Inspection Plan cc w/encl: Distribution via ListServ
Inspection Plan cc w/encl: Distribution via ListServ  
 
ML14239A543 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR DSchroeder/DLS DATE 08/26/14 08/26/14 Letter to George Gellrich from Daniel Schroeder dated September 2, 2014
 
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2014006 AND 05000318/2014006)
Distribution w/encl: (via email) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS P. Krohn, DRS D. Schroeder, DRP A. Rosebrook, DRP R. Clagg, DRP, SRI E. Torres, DRP, RI C. Fragman, DRP, AA A. Bowers, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources A. Dimitriadis, DRS J. Noggle, DRS M. Gray, DRS C. Cahill, DRS J. Rogge, DRS D. Jackson, DRS D. Screnci, PAO, N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource
 
Page 1 of 208/27/201414:33:15Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan07/01/2014-12/31/20158/25EXAM-INITIAL OL EXAM41 FY14-CALVERT CLIFFS INITIAL OPERATOR LICENSING EXAMU0188607/28/201408/01/20141 FY14-CALVERT CLIFFS INITIAL OPERATOR LICENSING EXAMU0188608/25/201409/04/201471003-U1 LR COMMITMENTS PHASE 2 INSPEC51 IPPost-Approval Site Inspection for License Renewal7100307/07/201407/11/2014ISFSI-ISFSI LOADING INSPECTION31,2 IPOperation Of An ISFSI6085508/18/201408/22/20141,2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/18/201408/22/2014MODS-PERMANENT PLANT MODIFICATIONS61,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/22/201409/26/20141,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/06/201410/10/2014EP PROGR-EP PROGRAM INSPECTION11,2 IPAlert and Notification System Testing711140211/17/201411/21/20141,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/20141,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/201471124-RADIATION SAFETY RAD INSTRUMENTS11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/01/201412/05/20141,2 IPRadiation Monitoring Instrumentation71124.0512/01/201412/05/20141,2 IP71151-OR0112/01/201412/05/20141,2 IP71151-PR0112/01/201412/05/201471124-RADIATION SAFETY INSPECTION - INSTRUMENT11,2 IPRadiation Monitoring Instrumentation71124.0501/12/201501/16/201571124-RADIATION SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/16/201502/20/20157111108P-U2 INSERVISE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P02/23/201503/06/201571124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/06/201504/10/201571124-RADIATION SAFETY INSPECTION - ALARA11,2 IPOccupational ALARA Planning and Controls71124.0204/27/201505/01/201571124-RADIATION SAFETY INSPECTION - REMP11,2 IPRadiological Environmental Monitoring Program71124.0706/22/201506/26/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 208/27/201414:33:15Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan07/01/2014-12/31/2015EP-EP EXERCISE81,2 IPExercise Evaluation - Hostile Action (HA) Event711140709/14/201509/18/20151,2 IPExercise Evaluation - Scenario Review711140809/14/201509/18/2015PI&R-PI&R - BIENNIAL11,2 IPProblem Identification and Resolution71152B09/14/201509/18/20151,2 IPProblem Identification and Resolution71152B09/28/201510/01/20157111111B-REQUAL INSP W/ P/F RESULTS21,2 IPLicensed Operator Requalification Program7111111B11/16/201511/20/201571124-RADIATION SAFETY INSPECTION - DOSE11,2 IPOccupational Dose Assessment71124.0411/02/201511/06/20151,2 IPPerformance Indicator Verification7115111/02/201511/06/2015CDBI-COMPONENT DESIGN BASIS INSPECTION71,2 IPComponent Design Bases Inspection711112111/02/201511/06/20151,2 IPComponent Design Bases Inspection711112111/16/201511/20/20151,2 IPComponent Design Bases Inspection711112111/30/201512/04/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 22:53, 26 June 2018

Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-14-006 and 05000318-14-006)
ML14239A543
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/02/2014
From: Schroeder D L
Reactor Projects Branch 1
To: Gellrich G H
Exelon Generation Co
Schroeder D L
References
IR-2014-006
Download: ML14239A543 (6)


Text

September 2, 2014

Mr. George Site Vice President Calvert Cliffs Nuclear Power Plant Exelon Generation Company, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2014006 AND 05000318/2014006)

Dear Mr. Gellrich:

