UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PA 19406-1415

March 3, 2008

Mr. James A. Spina, Vice President

Calvert Cliffs Nuclear Power Plant, Inc.

Constellation Generation Group, LLC

1650 Calvert Cliffs Parkway

Lusby, Maryland 20657-4702

SUBJECT:

ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER

PLANT (REPORTS 05000317/2008001 AND 05000318/2008001)

Dear Mr. Spina:

On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its

performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff

reviewed performance indicators (PIs) for the most recent quarter and inspection results for the

period from January 1 through December 31, 2007. The purpose of this letter is to inform you of

our assessment of your safety performance during this period and our plans for future

inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as Official Use OnlySecurity Information will include

the security cornerstone review and resultant inspection plan.

Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and

safety and fully met all cornerstone objectives. Plant performance for the most recent quarter

was within the Licensee Response column of the NRCs Action Matrix, based on all inspection

findings being classified as having very low safety significance (Green) and all PIs indicating

performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to

conduct reactor oversight process (ROP) baseline inspections at your facility.

While plant performance for the most recent quarter was within the Licensee Response column

of the Action Matrix, Calvert Cliffs Unit 1 was within the Regulatory Response column of the

Action Matrix during the first two quarters of the assessment cycle, based on one finding of low

to moderate safety significance (White) identified in September 2006. The White finding

involved an incorrect circuit breaker setting that impacted operability of the "1A" emergency

diesel generator. The NRC has completed a supplemental inspection in accordance with

inspection procedure 95001. The results of that inspection were provided in NRC Supplemental

Inspection Report 05000317/2007006. As a result of that review, this finding was closed and no

longer considered for plant assessment purposes, effective July 1, 2007.

The enclosed inspection plan details the inspections, less those related to physical protection

scheduled through June 30, 2009. In addition to baseline inspections, we plan on conducting

an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is

provided to allow for the resolution of any scheduling conflicts and personnel availability issues

well in advance of inspector arrival onsite. Routine resident inspections are not listed due to

J. Spina

2

their ongoing and continuous nature. The inspections in the last nine months of the inspection

plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Glenn Dentel of my staff at

610-337-5233, with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director

Division of Reactor Projects

Region I

Docket Nos. 50-317, 50-318

License Nos. DPR-53, DPR-69

Enclosure: Calvert Cliffs Inspection / Activity Plan

cc w/encl:

M. J. Wallace, President, Constellation Generation

J. M. Heffley, Senior Vice President and Chief Nuclear Officer

President, Calvert County Board of Commissioners

C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group

J. Gaines, Director, Licensing

Director, Nuclear Regulatory Matters

R. McLean, Manager, Nuclear Programs

K. Burger, Esquire, Maryland People's Counsel

R. Hickok, NRC Technical Training Center

S. Pattison, SLO (2)

J. Spina

2

their ongoing and continuous nature. The inspections in the last nine months of the inspection

plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Glenn Dentel of my staff at

610-337-5233, with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director

Division of Reactor Projects

Region I

Docket Nos. 50-317, 50-318

License Nos. DPR-53, DPR-69

Enclosure: Calvert Cliffs Inspection / Activity Plan

cc w/encl:

M. J. Wallace, President, Constellation Generation

J. M. Heffley, Senior Vice President and Chief Nuclear Officer

President, Calvert County Board of Commissioners

C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group

J. Gaines, Director, Licensing

Director, Nuclear Regulatory Matters

R. McLean, Manager, Nuclear Programs

K. Burger, Esquire, Maryland People's Counsel

R. Hickok, NRC Technical Training Center

S. Pattison, SLO (2)

DISTRIBUTION

See next page

SUNSI Review Complete: BAB (Reviewer=s Initials)

DOCUMENT NAME: S:\\ROP-8 EOC Review\\Branch 1\\Calvert Cliffs Annual Assessment Ltr.doc

After declaring this document AAn Official Agency Record@ it will be released to the Public. To

receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with

attachment/enclosure "N" = No copy

OFFICE

RI/DRP

RI/DRP

RI/DRP

NAME

BBickett/BAB

GDentel/BAB for

DLew/DCL

DATE

02/26/08

02/27/08

02/29/08

OFFICIAL RECORD COPY

J. Spina

3

Distribution w/encl:

S. Collins, RA

M. Dapas, DRA

G. West, RI OEDO (Acting)

J. Lubinski, NRR

D. Pickett, PM, NRR

M. David, PM, NRR

G. Dentel, DRP

S. Kennedy, DRP, Senior Resident

Inspector

M. Davis, DRP, Resident Inspector

C. Newgent, DRP, Resident OA

Region I Docket Room (with concurrences)

ROPreports@nrc.gov (All IRs)

J. Trapp, DRS

J. Rogge, DRS

S. Hansell, DRS

J. White, DRS

L. Doerflein, DRS

R. Conte, DRS

L. Scholl, DRS

P. Frechette, DRS

D. Silk, DRS

D. Screnci, PAO

N. Sheehan, PAO

R. Barkley, ORA

D. Holody, ORA

J. Thompson, NRR (JWT1@nrc.gov)

Calvert Cliffs

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 3

02/28/2008

15:51:44

Report 22

4

6/16 EXM

- INITIAL OPERATOR LICENSING EXAMS

Not Applicable

CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)

05/19/2008

05/23/2008

1

U01633

Not Applicable

CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)

