|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:':.ACCELERATE DOCUMENT'T DIS'I'RIB | | {{#Wiki_filter:':.ACCELERATE DOCUMENT'T DIS'I'RIB'I'ION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)CCESSION NBR:9309170236 DOC.DATE: 'PO&jKSX NOTARIZED: |
| 'I'IONSYSTEMREGULATINFORMATION DISTRIBUTION STEM(RIDS)CCESSIONNBR:9309170236 DOC.DATE: | | NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power a Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION WHITEiC.Florida Power 6 Light Co.SAGER,D.A. |
| 'PO&jKSXNOTARIZED: | | Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000335 05000389 |
| NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPoweraLightCo.50-389St.LuciePlant,Unit2,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATION WHITEiC.FloridaPower6LightCo.SAGER,D.A.
| |
| FloridaPower6LightCo.RECIP.NAME RECIPIENT AFFILIATION DOCKETN0500033505000389
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MonthlocratingreptsforAug1993forStLucie,units 1&2.W/30913ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:SRECIPIENT IDCODE/NAME PD2-2LANORRIS,JINTERNAL:
| | Monthl o crating repts for Aug 1993 for St Lucie,units 1&2.W/30913 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: S RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL: EGSG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA R DORS OEAB RE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D NOTE TO ALL"RIDS" RECIPIENTS: |
| ACRSAEOD/DSP/TPAB NRR/DRIL/RPEB RGN2EXTERNAL:
| | PLEASE HELP US TO REDUCE WASTE!CONTACI'IIE DOCUMENT CON'I'ROL DI'SV, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRII3U'I'ION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 I |
| EGSGBRYCE,J.H NSICCOPIESLTTRENCL331110101111111111RECIPIENT IDCODE/NAME PD2-2PDAEOD/DOARDORSOEABRE01NRCPDRCOPIESLTTRENCL1111111111DNOTETOALL"RIDS"RECIPIENTS:
| | P.O.Box 1, Ft.Pierce, FL 34954-0128 September 13, 1993 L-93-231 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos~50-335 and 50-389 Attached are the August, 1993, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us.Very truly yours, D.A.Vice St.Lu ger sident e Plant DAS/CDW/kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL¹986-93 9309170236 S'30831 PDR ADOCK 05000335 j c'UUDO an FPL Group company t II J I~~enaW>' |
| PLEASEHELPUSTOREDUCEWASTE!CONTACI'IIE DOCUMENTCON'I'ROL DI'SV,ROOMPl-37(EXT.504-2065)
| | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE: |
| TOELIMINATE YOURNAMEFROMDISTRII3U'I'ION LISTSFORDOCUMENTS YOUDON'TNEED!DTOTALNUMBEROFCOPIESREQUIRED:
| | 50-335 St.Lucie g1 9/9/93 C.WHITE (407)468-4248 MONTH AUGUST 1993 DAY 8/01/93 8/02/93 8/03/93 8/04/93 8/05/93 8/06/93 8/07/93 8/08/93 8/09/93 8/10/93 8/11/93 8/12/93 8/13/93 8/14/93 8/15/93 8/16/93 8/17/93 8/18/93 8/19/93 8/20/93 8/21/93 8/22/93 8/23/93 8/24/93 8/25/93 8/26/93 8/27/93 8/28/93 8/29/93 8/30/93 8/31/93 AVERAGE DAILY POWER LEVEL (MWe-Net)848 847 848 852 851 853 855 856 852 849 844 843 842 846 851 847 844 843 848 844 841 840 841 838 839 785 827 841 840 637 478 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 9/9/93 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCXE UNIT 1 2.REPORTING PERIOD: AUGUST 1993 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER'THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRXTICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABXLXTY FACTOR 21'APACITY FACTOR (USING MDC NET)22'APACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744.0 0.0 744.0 0.0 1964337 647140 613680 100.0 100.0 98.3 99.4 0.0 5831 4024.3 0.0 3891.2 0.0 10262104 3400210 3208360 66.7 66.7 65.6 66.3 0.0 146351.0 112694.9 205.3 111566.7 39.3 288597814 95260110 90034230 76.2 76.3 75.7 75.0 3.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: |
| LTTR24ENCL24 I
| | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 9/9/93 COMPLETED BY: C.D.WHITE TELEPHONE: |
