ML17326A007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ATEGORY1REGULATRYINFORMATION DISTRIBUTION%
{{#Wiki_filter:ATEGORY 1 REGULAT RY INFORMATION DISTRIBUTION%
SYSTEM(RIDS)DOCKETFACIL:50-316 DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316AUTO.NAME AUTHORAFFILIATION MINOR,J.W.
SYSTEM (RIDS)DOCKET FACIL:50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTO.NAME AUTHOR AFFILIATION MINOR,J.W.
IndianaMichiganPowerCo.HEURICH,R.G.
Indiana Michigan Power Co.HEURICH,R.G.
IndianaMichiganPowerCo.BAKKEN,A.C.
Indiana Michigan Power Co.BAKKEN,A.C.
IndianaMichiganPowerCo.RECIP.NAME RECIPIENT AFFILIATION
Indiana Michigan Power Co.RECIP.NAME RECIPIENT AFFILIATION SUB JECT: Monthly operat'a 1999 for DC Cook Nuclear Plant, Unit.With 990609 ltr.DXSTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECXPIENT ID CODE/NAME LPD3-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG J E CENTER 0 RGN3 1 1 NOAC 1 1 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 0 D U M NOTE TO ALL"RZDS" RECIPIENTS:
 
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 Mgnan,M4%06 616 465 5901 N INQISlMA NICNICQN PQWM U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 June 9, 1999 Gentlemen:
==SUBJECT:==
Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached monthly operating report for May 1999 is submitted.
Monthlyoperat'a1999forDCCookNuclearPlant,Unit.With990609ltr.DXSTRIBUTXON CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:ERECXPIENT IDCODE/NAME LPD3-1PDINTERNAL:
Sincerely, A.C.Bakken, III Site Vice President AB/drm Attachment ANI Nuclear Engineering Department INPO Records Center NRC Project Manager-NRR NRC Region III NRC Resident Inspector P.A.Barrett G.T.Gaffney-Canton D.R.Hahn-Department of Health S.Hamming-Department of Labor G.John D.F.Kunsemiller B.Lewis-McGraw-Hill Companies D.H.Malin T.P.Noonan D.W.Paul-Lancaster R.P.Powers Regulatory Licensing Manager M.W.Rencheck W.H.Schalk D.G.Turner eS 0SSS0m9 9~053'DR ADGCK,050003i6 R"''PDR AEP:<<'tmerica's Eaergri'armer" N.R.C.OPERATING DATA REPORT DOCKET NO.50-316~DATE 6/8/99 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 2 2.Reporting Period 3.Licensed Thermal Power (MWt)4.Name Plate Rating (Gross MWe)5.Design Electrical Rating (Net MWe)6.Maximum Dependable Capacity (GROSS MWe)7.Maximum Dependable Capacity (Net MWe)May-99 3411 1133 1090 1100 1060 Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.
AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:
If Any (Net MWe)10.Reasons For Restrictions.
LMITCOMARSHALLNRCPDRCOPIESLTTRENCL111111RECIPIENT IDCODE/NAME STANGJECENTER0RGN311NOAC11COPIESLTTRENCL111111110DUMNOTETOALL"RZDS"RECIPIENTS:
11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Si Yr.to Date 3624.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0'.0 0.0 0.0 0.0 100.0 This Mo.744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 x Months (Type, Date,and Duration):
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
Cumm.187704.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 63.7 63.7 58.0 56.5 21.4 25.If Shut Down At End of Report Period, Est'ed Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
LTTR9ENCL9 Mgnan,M4%06 6164655901NINQISlMANICNICQNPQWMU.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555June9,1999Gentlemen:
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved I f''j,<~~)l~l~~a Ct-/'''I 8 Tj II AVERAGE DAILY POWER LEVEL (MWe-Net)DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 07-Jun-99 JW Minor 616-465-5901 MONTH May-99 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 5/1/99 5/2/99 5/3/99 5/4/99 5/5/99 5/6/99 5/7/99 5/8/99 5/9/99 5/10/99 5/11/99 5/12/99 5/13/99 5/14/99 5/15/99 5/16/99 5/17/99 5/18/99 5/19/99 5/20/99 5/21/99 5/22/99 5/23/99 5/24/99 5/25/99 5/26/99 5/27/99 5/28/99'/29/99 5/30/99 5/31/99 I f I'.I 4V~yt'4 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2 June 7, 1999 RG Heurich 616-697-5049 1 of1 MONTHLY OPERATING ACTIVITIES
Pursuanttotherequirements ofDonaldC.CookNuclearPlantUnit2Technical Specification 6.9.1.8,theattachedmonthlyoperating reportforMay1999issubmitted.
-May 1999 The unit entered this reporting period in Mode 5 at 0%RTP.The unit exited this reporting period in Mode 5 at 0%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of May was 0 MWh.DEXBKG.05/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