06/16/2008

06/20/2008

1

U01633

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

02/25/2008

02/29/2008

1, 2

7112101

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

02/25/2008

02/29/2008

1, 2

7112103

IP

Baseline Inspections

Performance Indicator Verification

02/25/2008

02/29/2008

1, 2

71151

IP

1

7111108P

- U1 INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - PWR

02/25/2008

02/29/2008

1

7111108P

IP

1

TI-172

- U1 TI-172 RCS DISSIMILIAR METAL WELDS

Generic Safety Inspectio

Reactor Coolant System Dissimiliar Metal Butt Welds

02/25/2008

02/29/2008

1

2515/172

IP

1

7111108P

- U1 INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - PWR

03/03/2008

03/07/2008

1

7111108P

IP

1

TI-166

- CONTAINMENT SUMP MODIFICATION INSPECTION

Safety Issues

Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

03/03/2008

03/09/2008

1

2515/166

IP

1

7112103

- OCC RAD SAFETY - INSTRUMENTS

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

05/19/2008

05/23/2008

1, 2

7112103

IP

Baseline Inspections

Performance Indicator Verification

05/19/2008

05/23/2008

1, 2

71151

IP

3

TI 171

- TI 171

Generic Safety Inspectio

Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies

05/19/2008

05/23/2008

1, 2

2515/171

IP

6

7111121

- CDBI

Baseline Inspections

Component Design Bases Inspection

06/02/2008

06/06/2008

1, 2

7111121

IP

Baseline Inspections

Component Design Bases Inspection

06/16/2008

06/20/2008

1, 2

7111121

IP

Baseline Inspections

Component Design Bases Inspection

06/23/2008

06/27/2008

1, 2

7111121

IP

1

7112201

- PUB RAD SAFETY - RETS

Baseline Inspections

Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

06/16/2008

06/20/2008

1, 2

7112201

IP

Baseline Inspections

Performance Indicator Verification

06/16/2008

06/20/2008

1, 2

71151

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

08/25/2008

08/29/2008

1, 2

7112101

IP

Baseline Inspections

ALARA Planning and Controls

08/25/2008

08/29/2008

1, 2

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

08/25/2008

08/29/2008

1, 2

7112103

IP

Baseline Inspections

Performance Indicator Verification

08/25/2008

08/29/2008

1, 2

71151

IP

1

ISFSI

- ISFSI - ANNUAL SAMPLE

Other Routine

Operation Of An ISFSI

08/25/2008

08/29/2008

1

60855

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Calvert Cliffs

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 2 of 3

02/28/2008

15:51:44

Report 22

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

11/03/2008

11/07/2008

1, 2

7112101

IP

Baseline Inspections

ALARA Planning and Controls

11/03/2008

11/07/2008

1, 2

7112102

IP

Baseline Inspections

Performance Indicator Verification

11/03/2008

11/07/2008

1, 2

71151

IP

2

EP

- EP PROGRAM INSP

EP Baseline Inspection

Alert and Notification System Testing

11/17/2008

11/21/2008

1, 2

7111402

IP

EP Baseline Inspection

Emergency Response Organization Augmentation Testing

11/17/2008

11/21/2008

1, 2

7111403

IP

EP Baseline Inspection

Emergency Action Level and Emergency Plan Changes

11/17/2008

11/21/2008

1, 2

7111404

IP

EP Baseline Inspection

Correction of Emergency Preparedness Weaknesses and Deficiencies

11/17/2008

11/21/2008

1, 2

7111405

IP

Baseline Inspections

Drill/Exercise Performance

11/17/2008

11/21/2008

1, 2

71151-EP01

IP

Baseline Inspections

ERO Drill Participation

11/17/2008

11/21/2008

1, 2

71151-EP02

IP

Baseline Inspections

Alert & Notification System

11/17/2008

11/21/2008

1, 2

71151-EP03

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

01/19/2009

01/23/2009

1, 2

7112101

IP

Baseline Inspections

ALARA Planning and Controls

01/19/2009

01/23/2009

1, 2

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

01/19/2009

01/23/2009

1, 2

7112103

IP

Baseline Inspections

Occupational Exposure Control Effectiveness

01/19/2009

01/23/2009

1, 2

71151-OR01

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

03/02/2009

03/06/2009

1, 2

7112101

IP

Baseline Inspections

ALARA Planning and Controls

03/02/2009

03/06/2009

1, 2

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

03/02/2009

03/06/2009

1, 2

7112103

IP

Baseline Inspections

Occupational Exposure Control Effectiveness

03/02/2009

03/06/2009

1, 2

71151-OR01

IP

1

7111108P

- U2 INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - PWR

03/02/2009

03/06/2009

2

7111108P

IP

1

TI-172

- TI-172 RCS DISSIMILIAR METAL WELDS

Generic Safety Inspectio

Reactor Coolant System Dissimiliar Metal Butt Welds

03/02/2009

03/06/2009

2

2515/172

IP

1

7111108P

- U2 INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - PWR

03/16/2009

03/20/2009

2

7111108P

IP

2

ISFSI

- ISFSI INSPECTION - ANNUAL SAMPLE

Other Routine

Operation Of An ISFSI

04/01/2009

06/30/2009

1

60855

IP

3

MODS

- PERMANENT PLANT MODIFICATIONS

Baseline Inspections

Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications

04/20/2009

04/24/2009

1, 2

7111117B

IP

Baseline Inspections

Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications

05/04/2009

05/08/2009

1, 2

7111117B

IP

1

7111107B

- HEAT SINK INSP

Baseline Inspections

Heat Sink Performance

06/01/2009

06/05/2009

1, 2

7111107B

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Calvert Cliffs

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 3 of 3

02/28/2008

15:51:44

Report 22

1

7112202

- PUB RAD SAFETY - RADWASTE

Baseline Inspections

Radioactive Material Processing and Transportation

06/15/2009

06/19/2009

1, 2

7112202

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.