UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PA 19406-1415
March 3, 2008
Mr. James A. Spina, Vice President
Calvert Cliffs Nuclear Power Plant, Inc.
Constellation Generation Group, LLC
1650 Calvert Cliffs Parkway
Lusby, Maryland 20657-4702
SUBJECT:
ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER
PLANT (REPORTS 05000317/2008001 AND 05000318/2008001)
Dear Mr. Spina:
On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its
performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff
reviewed performance indicators (PIs) for the most recent quarter and inspection results for the
period from January 1 through December 31, 2007. The purpose of this letter is to inform you of
our assessment of your safety performance during this period and our plans for future
inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as Official Use OnlySecurity Information will include
the security cornerstone review and resultant inspection plan.
Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and
safety and fully met all cornerstone objectives. Plant performance for the most recent quarter
was within the Licensee Response column of the NRCs Action Matrix, based on all inspection
findings being classified as having very low safety significance (Green) and all PIs indicating
performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to
conduct reactor oversight process (ROP) baseline inspections at your facility.
While plant performance for the most recent quarter was within the Licensee Response column
of the Action Matrix, Calvert Cliffs Unit 1 was within the Regulatory Response column of the
Action Matrix during the first two quarters of the assessment cycle, based on one finding of low
to moderate safety significance (White) identified in September 2006. The White finding
involved an incorrect circuit breaker setting that impacted operability of the "1A" emergency
diesel generator. The NRC has completed a supplemental inspection in accordance with
inspection procedure 95001. The results of that inspection were provided in NRC Supplemental
Inspection Report 05000317/2007006. As a result of that review, this finding was closed and no
longer considered for plant assessment purposes, effective July 1, 2007.
The enclosed inspection plan details the inspections, less those related to physical protection
scheduled through June 30, 2009. In addition to baseline inspections, we plan on conducting
an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is
provided to allow for the resolution of any scheduling conflicts and personnel availability issues
well in advance of inspector arrival onsite. Routine resident inspections are not listed due to
J. Spina
2
their ongoing and continuous nature. The inspections in the last nine months of the inspection
plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233, with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
David C. Lew, Director
Division of Reactor Projects
Region I
Docket Nos. 50-317, 50-318
Enclosure: Calvert Cliffs Inspection / Activity Plan
cc w/encl:
M. J. Wallace, President, Constellation Generation
J. M. Heffley, Senior Vice President and Chief Nuclear Officer
President, Calvert County Board of Commissioners
C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group
J. Gaines, Director, Licensing
Director, Nuclear Regulatory Matters
R. McLean, Manager, Nuclear Programs
K. Burger, Esquire, Maryland People's Counsel
R. Hickok, NRC Technical Training Center
S. Pattison, SLO (2)
J. Spina
2
their ongoing and continuous nature. The inspections in the last nine months of the inspection
plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233, with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
David C. Lew, Director
Division of Reactor Projects
Region I
Docket Nos. 50-317, 50-318
Enclosure: Calvert Cliffs Inspection / Activity Plan
cc w/encl:
M. J. Wallace, President, Constellation Generation