| P.O.Box1,Ft.Pierce,FL34954-0128 September 13,1993L-93-23110CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Re:St.LucieUnits1and2DocketNos~50-335and50-389AttachedaretheAugust,1993,Operating StatusandSummaryofOperating Experience ReportsforSt.LucieUnits1and2.Shouldtherebeanyquestions onthisinformation, pleasecontactus.Verytrulyyours,D.A.ViceSt.LugersidentePlantDAS/CDW/kw cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantAttachments DAS/PSL¹986-939309170236 S'30831PDRADOCK05000335jc'UUDOanFPLGroupcompany tIIJI~~enaW>' | | (407)468-4248 REPORT MONTH A G T 1 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 930830 0.0 B N/A HF PUMPXX Unit 1 decreased power due to a circulating water pump low lube water flow alarm.Unit 1 was returned to 1009o power on September 1, 1993.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training dt License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licenscc Event Rcport (LER)File (NUREG4161) |
| AVERAGEDAILYUNITPOWERLEVELDOCKETNO.:UNIT:DATECOMPLETED BY:TELEPHONE:
| | Exhibit 1-Same Source |
| 50-335St.Lucieg19/9/93C.WHITE(407)468-4248MONTHAUGUST1993DAY8/01/938/02/938/03/938/04/938/05/938/06/938/07/938/08/938/09/938/10/938/11/938/12/938/13/938/14/938/15/938/16/938/17/938/18/938/19/938/20/938/21/938/22/938/23/938/24/938/25/938/26/938/27/938/28/938/29/938/30/938/31/93AVERAGEDAILYPOWERLEVEL(MWe-Net) 848847848852851853855856852849844843842846851847844843848844841840841838839785827841840637478 OPERATING DATAREPORTOPERATING STATUSDOCKETNO50-335DATE9/9/93COMPLETED BYC.D.WHITETELEPHONE 407/468/4248 1.UNITNAME:ST.LUCXEUNIT12.REPORTING PERIOD:AUGUST19933.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRICAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8727.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.XFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER'THROUGH7)SINCELASTREPORT,GIVEREASONS:9.POWERLEVELTOWHICHRESTRICTED, IFANY(NETMWE)10.REASONSFORRESTRICTIONS, IFANY:MONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRXTICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ON-LINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVICEFACTOR20.UNITAVAILABXLXTY FACTOR21'APACITYFACTOR(USINGMDCNET)22'APACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE24.SHUTDOWNS SCHEDULED OVERNEXT6MONTHS744744.00.0744.00.01964337647140613680100.0100.098.399.40.058314024.30.03891.20.0102621043400210320836066.766.765.666.30.0146351.0112694.9205.3111566.739.3288597814 952601109003423076.276.375.775.03.925.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATED DATEOFSTARTUP: | | |
| UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:50-335UNITNAME:STLUCIEUNITIDATE:9/9/93COMPLETED BY:C.D.WHITETELEPHONE:
| | ==SUMMARY== |
| (407)468-4248REPORTMONTHAGT1No.DateTypeDuration(Hours)ReasonMethodofShuttingDownReactorLicenseeEventReportSystemCode'omponent CodesCause&Corrective ActiontoPreventRecurrence 9308300.0BN/AHFPUMPXXUnit1decreased powerduetoacirculating waterpumplowlubewaterflowalarm.Unit1wasreturnedto1009opoweronSeptember 1,1993.FForcedSScheduled ReasonA-Equipment failure(explain) | | OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE: |
| B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTrainingdtLicenseExamination F-Administrative G-Operational Error(Explain) | | 50-335 St.Lucie g1 9/9/93 C.WHITE (407)468-4248 REPORT MONTH AUGUST 1993 Unit 1 decreased power on August 30, 1993 due to a circulating water pump low lube water flow alarm.The unit was returned to 1004 power on September 1, 1993.Excluding this period, Unit 1 operated at or above 804 for the month of August.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period. |
| H-Other(Explain) | | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY TELEPHONE: |
| Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
