ML17240A409: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 30: Line 30:
   
   
Dear Mr. Chisum:  
Dear Mr. Chisum:  
  On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance Inspection at the Waterford Steam Electric Station,
  On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance Inspection at the Waterford Steam Electric Station, Unit 3.  A six-person team will perform this  
Unit 3.  A six-person team will perform this  
inspection using NRC Inspection Procedure 71111, Attachment 21M, "Design Bases Assurance Inspection (Teams)."  
inspection using NRC Inspection Procedure 71111, Attachment 21M, "Design Bases Assurance Inspection (Teams)."  


  The inspection focuses on the maintenance of component design bases and modifications made to structures, systems, and components.  The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office  
  The inspection focuses on the maintenance of component design bases and modifications made to structures, systems, and components.  The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office  
preparation week.  In addition, a number of operating experience issues will also be selected for  
preparation week.  In addition, a number of operating experience issues will also be selected for  
review.
review.   The inspection will include an information gathering site visit by the team leader, and two weeks of onsite inspection by the team.  The inspection will consist of three
The inspection will include an information gathering site visit by the team leader, and two weeks of onsite inspection by the team.  The inspection will consist of three
  NRC inspectors, two contractors, and one operations examiner.  The current inspection schedule is as follows:  
  NRC inspectors, two contractors, and one operations examiner.  The current inspection schedule is as follows:  


Line 80: Line 78:
public inspection in the NRC Pub
public inspection in the NRC Pub
lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).   
lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).   
M. Chisum 3 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
M. Chisum 3 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
(the Public Electronic Reading Room).  
  Sincerely,    /RA/    Thomas R. Farnholtz, Chief Engineering Branch 1  
  Sincerely,  
   /RA/    Thomas R. Farnholtz, Chief Engineering Branch 1  
Division of Reactor Safety  
Division of Reactor Safety  
   
   
Line 139: Line 135:


  9. Site top 10 issues list, if available.  
  9. Site top 10 issues list, if available.  
  10. Any pre-existing list of components and associated calculations with low design margins.  
  10. Any pre-existing list of components and associated calculations with low design margins.  11. A list of operating experience evaluations for the last 3 years.   
  11. A list of operating experience evaluations for the last 3 years.   
  12. A list of all time-critical operator actions in procedures.  
  12. A list of all time-critical operator actions in procedures.  
  13. A list of current "operator work arounds/burdens."  
  13. A list of current "operator work arounds/burdens."  
Line 166: Line 161:


  4. Calculations and drawings associated with selected components.  
  4. Calculations and drawings associated with selected components.  
  5. Modification documentation associated with modifications selected from Item I.15,  
  5. Modification documentation associated with modifications selected from Item I.15, this includes:   
this includes:   


  a. Post-modification testing, including performance characteristics affected, assumptions, and acceptance criteria associated with modifications  
  a. Post-modification testing, including performance characteristics affected, assumptions, and acceptance criteria associated with modifications  

Revision as of 15:22, 7 July 2018

Waterford Steam Electric Station, Unit 3 - Notification of NRC Design Bases Assurance Inspection (Teams) (05000582/2017008) and Initial Request for Information
ML17240A409
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/28/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Chisum M R
Entergy Operations
References
IR 2017008
Download: ML17240A409 (7)


See also: IR 05000582/2017008

Text

August 28, 2017

Mr. Michael R. Chisum, Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC

DESIGN BASES ASSURANCE IN

SPECTION (TEAMS) (05000582/2017008)

AND INITIAL REQUEST FOR INFORMATION

Dear Mr. Chisum:

On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will perform this

inspection using NRC Inspection Procedure 71111, Attachment 21M, "Design Bases Assurance Inspection (Teams)."

The inspection focuses on the maintenance of component design bases and modifications made to structures, systems, and components. The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office

preparation week. In addition, a number of operating experience issues will also be selected for

review. The inspection will include an information gathering site visit by the team leader, and two weeks of onsite inspection by the team. The inspection will consist of three

NRC inspectors, two contractors, and one operations examiner. The current inspection schedule is as follows:

Onsite Information Gathering Visit: October 11, 2017

Preparation Week: October 16-20, 2017

Onsite Weeks: October 23-27, 2017, and November 13-17, 2017

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request a tour of the plant with members of your operations staff and probabilistic safety assessment staff. During the onsite weeks, several days and administration will be needed on the plant-

referenced simulator in order to facilitate the development of operator action-based scenarios. Additional information and documentation needed to support the inspection will be identified

during the inspection, including interviews with engineering managers, engineers, and probabilistic safety assessment staff.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511

M. Chisum 2 Our experience with these inspections has shown that they are extremely resource intensive, both for the NRC inspectors and the licensee staff.

