Security Baseline Inspection Report 05000317/2020401 and 05000318/2020401
ML20293A379
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/15/2020
From: Fred Bower
Plant Support Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Bower F
References
IR 2020401
Download: ML20293A379 (8)


Text

October 15, 2020

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000317/2020401 AND 05000318/2020401

Dear Mr. Hanson:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2, and discussed the results of this inspection with Mr. Thomas P. Haaf, Site Vice President, and other members of your staff.

The results of this inspection are documented in the enclosed report. Remote inspections were completed on March 30-April 3, 2020, and on-site inspections were completed on September 28-30, 2020.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, X /RA/

Signed by: Fred L. Bower

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000317 and 05000318

License Numbers:

DPR-53 and DPR-69

Report Numbers:

05000317/2020401 and 05000318/2020401

Enterprise Identifier: I-2020-401-0014

Licensee:

Exelon Generation Company, LLC

Facility:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2

Location:

Lusby, MD.

Inspection Dates:

January 6, 2020, to September 30, 2020

Inspectors:

D. Caron, Senior Physical Security Inspector

K. Hussar, Physical Security Inspector

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Calvert Cliffs Nuclear Power Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection on January 6, 2020, unless otherwise noted.

Additionally, remote inspections were completed on March 30-April 3, 2020, and on-site inspections were completed on September 28-30, 2020. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1)

  • Tier I: All requirements
  • Tier II: 3 Requirements (02.05 a, b, 02.08 a)
  • Tier III: 1 Requirement (02.09)

71130.08 - Fitness For Duty Program

Inspection elements associated with the Medical Review Officer and Substance Abuse Expert were conducted during the Limerick baseline inspection dated 1/6 through 1/10/2020. The inspectors evaluated the fitness for duty program by completing the following inspection elements:

Fitness For Duty Program (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 26 Requirements (02.05 a - l, 02.06 a - g, 02.07, 02.08, 02.09 a - e)
  • Tier III: 6 Requirements (02.12 a, 02.13 b, c, d, e, 02.14 b)]

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 30, 2020, the inspectors conducted an exit meeting to present the security baseline inspection results to Mr. Thomas P. Haaf, Site Vice President, and other members of the licensee staff.
  • On April 2, 2020, the inspectors presented a debrief of inspection results from the remote portion of the security baseline inspection to Mr. Mark Flaherty, former Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

AR 04169876

AR 04170945

AR 04171619

AR 04174709

AR 04177447

AR 04179939

AR 04201686

AR 04220267

AR 04220267

AR 04242185

AR 04242583

AR 04245788

AR 04246661

Corrective Action

Documents

Resulting from

Inspection

AR 04222749

Procedures

SY-AA-103-500

Access Authorization Program

Revision 15

SY-AA-103-506

Utilizing The Personnel Access Data System (PADS)

Revision 16

SY-AA-103-511

Request For Access Authorization

Revision 25

SY-AA-103-514

Site Authorization For Unescorted Access

Revision 20

71130.08

Corrective Action

Documents

AR 04170832

AR 04214995

AR 04248461

AR 04253137

Corrective Action

Documents

Resulting from

Inspection

AR 04373255

Miscellaneous

NANTeL Generic Fitness-for-Duty and Behavior Observation

Content Document

06/08/2017

Procedures

LS-AA-119

Fatigue Management and Work Hour Limits

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-102

Exelon Generation Fitness for Duty Program

SY-AA-102-202

Testing for Cause

SY-AA-102-203

Treatment Plan and Follow Up Testing

SY-AA-102-204

Random Testing

SY-AA-102-205

FFD Appeal Review

SY-AA-102-206

Reporting Use of Medication

SY-AA-102-208

Notification of FFD Test Results

SY-AA-102-220

Fitness For Duty Events Reporting

Self-Assessments NOSA-CAL-08-

2016

FFD AA and Corporate Security Audit Report

08/17/2016

NOSA-CAL-08-

2018

FFD AA and Corporate Security Audit Report

08/08/2018