Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip
ML24008A242
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 01/08/2024
From: Moodie P
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24008A241 List:
References
LER 2023-003-00
Download: ML24008A242 (1)


LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip
Event date:
Report date:
3182023003R00 - NRC Website

text

Constellation January 8, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Calvert Cliffs Nuclear Power Plant, Unit No. 2 Renewed Facility Operating License Nos. DPR-69 NRC Docket No. 50-318 Licensee Event Report 2023-003, Revision 00 Peter F. Moodie Plant Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410-495-5205 Office 603-548-7775 Mobile www.constellat1on .com peter.mood1e @.constellat1on .com 10 CFR 50.73 Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip The attached report is being sent to you as required by 10 CFR 50. 73.

There are no regulatory commitments contained in this corresp ondence.

Should you have questions regarding this report, please contact Mr. Larry D. Smith at (410) 495-5219.

Peter F. Moodie Plant Manager PFM/ALS/aj

Attachment:

LER 318-2023-003, Rev 00 cc: NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs S. Seaman, DNR