Sincerely, A.C.Bakken,IIISiteVicePresident AB/drmAttachment ANINuclearEngineering Department INPORecordsCenterNRCProjectManager-NRRNRCRegionIIINRCResidentInspector P.A.BarrettG.T.Gaffney-CantonD.R.Hahn-Department ofHealthS.Hamming-Department ofLaborG.JohnD.F.Kunsemiller B.Lewis-McGraw-Hill Companies D.H.MalinT.P.NoonanD.W.Paul-Lancaster R.P.PowersRegulatory Licensing ManagerM.W.RencheckW.H.SchalkD.G.TurnereS0SSS0m99~053'DRADGCK,050003i6 R"''PDRAEP:<<'tmerica's Eaergri'armer" N.R.C.OPERATING DATAREPORTDOCKETNO.50-316~DATE6/8/99COMPLETED BYJWMinorTELEPHONE 616465-5901 OPERATING STATUS1.UnitNameD.C.CookUnit22.Reporting Period3.LicensedThermalPower(MWt)4.NamePlateRating(GrossMWe)5.DesignElectrical Rating(NetMWe)6.MaximumDependable Capacity(GROSSMWe)7.MaximumDependable Capacity(NetMWe)May-9934111133109011001060Notes:8.IfChangesOccurinCapacityRatings(Itemsno.3through7)SinceLastReportGiveReasons9.PowerLevelToWhichRestricted.
'll time entries are Eastern Standard Time (EST).
IfAny(NetMWe)10.ReasonsForRestrictions.
DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2 June 7, 1999 RG Heurich 616-697-5049 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS
11.HoursinReporting Period12.No.ofHrs.ReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator onLine15.UnitReserveShutdownHours16.GrossTherm.EnergyGen.(MWH)17.GrossElect.EnergyGen.(MWH)18.NetElect.EnergyGen.(MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(MDCNet)22.UnitCapacityFactor(DERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled overNextSiYr.toDate3624.00.00.00.00.00.00.00.0'.00.00.00.0100.0ThisMo.744.00.00.00.00.00.00.00.00.00.00.00.0100.0xMonths(Type,Date,andDuration):
-May 1999 METHOD OF SHUTI'ING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT O DATE TYPE'OURS REASONS REACTORs REPORT NO CODE'ODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F 744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
Cumm.187704.0121771.00.0118153.40.0366007650.4 118584640.0 114257779.0 63.763.758.056.521.425.IfShutDownAtEndofReportPeriod,Est'edDateofStartup:26.UnitsinTestStatus(PriortoCommercial Operation):
13ZEE: F: Forced S: Scheduled 2JK&SQH: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3bKlt!QD-':
ForecastINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved If''j,<~~)l~l~~aCt-/'''I8TjII AVERAGEDAILYPOWERLEVEL(MWe-Net)
Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)M4XSIEh1: Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)IEIMEOHE Exhibit I: Same Source}}
DOCKETNO.UNITDATECOMPLETED BYTELEPHONE 50-316TWO07-Jun-99 JWMinor616-465-5901 MONTHMay-99DAYAVERAGEDAILYPOWERLEVELDAYAVERAGEDAILYPOWERLEVEL5/1/995/2/995/3/995/4/995/5/995/6/995/7/995/8/995/9/995/10/995/11/995/12/995/13/995/14/995/15/995/16/995/17/995/18/995/19/995/20/995/21/995/22/995/23/995/24/995/25/995/26/995/27/995/28/99'/29/995/30/995/31/99 IfI'.I4V~yt'4 DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-316D.C.CookUnit2June7,1999RGHeurich616-697-5049 1of1MONTHLYOPERATING ACTIVITIES
-May1999Theunitenteredthisreporting periodinMode5at0%RTP.Theunitexitedthisreporting periodinMode5at0%RTP.Therewerenochallenges tothepressurizer safetyvalvesorpoweroperatedreliefvalves.Grosselectrical generation forthemonthofMaywas0MWh.DEXBKG.05/01/99Unitremainedshutdowntheentirereporting periodtoresolvedesignbasisquestions discovered duringtheNRCArchitect andEngineering (AE)Inspection.
'lltimeentriesareEasternStandardTime(EST).
DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-316D.C.CookUnit2June7,1999RGHeurich616-697-5049 1of1UNITSHUTDOWNS ANDPOWERREDUCTIONS
-May1999METHODOFSHUTI'ING LICENSEEDURATIONDOWNEVENTSYSTEMCOMPONENT ODATETYPE'OURS REASONSREACTORsREPORTNOCODE'ODEs CAUSEANDCORRECTIVE ACTIONTOPREVENTRECURRENCE 335010798F744.0N/AN/AN/ATheunitremainedshutdowntoresolvedesignbasisquestions discovered duringtheNRCArchitect andEngineering (AE)Inspection.
13ZEE:F:ForcedS:Scheduled 2JK&SQH:A:Equipment Failure(Explain)
B:Maintenance orTestC:Refueling D:Regulatory Restriction E:OperatorTrainingandLicenseExamination F:Administrative G:Operational Error(Explain)
H:Other(Explain) 3bKlt!QD-':
Manual2:ManualScram3:Automatic Scram4:Other(Explain)
M4XSIEh1:
ExhibitG-Instructions forpreparation ofdataentrysheetsforLicenseeEventReport(LER)File(NUREG0161)IEIMEOHEExhibitI:SameSource}}

