MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank 2024-09-06
[Table view] |
See also: IR 05000317/2024010
Text
January 29, 2024
David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -
REQUEST FOR INFORMATION AND NOTIFICATION OF CONDUCT OF IP
71111.21.N.04, AGE-RELATED DEGRADATION, REFERENCE
INSPECTION REPORT 05000317/2024010 AND 05000318/2024010
Dear David Rhoades:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct IP 71111.21N.04, Age-Related Degradation, baseline inspection at the Calvert
Cliffs Nuclear Power Plant in April 2024. Kevin Mangan, a Senior Reactor Inspector from the
NRCs Region I Office, will lead the inspection team. The team will be composed of personnel
from the NRC Region I Office. The inspection will be conducted in accordance with IP
71111.21N.04, dated January 1, 2024 (ADAMS Accession No. ML23318A426). The inspection
will evaluate the implementation of the programs and activities to determine on a sampling basis
that age-related degradation of structures and components (SCs) is identified and addressed.
The schedule for the inspection is as follows:
Information gathering visit: Week of March 4, 2024
Onsite inspection: Weeks of April 8 and April 22, 2024
The purpose of the information gathering visit is to become familiar with the station
maintenance, surveillance, testing, inspection, and condition monitoring programs, become
familiar with plant layout, support identification of SCs that will be reviewed during the
inspection, and, as necessary, obtain plant specific site access training and badging for
unescorted site access. An initial list of documents that the team will review during the
information gathering visit are listed in the attached Enclosure.
During the information gathering visit, the team leader will also discuss the following
inspection support administrative details: office space size and location; specific documents
requested to be made available to the team in their office spaces; arrangements for reactor
site access and the availability of knowledgeable plant staff and licensing organization
personnel to serve as points of contact during the inspection.
D. Rhoades
2
For SCs that the inspection will review, an initial list of the documents the team will review during
the conduct of the inspection are also listed in the Enclosure. The team leader will contact you
with identified SCs. Also, personnel should be available at the site during the inspection who are
knowledgeable regarding maintenance, surveillance, testing, inspection, and condition
monitoring programs.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, under Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 Code of Federal Regulations (10 CFR) 2.390 of the NRC rules and
practices, a copy of this letter and its enclosures will be available electronically for public
inspection in the NRC public document room or from the publicly available records component
of NRCs document system (ADAMS). ADAMS is accessible from the NRC website
(http://www.nrc.gov/reading-rm/adams.html).
This baseline inspection and the supporting inspection procedure and documentation template
are new to the Reactor Oversight Process this year. As such, please communicate with the team
lead readily if there are questions as to document scope or suggestions to better accomplish this
process.
Sincerely,
Mel Gray,
Branch Chief
Engineering Branch 1
Division of Operating Reactor Safety
Docket Nos. 05000317 and 05000318 License
Nos. DPR-53 and DPR-69
Enclosure:
Documents Requested for Information
Gathering Visit
cc w/encl: Distribution via ListServ
Melvin K.
Gray
Digitally signed by Melvin
K. Gray
Date: 2024.01.29
08:24:59 -05'00'
ML24029A010
X
SUNSI Review
x
Non-Sensitive
Sensitive
x
Publicly Available
Non-Publicly Available
OFFICE
RI/DORS
RI/DORS
NAME
KMangan
MGray
DATE
1/25/2024
1/26/2024
Enclosure: Documents Requested for Information Gathering Visit
The following information is requested by March 4, 2024, which is the first day of the information
gathering trip. Electronic format is the preferred media. If electronic media is made available via
an internet based remote document management system, then the remote document access
should allow inspectors to download, save, and print the documents in the NRC's regional office.
Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of the
inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below.
Contact Information:
Team Leader: Kevin Mangan
Email: kevin.mangan@nrc.gov
Telephone: (610) 337-5234
Documents Requested:
1) A list of 50.65 (a)(1) structures, systems and components from the past 5 years.
2) A list of maintenance rule functional failure evaluations from the past 5 years.
3) A list of most recent system health status for High Safety Significance (HSS) and degraded
Low Safety Significance (LSS) systems.
4) Maintenance rule scoping and performance criteria document.
5) The most recent evaluation of maintenance effectiveness required per 10 CFR 50.65(a)(3).
6) List of preventative maintenance deferrals and preventative maintenance change requests
in the last 5 years.
7) List of corrective action documents associated with component failures, or keyword
search of aging, age-related, wear, accelerated wear, corrosion, abnormal
wear, accelerated degradation, and abnormal degradation from the past 5 years. If
the site uses other terms to identify age-related degradation mechanisms, please
provide a list related to those terms. Please include a short description of the issue in
the system generated listing.
8) A list of Part 21 Reports applicable to the site from the past 5 years.
9) A list of top 100 most risk-significant SCs. If possible, designate the component as active
or passive in the risk ranking.
10) The site-specific probabilistic risk assessment (PRA) identifying risk-significant functions
and latest PRA Summary Document.
11) A list of RISC-1, RISC-2, and RISC-3 SSCs.
Enclosure: Documents Requested for Information Gathering Visit
12) List of risk-significant long-lived passive SCs.
13) Equipment reliability characterization and preventative maintenance program
procedures.
14) Scoping document and basis for 10 CFR 50.49, Environmental Qualification.
15) Aging management programs and basis documents.
16) List of systems (system numbers / designators and corresponding noun names).
17) A listing of commercial grade dedication packages for the last 5 years.