| | 50-389 St.Lucie g2 9/9/93 C.WHITE (407)468-4248 MONTH AUGUST i 1 9 9 3 DAY 8/01/93 8/02/93 8/03/93 8/04/93 8/05/93 8/06/93 8/07/93 8/08/93 8/09/93 8/10/93 8/11/93 8/12/93 8/13/93 8/14/93 8/15/93 8/16/93 8/17/93 8/18/93 8/19/93 8/20/93 8/21/93 8/22/93 8/23/93 8/24/93 8/25/93 8/26/93 8/27/93 8/28/93 8/29/93 8/30/93 8/31/93 AVERAGE DAILY POWER LEVEL (MWe-Net)831 828 827 829 828 828 828 785 130-32 551 837 837 838 841 833 828 825 828 821 803 781 766 747 701 450 542 800 825 822 805 OPERATING DATA REPORT OPERATXNG STATUS DOCKET NO 50-389 DATE 9/9/93 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: AUGUST 1993 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS Cycle 8 Refueling Outage scheduled to begin 744 744.0 0.0 700.7 0.0 1799184 580000 546262 94.2 94.2 87.5 88.5 5.8 5831 3842.8 0.0 3785.8 0.0 9747497 3181800 2987357 64.9 64.9 61.1 61.7 35.1 February 15, 1994.88248.0 74247.1 0.0 72991.2 0.0 191112499 63661450 60179099 82.7 82.7 82.4 82.7 7.6 1 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: |
| ExhibitG-Instructions forPreparation ofDataEntrySheetsLicensccEventRcport(LER)File(NUREG4161)
| | UNIT SHUTDOWNS AI'K)POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: 9/9/93 COMPLETED BY: C.D.WHH'E TELEPHONE: |
| Exhibit1-SameSource SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
| | (407)468-4248 REPORT MONTH AUGUST 1 3 No.Date Type'uration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 12 14 15 930809 930810 930825 930827 0.0 43.3 0.0 0.0 B B B B N/A N/A N/A N/A CB XXXXXX CB XXXXXX CB XXXXXX HB VALVEX Unit 2 reduced power due to backpressure during waterbox cleaning.Unit 2 was taken off-line due to a condenser tube leak, detected during waterbox cleaning.Unit 2 reduced power for waterbox cleaning.Unit 2 reduced power to repair 0'1 governor valve.F Forced S Schcdulcd Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&, License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts Liccnscc Event Rcport (LER)File (NUREG4161) |
| 50-335St.Lucieg19/9/93C.WHITE(407)468-4248REPORTMONTHAUGUST1993Unit1decreased poweronAugust30,1993duetoacirculating waterpumplowlubewaterflowalarm.Theunitwasreturnedto1004poweronSeptember 1,1993.Excluding thisperiod,Unit1operatedatorabove804forthemonthofAugust.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod. | | Exhibit 1-Same Source |
| AVERAGEDAILYUNITPOWERLEVELDOCKETNO.:UNIT:DATE:COMPLETED BYTELEPHONE:
| | |
| 50-389St.Lucieg29/9/93C.WHITE(407)468-4248MONTHAUGUSTi1993DAY8/01/938/02/938/03/938/04/938/05/938/06/938/07/938/08/938/09/938/10/938/11/938/12/938/13/938/14/938/15/938/16/938/17/938/18/938/19/938/20/938/21/938/22/938/23/938/24/938/25/938/26/938/27/938/28/938/29/938/30/938/31/93AVERAGEDAILYPOWERLEVEL(MWe-Net) 831828827829828828828785130-32551837837838841833828825828821803781766747701450542800825822805 OPERATING DATAREPORTOPERATXNG STATUSDOCKETNO50-389DATE9/9/93COMPLETED BYC.D.WHITETELEPHONE 407/468/4248 1.UNITNAME:ST.LUCIEUNIT22.REPORTING PERIOD:AUGUST19933.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRICAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8827.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.IFCHANGESOCCURXNCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORT~GIVEREASONS9.POWERLEVELTOWHICHRESTRICTED, IFANY(NETMWE)10.REASONSFORRESTRICTIONS, IFANY:MONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ON-LINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVICEFACTOR20.UNITAVAILABILITY FACTOR21.CAPACITYFACTOR(USINGMDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE24'HUTDOWNS SCHEDULED OVERNEXT6MONTHSCycle8Refueling Outagescheduled tobegin744744.00.0700.70.0179918458000054626294.294.287.588.55.858313842.80.03785.80.097474973181800298735764.964.961.161.735.1February15,1994.88248.074247.10.072991.20.0191112499 636614506017909982.782.782.482.77.6125.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATED DATEOFSTARTUP: | | ==SUMMARY== |
| UNITSHUTDOWNS AI'K)POWERREDUCTIONS DOCKETNO.:50-389UNITNAME:STLUCIEUNIT2DATE:9/9/93COMPLETED BY:C.D.WHH'ETELEPHONE:
| | OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE: |