On August 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of your Calvert Cliffs Nuclear Power Plant (Calvert Cliffs) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Calvert Cliffs Nuclear Power Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Calvert Cliffs Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of a Preliminary White Finding for Unit 2, "Inaccurate EAL Threshold Values Incorporated Into Site EAL Scheme Change,"(Apparent Violation 05000318/2014003-

02) contained in Inspection Report 05000317/2014003 and 05000318/2014003 issued on August 8, 2014. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. The enclosed inspection plan lists the inspections scheduled through December 31, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants," and IP 71003, "Post-Approval Site Inspection for License Renewal." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The onsite component at your site has been scheduled for the week of September 8, 2014. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5262 with any questions you have regarding this letter.

Sincerely,/RA/ Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ

ML14239A543 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR DSchroeder/DLS DATE 08/26/14 08/26/14 Letter to George Gellrich from Daniel Schroeder dated September 2, 2014

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2014006 AND 05000318/2014006)

Distribution w/encl: (via email) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS P. Krohn, DRS D. Schroeder, DRP A. Rosebrook, DRP R. Clagg, DRP, SRI E. Torres, DRP, RI C. Fragman, DRP, AA A. Bowers, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources A. Dimitriadis, DRS J. Noggle, DRS M. Gray, DRS C. Cahill, DRS J. Rogge, DRS D. Jackson, DRS D. Screnci, PAO, N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource

Page 1 of 208/27/201414:33:15Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan07/01/2014-12/31/20158/25EXAM-INITIAL OL EXAM41 FY14-CALVERT CLIFFS INITIAL OPERATOR LICENSING EXAMU0188607/28/201408/01/20141 FY14-CALVERT CLIFFS INITIAL OPERATOR LICENSING EXAMU0188608/25/201409/04/201471003-U1 LR COMMITMENTS PHASE 2 INSPEC51 IPPost-Approval Site Inspection for License Renewal7100307/07/201407/11/2014ISFSI-ISFSI LOADING INSPECTION31,2 IPOperation Of An ISFSI6085508/18/201408/22/20141,2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/18/201408/22/2014MODS-PERMANENT PLANT MODIFICATIONS61,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/22/201409/26/20141,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/06/201410/10/2014EP PROGR-EP PROGRAM INSPECTION11,2 IPAlert and Notification System Testing711140211/17/201411/21/20141,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/20141,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/201471124-RADIATION SAFETY RAD INSTRUMENTS11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/01/201412/05/20141,2 IPRadiation Monitoring Instrumentation71124.0512/01/201412/05/20141,2 IP71151-OR0112/01/201412/05/20141,2 IP71151-PR0112/01/201412/05/201471124-RADIATION SAFETY INSPECTION - INSTRUMENT11,2 IPRadiation Monitoring Instrumentation71124.0501/12/201501/16/201571124-RADIATION SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/16/201502/20/20157111108P-U2 INSERVISE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P02/23/201503/06/201571124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/06/201504/10/201571124-RADIATION SAFETY INSPECTION - ALARA11,2 IPOccupational ALARA Planning and Controls71124.0204/27/201505/01/201571124-RADIATION SAFETY INSPECTION - REMP11,2 IPRadiological Environmental Monitoring Program71124.0706/22/201506/26/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 208/27/201414:33:15Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan07/01/2014-12/31/2015EP-EP EXERCISE81,2 IPExercise Evaluation - Hostile Action (HA) Event711140709/14/201509/18/20151,2 IPExercise Evaluation - Scenario Review711140809/14/201509/18/2015PI&R-PI&R - BIENNIAL11,2 IPProblem Identification and Resolution71152B09/14/201509/18/20151,2 IPProblem Identification and Resolution71152B09/28/201510/01/20157111111B-REQUAL INSP W/ P/F RESULTS21,2 IPLicensed Operator Requalification Program7111111B11/16/201511/20/201571124-RADIATION SAFETY INSPECTION - DOSE11,2 IPOccupational Dose Assessment71124.0411/02/201511/06/20151,2 IPPerformance Indicator Verification7115111/02/201511/06/2015CDBI-COMPONENT DESIGN BASIS INSPECTION71,2 IPComponent Design Bases Inspection711112111/02/201511/06/20151,2 IPComponent Design Bases Inspection711112111/16/201511/20/20151,2 IPComponent Design Bases Inspection711112111/30/201512/04/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.