J. M. Heffley, Senior Vice President and Chief Nuclear Officer
President, Calvert County Board of Commissioners
C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group
J. Gaines, Director, Licensing
Director, Nuclear Regulatory Matters
R. McLean, Manager, Nuclear Programs
K. Burger, Esquire, Maryland People's Counsel
R. Hickok, NRC Technical Training Center
S. Pattison, SLO (2)
DISTRIBUTION
See next page
SUNSI Review Complete: BAB (Reviewer=s Initials)
DOCUMENT NAME: S:\\ROP-8 EOC Review\\Branch 1\\Calvert Cliffs Annual Assessment Ltr.doc
After declaring this document AAn Official Agency Record@ it will be released to the Public. To
receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with
attachment/enclosure "N" = No copy
OFFICE
RI/DRP
RI/DRP
RI/DRP
NAME
BBickett/BAB
GDentel/BAB for
DLew/DCL
DATE
02/26/08
02/27/08
02/29/08
OFFICIAL RECORD COPY
J. Spina
3
Distribution w/encl:
S. Collins, RA
M. Dapas, DRA
G. West, RI OEDO (Acting)
J. Lubinski, NRR
G. Dentel, DRP
S. Kennedy, DRP, Senior Resident
Inspector
M. Davis, DRP, Resident Inspector
C. Newgent, DRP, Resident OA
Region I Docket Room (with concurrences)
ROPreports@nrc.gov (All IRs)
J. Trapp, DRS
J. Rogge, DRS
S. Hansell, DRS
J. White, DRS
L. Doerflein, DRS
R. Conte, DRS
L. Scholl, DRS
P. Frechette, DRS
D. Silk, DRS
D. Screnci, PAO
N. Sheehan, PAO
R. Barkley, ORA
D. Holody, ORA
J. Thompson, NRR (JWT1@nrc.gov)
Calvert Cliffs
Inspection / Activity Plan
01/01/2008 - 06/30/2009
Inspection
Type
Inspection Activity
Planned Dates
Start End
No. of Staff
on Site
Title
Unit
Number
Page 1 of 3
02/28/2008
15:51:44
Report 22
4
6/16 EXM
- INITIAL OPERATOR LICENSING EXAMS
Not Applicable
CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)
05/19/2008
05/23/2008
1
U01633
Not Applicable
CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)
06/16/2008
06/20/2008
1
U01633
1
71121
- OCC RAD SAFETY
Baseline Inspections
Access Control to Radiologically Significant Areas
02/25/2008
02/29/2008
1, 2
7112101
IP
Baseline Inspections
Radiation Monitoring Instrumentation and Protective Equipment
02/25/2008
02/29/2008
1, 2
7112103
IP
Baseline Inspections
Performance Indicator Verification
02/25/2008
02/29/2008
1, 2
71151
IP
1
7111108P
- U1 INSERVICE INSPECTION
Baseline Inspections
Inservice Inspection Activities - PWR
02/25/2008
02/29/2008
1
7111108P
IP
1
TI-172
- U1 TI-172 RCS DISSIMILIAR METAL WELDS
Generic Safety Inspectio
Reactor Coolant System Dissimiliar Metal Butt Welds
02/25/2008
02/29/2008
1
2515/172
IP
1
7111108P
- U1 INSERVICE INSPECTION
Baseline Inspections
Inservice Inspection Activities - PWR
03/03/2008
03/07/2008
1
7111108P
IP
1
TI-166
- CONTAINMENT SUMP MODIFICATION INSPECTION
Safety Issues
Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
03/03/2008
03/09/2008
1
2515/166
IP
1
7112103
- OCC RAD SAFETY - INSTRUMENTS
Baseline Inspections
Radiation Monitoring Instrumentation and Protective Equipment
05/19/2008
05/23/2008
1, 2
7112103
IP
Baseline Inspections
Performance Indicator Verification
05/19/2008
05/23/2008
1, 2
71151
IP
3
TI 171
- TI 171
Generic Safety Inspectio
Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies
05/19/2008
05/23/2008
1, 2
2515/171
IP
6
7111121
- CDBI
Baseline Inspections
Component Design Bases Inspection
06/02/2008
06/06/2008
1, 2
7111121
IP
Baseline Inspections
Component Design Bases Inspection
06/16/2008
06/20/2008
1, 2
7111121
IP
Baseline Inspections
Component Design Bases Inspection
06/23/2008
06/27/2008
1, 2
7111121
IP
1
7112201
- PUB RAD SAFETY - RETS
Baseline Inspections
Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
06/16/2008
06/20/2008
1, 2
7112201
IP
Baseline Inspections
Performance Indicator Verification
06/16/2008
06/20/2008
1, 2
71151
IP
1
71121
- OCC RAD SAFETY
Baseline Inspections
Access Control to Radiologically Significant Areas
08/25/2008
08/29/2008
1, 2
7112101
IP
Baseline Inspections
ALARA Planning and Controls
