Peter F. Moodie Plant Manager

Calvert Cliffs Nuclear Power Plant Constellation 1650 Calvert Cliffs Parkway Lu sby, MD 20657

410-495-5205 Office 643-548-7775 Mob ile www.constellat ion.com

peter.mood ie@constellat ion.com

October 6, 2023

U.S. Nuclear Regulatory Commission, Region I ATTN: Document Control Desk Washington, DC 20555-0001

Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

Subject:

Response to NRC Inspection Report and Preliminary White Finding

Reference:

Letter from R. McKinley (U.S. NRC Region I) to D. Rhoades (Constellation Energy Generation, LLC), "Calvert Cliffs Nuclear Power Plant, Unit 1 - Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation,"

dated September 29, 2023

In the referenced letter, the NRC documented a preliminary White finding related to developing and implementing adequate maintenance instructions and practices for the 1A emergency diesel generator which occurred in April 2023. Constellation Energy Generation, LLC (CEG) acknowledges the description surrounding the event discussed in the referenced letter.

The referenced letter requested verbal or written notification within 7 days of the date of the letter regarding CE G 's intention to (1) request a regulatory conference to present to the NRC CE G's perspective on the facts and assumptions used to arrive at the finding and assess its significance,

or (2) submit CEG's position on the finding to the NRC in writing.

On October 5, 2023, Peter Moodie (Plant Manager) verbally notified NRC's Brice Bickett of CE G's decision to not contest the violation or significance of the violation. This letter confirms that CEG is not requesting a regulatory conference on this matter and will not be submitting a written response. It is understood by CEG that by declining to submit a written response or to arrange a regulatory conference, the preliminary assessment of significance will become final.

There are no regulatory commitments contained in this letter. Should you have any questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.

Respectfu I ly,

Peter F. Moodie Plant Manager U.S. Nuclear Regulatory Commission Response to NRC Inspection Report and Preliminary White Finding October 6, 2023 Page 2