Revision as of 08:20, 6 July 2018

Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr
ML17326A007
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/31/1999
From: BAKKEN A C, HEURICH R G, MINOR J W
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9906160279
Download: ML17326A007 (8)


Text

ATEGORY 1 REGULAT RY INFORMATION DISTRIBUTION%

SYSTEM (RIDS)DOCKET FACIL:50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTO.NAME AUTHOR AFFILIATION MINOR,J.W.

Indiana Michigan Power Co.HEURICH,R.G.

Indiana Michigan Power Co.BAKKEN,A.C.

Indiana Michigan Power Co.RECIP.NAME RECIPIENT AFFILIATION SUB JECT: Monthly operat'a 1999 for DC Cook Nuclear Plant, Unit.With 990609 ltr.DXSTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECXPIENT ID CODE/NAME LPD3-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG J E CENTER 0 RGN3 1 1 NOAC 1 1 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 0 D U M NOTE TO ALL"RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 Mgnan,M4%06 616 465 5901 N INQISlMA NICNICQN PQWM U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 June 9, 1999 Gentlemen:

Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached monthly operating report for May 1999 is submitted.

Sincerely, A.C.Bakken, III Site Vice President AB/drm Attachment ANI Nuclear Engineering Department INPO Records Center NRC Project Manager-NRR NRC Region III NRC Resident Inspector P.A.Barrett G.T.Gaffney-Canton D.R.Hahn-Department of Health S.Hamming-Department of Labor G.John D.F.Kunsemiller B.Lewis-McGraw-Hill Companies D.H.Malin T.P.Noonan D.W.Paul-Lancaster R.P.Powers Regulatory Licensing Manager M.W.Rencheck W.H.Schalk D.G.Turner eS 0SSS0m9 9~053'DR ADGCK,050003i6 R"PDR AEP:<<'tmerica's Eaergri'armer" N.R.C.OPERATING DATA REPORT DOCKET NO.50-316~DATE 6/8/99 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 2 2.Reporting Period 3.Licensed Thermal Power (MWt)4.Name Plate Rating (Gross MWe)5.Design Electrical Rating (Net MWe)6.Maximum Dependable Capacity (GROSS MWe)7.Maximum Dependable Capacity (Net MWe)May-99 3411 1133 1090 1100 1060 Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.

If Any (Net MWe)10.Reasons For Restrictions.

11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Si Yr.to Date 3624.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0'.0 0.0 0.0 0.0 100.0 This Mo.744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 x Months (Type, Date,and Duration):

Cumm.187704.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 63.7 63.7 58.0 56.5 21.4 25.If Shut Down At End of Report Period, Est'ed Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved I fj,<~~)l~l~~a Ct-/'I 8 Tj II AVERAGE DAILY POWER LEVEL (MWe-Net)DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 07-Jun-99 JW Minor 616-465-5901 MONTH May-99 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 5/1/99 5/2/99 5/3/99 5/4/99 5/5/99 5/6/99 5/7/99 5/8/99 5/9/99 5/10/99 5/11/99 5/12/99 5/13/99 5/14/99 5/15/99 5/16/99 5/17/99 5/18/99 5/19/99 5/20/99 5/21/99 5/22/99 5/23/99 5/24/99 5/25/99 5/26/99 5/27/99 5/28/99'/29/99 5/30/99 5/31/99 I f I'.I 4V~yt'4 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2 June 7, 1999 RG Heurich 616-697-5049 1 of1 MONTHLY OPERATING ACTIVITIES

-May 1999 The unit entered this reporting period in Mode 5 at 0%RTP.The unit exited this reporting period in Mode 5 at 0%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of May was 0 MWh.DEXBKG.05/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.

'll time entries are Eastern Standard Time (EST).

DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2 June 7, 1999 RG Heurich 616-697-5049 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS

-May 1999 METHOD OF SHUTI'ING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT O DATE TYPE'OURS REASONS REACTORs REPORT NO CODE'ODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F 744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.

13ZEE: F: Forced S: Scheduled 2JK&SQH: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3bKlt!QD-':

Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)M4XSIEh1: Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)IEIMEOHE Exhibit I: Same Source