UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CALVERT CLIFFS NUCLEAR POWER PLANT
Dear Mr. Spina:
On August 9, 2006, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Calvert Cliffs Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct several infrequent ROP inspections to assess activities related to your operation of an independent spent fuel storage installation and replacement of the reactor vessel head at Unit 2.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Brian J. McDermott, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69
Enclosure:
Calvert Cliffs Inspection / Activity Plan cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)
3 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Brian J. McDermott, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 Distribution w/encl:
S. Collins, RA M. Dapas, DRA B. Sosa, RI OEDO R. Laufer, NRR P. Milano, PM, NRR R. Guzman, PM, NRR (Backup)
B. McDermott, DRP A. Burritt, DRP J. Giessner, DRP, SRI M. Davis, DRP, RI C. Newgent - Resident OA Region I Docket Room (with concurrences)
D. Screnci, PAO N. Sheenhan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDiplipb@nrs.gov Institute of Nuclear Power Operations (INPO)
SUNSI Review Complete: _____ALB_______ (Reviewers Initials)
DOCUMENT NAME:S:\\ROP 7 Mid Cycle Review\\2006 ROP7 Mid-Cycle Letters\\Calvert ROP-7 Mid-Cycle Ltr.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME JGiessner/ALB FOR ABurritt BMcDermott DATE 08/24/06 08/24/06 08/28/06 OFFICIAL RECORD COPY
Calvert Cliffs Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/31/2006 09:32:07 Report 22 4
8/28 EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 07/24/2006 08/04/2006 1
U01585 CALVERT CLIFFS INITIAL EXAM (3/06)
Not Applicable 08/28/2006 09/01/2006 1
U01585 CALVERT CLIFFS INITIAL EXAM (3/06) 3 A-DIESEL
- FOLLOW UP TO MARCH 2006 1A-DIESEL EVENT Baseline Inspections 06/26/2006 08/15/2006 1
71153 IP Followup of Events and Notices of Enforcement Discretion 7
7111121
- CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/31/2006 08/04/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 08/14/2006 08/18/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 08/21/2006 08/25/2006 1, 2 7111121 IP Component Design Bases Inspection 2
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program Baseline Inspections 07/31/2006 08/04/2006 1
71151 IP Performance Indicator Verification 2
71121
- OCC RAD SAFETY Baseline Inspections 09/11/2006 09/15/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/11/2006 09/15/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 09/11/2006 09/15/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 09/11/2006 09/15/2006 2
71151 IP Performance Indicator Verification 1
TI 169
- MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 3
60855.1
- OPERATION OF AN ISFSI Other Routine 11/06/2006 11/08/2006 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
71007
- U2 RX VESSEL HEAD REPLACEMENT Other Routine 01/01/2007 04/10/2007 2
71007 IP Reactor Vessel Head Replacement Inspection 1
71114
- EP PRGM INSP & PI VERFICATION Baseline Inspections 12/03/2006 12/08/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 12/03/2006 12/08/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2006 12/08/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 12/03/2006 12/08/2006 1, 2 71151 IP Performance Indicator Verification 1
71121
- OCC RAD SAFETY Baseline Inspections 01/15/2007 01/19/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/15/2007 01/19/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 01/15/2007 01/19/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/15/2007 01/19/2007 1
71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/31/2006 09:32:07 Report 22 1
71121
- OCC RAD PROT Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/05/2007 03/09/2007 2
71151 IP Performance Indicator Verification 1
7111108P
- IN SERVICE INSPECTION Baseline Inspections 03/05/2007 03/16/2007 2
7111108P IP Inservice Inspection Activities - PWR 1
TI-166
- CONTAINMENT SUMP MODIFICATIONS Safety Issues 03/26/2007 04/04/2007 2
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
3 MODS
- MODS & 50.59 Baseline Inspections 04/16/2007 04/20/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 04/16/2007 04/20/2007 1, 2 7111117B IP Permanent Plant Modifications 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 05/28/2007 06/01/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 05/28/2007 06/01/2007 1
71151 IP Performance Indicator Verification 3
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 06/25/2007 06/29/2007 1, 2 7111105T IP Fire Protection [Triennial]
1 71121
- OCC RAD SAFETY Baseline Inspections 08/06/2007 08/10/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/06/2007 08/10/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 08/06/2007 08/10/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/06/2007 08/10/2007 2
71151 IP Performance Indicator Verification 4
- PI&R Baseline Inspections 08/27/2007 08/31/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 09/10/2007 09/14/2007 1, 2 71152B IP Identification and Resolution of Problems 4
7111111B
- L.O. REQUAL. PROG. + P/F REVIEW Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111111B IP Licensed Operator Requalification Program 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/01/2007 10/05/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/01/2007 10/05/2007 1
71151 IP Performance Indicator Verification 4
7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 10/29/2007 11/02/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/29/2007 11/02/2007 1, 2 71151-EP02 IP ERO Drill Participation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/31/2006 09:32:07 Report 22 4
7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 10/29/2007 11/02/2007 1, 2 71151-EP03 IP Alert & Notification System 1
71121
- OCC RAD SAFETY Baseline Inspections 12/10/2007 12/14/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/10/2007 12/14/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 12/10/2007 12/14/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/10/2007 12/14/2007 2
71151 IP Performance Indicator Verification 1
- HEAT SINK INSP Baseline Inspections 02/04/2008 02/08/2008 1, 2 7111107B IP Heat Sink Performance 1
71121
- OCC RAD SAFETY Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/10/2008 03/14/2008 1
71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.