08/25/2008
08/29/2008
1, 2
7112102
IP
Baseline Inspections
Radiation Monitoring Instrumentation and Protective Equipment
08/25/2008
08/29/2008
1, 2
7112103
IP
Baseline Inspections
Performance Indicator Verification
08/25/2008
08/29/2008
1, 2
71151
IP
1
- ISFSI - ANNUAL SAMPLE
Other Routine
Operation Of An ISFSI
08/25/2008
08/29/2008
1
60855
IP
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs
Inspection / Activity Plan
01/01/2008 - 06/30/2009
Inspection
Type
Inspection Activity
Planned Dates
Start End
No. of Staff
on Site
Title
Unit
Number
Page 2 of 3
02/28/2008
15:51:44
Report 22
1
71121
- OCC RAD SAFETY
Baseline Inspections
Access Control to Radiologically Significant Areas
11/03/2008
11/07/2008
1, 2
7112101
IP
Baseline Inspections
ALARA Planning and Controls
11/03/2008
11/07/2008
1, 2
7112102
IP
Baseline Inspections
Performance Indicator Verification
11/03/2008
11/07/2008
1, 2
71151
IP
2
- EP PROGRAM INSP
EP Baseline Inspection
Alert and Notification System Testing
11/17/2008
11/21/2008
1, 2
7111402
IP
EP Baseline Inspection
Emergency Response Organization Augmentation Testing
11/17/2008
11/21/2008
1, 2
7111403
IP
EP Baseline Inspection
Emergency Action Level and Emergency Plan Changes
11/17/2008
11/21/2008
1, 2
7111404
IP
EP Baseline Inspection
Correction of Emergency Preparedness Weaknesses and Deficiencies
11/17/2008
11/21/2008
1, 2
7111405
IP
Baseline Inspections
Drill/Exercise Performance
11/17/2008
11/21/2008
1, 2
71151-EP01
IP
Baseline Inspections
ERO Drill Participation
11/17/2008
11/21/2008
1, 2
71151-EP02
IP
Baseline Inspections
Alert & Notification System
11/17/2008
11/21/2008
1, 2
71151-EP03
IP
1
71121
- OCC RAD SAFETY
Baseline Inspections
Access Control to Radiologically Significant Areas
01/19/2009
01/23/2009
1, 2
7112101
IP
Baseline Inspections
ALARA Planning and Controls
01/19/2009
01/23/2009
1, 2
7112102
IP
Baseline Inspections
Radiation Monitoring Instrumentation and Protective Equipment
01/19/2009
01/23/2009
1, 2
7112103
IP
Baseline Inspections
Occupational Exposure Control Effectiveness
01/19/2009
01/23/2009
1, 2
71151-OR01
IP
1
71121
- OCC RAD SAFETY
Baseline Inspections
Access Control to Radiologically Significant Areas
03/02/2009
03/06/2009
1, 2
7112101
IP
Baseline Inspections
ALARA Planning and Controls
03/02/2009
03/06/2009
1, 2
7112102
IP
Baseline Inspections
Radiation Monitoring Instrumentation and Protective Equipment
03/02/2009
03/06/2009
1, 2
7112103
IP
Baseline Inspections
Occupational Exposure Control Effectiveness
03/02/2009
03/06/2009
1, 2
71151-OR01
IP
1
7111108P
- U2 INSERVICE INSPECTION
Baseline Inspections
Inservice Inspection Activities - PWR
03/02/2009
03/06/2009
2
7111108P
IP
1
TI-172
- TI-172 RCS DISSIMILIAR METAL WELDS
Generic Safety Inspectio
Reactor Coolant System Dissimiliar Metal Butt Welds
03/02/2009
03/06/2009
2
2515/172
IP
1
7111108P
- U2 INSERVICE INSPECTION
Baseline Inspections
Inservice Inspection Activities - PWR
03/16/2009
03/20/2009
2
7111108P
IP
2
- ISFSI INSPECTION - ANNUAL SAMPLE
Other Routine
Operation Of An ISFSI
04/01/2009
06/30/2009
1
60855
IP
3
MODS
- PERMANENT PLANT MODIFICATIONS
Baseline Inspections
Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications
04/20/2009
04/24/2009
1, 2
7111117B
IP
Baseline Inspections
Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications
05/04/2009
05/08/2009
1, 2
7111117B
IP
1
7111107B
- HEAT SINK INSP
Baseline Inspections
Heat Sink Performance
06/01/2009
06/05/2009
1, 2
7111107B
IP
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs
Inspection / Activity Plan
01/01/2008 - 06/30/2009
Inspection
Type
Inspection Activity
Planned Dates
Start End
No. of Staff
on Site
Title
Unit
Number
Page 3 of 3
02/28/2008
15:51:44
Report 22
1
7112202
- PUB RAD SAFETY - RADWASTE
Baseline Inspections
Radioactive Material Processing and Transportation
06/15/2009
06/19/2009
1, 2
7112202
IP
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.