| (407)468-4248REPORTMONTHAUGUST13No.DateType'uration (Hours)ReasonMethodofShuttingDownReactorLicenseeEventReportSystemCode'omponent CodesCause&Corrective ActiontoPreventRecurrence 1214159308099308109308259308270.043.30.00.0BBBBN/AN/AN/AN/ACBXXXXXXCBXXXXXXCBXXXXXXHBVALVEXUnit2reducedpowerduetobackpressure duringwaterboxcleaning. | | 50-389 St.Lucie g2 9/9/93 C.WHITE (407)468-4248 REPORT MONTH AUGUST 1993 Unit 2 decreased power on August 9, 1993 for waterbox cleaning.On August 10, 1993 the unit was taken off-line due to a condenser tube leak, detected during waterbox cleaning.The unit was returned to full power on August 12, 1993.From August 25 to August 27, 1993, the unit decreased power for waterbox cleaning and to repair the g1 governor valve.Excluding these periods, Unit 2 operated at or above 80%for the month of August, 1993.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period. |
| Unit2wastakenoff-lineduetoacondenser tubeleak,detectedduringwaterboxcleaning.
| | '4 N I~}} |
| Unit2reducedpowerforwaterboxcleaning.
| |
| Unit2reducedpowertorepair0'1governorvalve.FForcedSSchcdulcd ReasonA-Equipment failure(explain)
| |
| B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTraining&,LicenseExamination F-Administrative G-Operational Error(Explain) | |
| H-Other(Explain) | |
| Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
| |
| ExhibitG-Instructions forPreparation ofDataEntryShcctsLiccnsccEventRcport(LER)File(NUREG4161)
| |
| Exhibit1-SameSource SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATECOMPLETED BY:TELEPHONE:
| |
| 50-389St.Lucieg29/9/93C.WHITE(407)468-4248REPORTMONTHAUGUST1993Unit2decreased poweronAugust9,1993forwaterboxcleaning. | |
| OnAugust10,1993theunitwastakenoff-lineduetoacondenser tubeleak,detectedduringwaterboxcleaning.
| |
| TheunitwasreturnedtofullpoweronAugust12,1993.FromAugust25toAugust27,1993,theunitdecreased powerforwaterboxcleaningandtorepairtheg1governorvalve.Excluding theseperiods,Unit2operatedatorabove80%forthemonthofAugust,1993.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.
| |
| '4NI~}} | |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
':.ACCELERATE DOCUMENT'T DIS'I'RIB'I'ION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)CCESSION NBR:9309170236 DOC.DATE: 'PO&jKSX NOTARIZED:
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power a Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION WHITEiC.Florida Power 6 Light Co.SAGER,D.A.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000335 05000389
SUBJECT:
Monthl o crating repts for Aug 1993 for St Lucie,units 1&2.W/30913 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: S RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL: EGSG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA R DORS OEAB RE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACI'IIE DOCUMENT CON'I'ROL DI'SV, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRII3U'I'ION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 I
P.O.Box 1, Ft.Pierce, FL 34954-0128 September 13, 1993 L-93-231 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos~50-335 and 50-389 Attached are the August, 1993, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us.Very truly yours, D.A.Vice St.Lu ger sident e Plant DAS/CDW/kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL¹986-93 9309170236 S'30831 PDR ADOCK 05000335 j c'UUDO an FPL Group company t II J I~~enaW>'
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:
