION (oI77)
APPENDIX D DOCKET NO. 50 - 335
) REASON St. Lucis A: EqUIPNL'NT FAILURE (EXPLAIN)
UHIT SllUTDOWNS AND POWER REDUCTIONS UNIT HAHE Unit No. 1 B: HAINT. OR TIST C RL'FUbl IN( DATE Nov. 5 1977 D: REGULATORY RESTRICTIOH E: OPERATOR TRAINING AND COHl LETED BY V. T. Cbilson LICENSE EXAHINATION F: ADNIHISTRATIVE TELEPHONE (305) 552"3824 C: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (FAPLAIN)
) HETIIOD I: HAHUAL . HETHOD OF SllUTTINC DOWN 2: HANUAL SCRAH TYPE 3: AUTOHATIC SCRAH F: FORCED DURATION THE REACTOR OR 4: OTHER (EXPLAIN) HO. DATE S: SCHEDUr.ED (HOURS) REASON(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/COtlHEHTS 33 77-09-24 228.0 Unit was removed from service to perform preliminary warranty inspection. (Continued from previous montb)
(Nuclear and non-nuclear systems)
SUHHARY: Unit was returned to service on October 10, 1977, following completion of scheduled outago to perform preliminary warranty inspection.