In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed for the inspection. The request has been divided into two groups. The first group lists information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than October 4, 2017, unless

otherwise stated. If possible, this information should be provided electronically to the lead

inspector. Since the inspection will be concentrated on high risk/low margin components and

modifications, calculations associated with

your list of high risk components and modifications should be available to review during the information gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. An additional request will be made by the team during the preparation week once

the specific components and modifications have been selected. Additional requests by

inspectors will also be made throughout the onsite weeks for specific documents needed to complete the review. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection. In order to facilitate the inspection, we request that a contact

individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Gerond George. We understand that our licensing engineer contact for this inspection is Ms. M. Zamber.

If there are any questions about the inspection or the requested materials, please contact the lead inspector by telephone at

817-200-1562 or by e-mail at Gerond.George@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for

public inspection in the NRC Pub

lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

M. Chisum 3 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1

Division of Reactor Safety

Docket No. 50-382

License No. NPF-38

Enclosure:

Design Bases Assurance Inspection (Teams)

Request for Information

Electronic Distribution for Waterford Steam Electric Station, Unit 3

ML17240A409 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: GGeorge Yes No Publicly Available Sensitive NRC-002 OFFICE SRI:EB1 C:EB1 NAME GGeorge TFarnholtz SIGNATURE /RA/ /RA/ DATE 8/24/17 8/28/17

Enclosure

Initial Request for Information

Design Bases Assurance Inspection (Teams) Waterford Steam Electric Station, Unit 3

Inspection Report: 05000382/2017008

Information Gathering Dates: October 11, 2017

Inspection Dates: October 23-27, 2017, and November 13-17, 2017

Inspection Procedure: IP 71111, Attachment 21M, "Design Bases Assurance Inspection (Teams)"

Lead Inspector: Gerond George, Senior Reactor Inspector

I. Information requested prior to information gathering visit (by October 4, 2017).

The following information (Section I of this enclosure) should be sent to the Region IV office in hard copy or electronic format (Certrec IMS preferred), to the attention of

Gerond George

by October 4, 2017, to facilitate the reduction in the items to be selected

for a final list during the information gathering visit. The specific items selected from the

lists shall be available and ready for review on the day indicated in this request. Please provide requested documentation electronically in pdf files, Excel, or other searchable formats, if possible. The information should contain descriptive names and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough

information to be easily understood by someone who has knowledge of pressurized

water reactor technology. If requested documents are large and only hard copy formats

are available, please inform the inspector and provide subject documentation during the first day of the onsite inspection.

1. An Excel spreadsheet of equipment basic events (with definitions), including

importance measures sorted by risk ac

hievement worth and Fussell-Vesely from your internal events probabilistic risk assessment. Include basic events with risk achievement worth value of 1.3 or greater.

2. A list of the top 50 cut-sets from your PRA.

3. Copies of probabilistic risk assessment "system notebooks" and the latest probabilistic risk assessment summary document.

4. An Excel spreadsheet of probabilistic risk assessment human ac

tion basic events or risk ranking of operator actions from your site-specific PSA sorted by risk

achievement worth and Fussell-Vesely. Provide copies of your human reliability worksheets for these items.

5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire.

2 6. A list of high large early release frequency impact events and associated

components.

7. Structures, systems, and components in the Maintenance Rule (a)(1) category.

8. A list of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment.

9. Site top 10 issues list, if available.

10. Any pre-existing list of components and associated calculations with low design margins. 11. A list of operating experience evaluations for the last 3 years.

12. A list of all time-critical operator actions in procedures.

13. A list of current "operator work arounds/burdens."

14. Procedures used to accomplish operator actions associated with the basic events credited in your PRA.

15. Lists of permanent and temporary modifications performed in the past 5 years to structures, systems, and components sorted by component identified in Item 1.

16. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years.

17. A list of any common-cause failures of components in the last 3 years.

18. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for this inspection.

19. A copy of engineering/operations-related audits completed in the last 2 years.

20. Electronic copies of the Technical Specifications, Technical Specifications Bases, and the Final Safety Analysis Report, as updated.

21. A copy of the Individual Plant Exami

nation of External Events, if available electronically.

22. One-line drawings of emergency core cooling system, ultimate heat sink, emergency feedwater, safety-related electrical systems.

23. A list of licensee contacts for the inspection team with phone numbers.

24. A copy of the current management and engineering organizational charts.

3 II. Information requested to be provided for preparation week and throughout the

inspection (by October 16, 2017, if possible)

1. Electronic copies of the design bases documents for selected components and modifications.

2. Electronic copies of the system health notebooks for selected components and modifications.

3. A list of the design calculations that provide the design margin information for selected components. (Calculations for selected components should be available

during the information gathering visit.)

4. Calculations and drawings associated with selected components.

5. Modification documentation associated with modifications selected from Item I.15, this includes:

a. Post-modification testing, including performance characteristics affected, assumptions, and acceptance criteria associated with modifications

selected.

b. Updated maintenance and surveillance procedures associated with modifications.

c. Updated operation procedures and training plans associated with the modifications.

6. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.

7. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to

each team member).

Inspector Contact Information:

Gerond A. George

Senior Reactor Inspector

817-200-1562

Gerond.George@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond George

1600 East Lamar Blvd. Arlington, TX 76011-4511