50-335 St.Lucie g1 9/9/93 C.WHITE (407)468-4248 MONTH AUGUST 1993 DAY 8/01/93 8/02/93 8/03/93 8/04/93 8/05/93 8/06/93 8/07/93 8/08/93 8/09/93 8/10/93 8/11/93 8/12/93 8/13/93 8/14/93 8/15/93 8/16/93 8/17/93 8/18/93 8/19/93 8/20/93 8/21/93 8/22/93 8/23/93 8/24/93 8/25/93 8/26/93 8/27/93 8/28/93 8/29/93 8/30/93 8/31/93 AVERAGE DAILY POWER LEVEL (MWe-Net)848 847 848 852 851 853 855 856 852 849 844 843 842 846 851 847 844 843 848 844 841 840 841 838 839 785 827 841 840 637 478 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 9/9/93 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCXE UNIT 1 2.REPORTING PERIOD: AUGUST 1993 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER'THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRXTICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABXLXTY FACTOR 21'APACITY FACTOR (USING MDC NET)22'APACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744.0 0.0 744.0 0.0 1964337 647140 613680 100.0 100.0 98.3 99.4 0.0 5831 4024.3 0.0 3891.2 0.0 10262104 3400210 3208360 66.7 66.7 65.6 66.3 0.0 146351.0 112694.9 205.3 111566.7 39.3 288597814 95260110 90034230 76.2 76.3 75.7 75.0 3.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 9/9/93 COMPLETED BY: C.D.WHITE TELEPHONE:
(407)468-4248 REPORT MONTH A G T 1 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 930830 0.0 B N/A HF PUMPXX Unit 1 decreased power due to a circulating water pump low lube water flow alarm.Unit 1 was returned to 1009o power on September 1, 1993.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training dt License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licenscc Event Rcport (LER)File (NUREG4161)
Exhibit 1-Same Source
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
50-335 St.Lucie g1 9/9/93 C.WHITE (407)468-4248 REPORT MONTH AUGUST 1993 Unit 1 decreased power on August 30, 1993 due to a circulating water pump low lube water flow alarm.The unit was returned to 1004 power on September 1, 1993.Excluding this period, Unit 1 operated at or above 804 for the month of August.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY TELEPHONE:
50-389 St.Lucie g2 9/9/93 C.WHITE (407)468-4248 MONTH AUGUST i 1 9 9 3 DAY 8/01/93 8/02/93 8/03/93 8/04/93 8/05/93 8/06/93 8/07/93 8/08/93 8/09/93 8/10/93 8/11/93 8/12/93 8/13/93 8/14/93 8/15/93 8/16/93 8/17/93 8/18/93 8/19/93 8/20/93 8/21/93 8/22/93 8/23/93 8/24/93 8/25/93 8/26/93 8/27/93 8/28/93 8/29/93 8/30/93 8/31/93 AVERAGE DAILY POWER LEVEL (MWe-Net)831 828 827 829 828 828 828 785 130-32 551 837 837 838 841 833 828 825 828 821 803 781 766 747 701 450 542 800 825 822 805 OPERATING DATA REPORT OPERATXNG STATUS DOCKET NO 50-389 DATE 9/9/93 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: AUGUST 1993 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS Cycle 8 Refueling Outage scheduled to begin 744 744.0 0.0 700.7 0.0 1799184 580000 546262 94.2 94.2 87.5 88.5 5.8 5831 3842.8 0.0 3785.8 0.0 9747497 3181800 2987357 64.9 64.9 61.1 61.7 35.1 February 15, 1994.88248.0 74247.1 0.0 72991.2 0.0 191112499 63661450 60179099 82.7 82.7 82.4 82.7 7.6 1 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AI'K)POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: 9/9/93 COMPLETED BY: C.D.WHH'E TELEPHONE:
(407)468-4248 REPORT MONTH AUGUST 1 3 No.Date Type'uration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 12 14 15 930809 930810 930825 930827 0.0 43.3 0.0 0.0 B B B B N/A N/A N/A N/A CB XXXXXX CB XXXXXX CB XXXXXX HB VALVEX Unit 2 reduced power due to backpressure during waterbox cleaning.Unit 2 was taken off-line due to a condenser tube leak, detected during waterbox cleaning.Unit 2 reduced power for waterbox cleaning.Unit 2 reduced power to repair 0'1 governor valve.F Forced S Schcdulcd Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&, License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts Liccnscc Event Rcport (LER)File (NUREG4161)
Exhibit 1-Same Source
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:
50-389 St.Lucie g2 9/9/93 C.WHITE (407)468-4248 REPORT MONTH AUGUST 1993 Unit 2 decreased power on August 9, 1993 for waterbox cleaning.On August 10, 1993 the unit was taken off-line due to a condenser tube leak, detected during waterbox cleaning.The unit was returned to full power on August 12, 1993.From August 25 to August 27, 1993, the unit decreased power for waterbox cleaning and to repair the g1 governor valve.Excluding these periods, Unit 2 operated at or above 80%for the month of August, 1993.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
'4 N I~