Annual Assessment Letter
ML100620809
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/03/2010
From: David Lew
Division Reactor Projects I
To: George Gellrich
Calvert Cliffs, Constellation Generation Group
Shared Package
ML100470419 List:
References
IR-10-001
Download: ML100620809 (5)


Text

UNITED STAT'ES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 3, 2010 Mr. George H. Gellrich. Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702

SUBJECT:

ANNUAL ASSESSMENT LEITER - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORTS 05000317/2010001 AND 05000318/2010001)

Dear Mr. Gellrich:

On February 12, 2010, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Information" will include the security cornerstone review and reSUltant inspection plan.

Overall. Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives; Plant performance for the most recent quarter at

'Calvert Cliffs Units 1 and 2 was within the Regulatory Response column of the NRC's Action Matrix, based on one finding having low to moderate safety significance (White). This finding involved Calvert Cliff's emergency action level table's fission product barrier matrix being incorrect resulting in a degraded risk significant planning standard function. On December 4, 2009, we completed a supplemental inspection pursuant to Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," and the inspection report (ML100150225) 1 was issued on January 15, 2010. The inspection revealed no additional findings of safety significance and closed the White Emergency Preparedness inspection finding. Therefore, this finding has been removed from consideration in the performance assessment process in the first quarter of 2010.

The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2011. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

IDesignation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.

J. Gellrich 2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.htmt (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sin~ /J

~('~--

David C. Lew, Director Division of Reactor Projects Region I Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69

Enclosure:

Calvert Cliffs Inspection I Activity Plan cc w/encl:

Distribution via ListServ

J. Gellrich 2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at 610-337*5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely.

IRAJ David C. Lew, Director Division of Reactor Projects Region I Docket Nos. 50-317, 50-318 License Nos. DPR*53, DPR-69

Enclosure:

Calvert Cliffs Inspection I Activity Plan M. Davis, DRP, RI S. Collins, RA (R10RAMAIL RESOURCE)

C. Newgent, DRP, Resident OA M. Dapas, ORA (R10RAMAIL RESOURCE)

RidsNrrPMCalvertCI iffs Resource D. Lew, DRP (R1DRPMAIL RESOURCE)

RidsNrrDorlLpl1-1 Resource J. Clifford, DRP (R1DRPMAIL RESOURCE)

ROPreportsResource@nrc.gov D. Roberts, DRS (R1DRSMaU Resource)

DRS Branch Chiefs (6)

P. Wilson, DRS (R1DRSMail Resource)

L. Scholl, DRS L. Trocine, RI OEDO S. Barr, DRS G. Dentel, DRP J, Trapp, DRS N. Perry, DRP D.Silk, DRS J. Hawkins, DRP D. Serene!, PAO S. Sloan, DRP N. Sheehan, PAO S. Kennedy, DRP, SRI R. Barkley, ORA SUNSI Review Complete:

NP (Reviewer's Initials)

ML100620809 DOCUMENT NAME: S:\\ROP-10 EOC RevieW\\Branch 1\\Calvert Cliffs AA Letter.doc After declaring this document "An Official Agency Record", it will be released to the Public.

To receive acopy of this document, indicate in the bOX: 'c'" Copy withou1 attacl1mllntieooosure 'E' = Copy with atlacl1menlfencklsure "N' "No copy OFFICE RIIDRP 1

IRI/DRP 1

RIIDRP 1

NAME NPerry/NP DLewfDCS DATE 02122/2010 102123/2010 03/01/2010 OFFICIAL RECORD COPY

Page 1012 02/19/2010 10:14:39 Report 22 Planned Dates TI*177 IP 25151177 71124 IP 71124.01 lP 71124.02 71124 IP 71124.01 IP 71124.02 IP 71124.03 IP 71124.04 IP 71124.05 7111108P IP 7111108P TI*172 IP 2515/172 8/2EXAM U01770 U01770 71124.05 IP 71124.05 71124.06 IP 71124.06 2515(173 IP 2515/173 ISFSI IP 60855 IP 60855.1 EP PROGR IP 7111402 IP 7111403 IP 7111404 (P 7111405 IP 71151-EP01 IP 71151-EP02 IP 71151-EP03 Calvert Cliffs Inspection I Activity Plan 01/01/2010 - 06/30/2011 Title

- MANAGING GAS ACCUMULATION IN ECCS 3

Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System

- RADIATION SAFETY 1

Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls

- RADIATION SAFETY 1

Radiological Hazard Assessment and Exposure Controls Occupational AlARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation Occupational Dose Assessment Radiation Monitoring Instrumentation

- UNIT 11NSERVICE INSPECTION Inservlce Inspection Activities - PWR

- OPERATOR LICENSING INITIAL EXAMS 4

FY10 - CALVERT CUFFS UNIT 1&2 INITIAL OPERATOR LICENSING EXAM FY10 - CALVERT CLIFFS UNIT 1&2 INIT!AL OPERA.TOR LICENSING EX.4.M

- RAD MONITORING INSTRUMENTS 1

Radiation MonitOring Instrumentation

- RAD GAS & LlQ EFFLUENTS SYSTEM Radioactive Gaseous and Liquid Effluent Treatment

-INDUSTRY GROUND WATER INITIATIVE Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative

- ISFSI LOADING CAMPAIGN Operation Of An ISFSI Operation of an Independent Spent Fuel Storage Installation at Operating Plants

- EP PROGRAM INSPECTION 1.2 1,2 1,2 1.2 1,2 1,2 1,2 1.2 1.2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1.2 1.2 1,2 1.2 Start W'

01/11/2010 01/25/2010 01(25/2010 03101/2010 0310112010 03101/2010 03/01/2010 03101/2010 03/0112010 0310112010 06128/2010 08102/2010 05103/2010 0610712010 0610112010 0711212010 07/1212010 08/0212010 08/0212010 08/0212010 08/02/2010 08/0212010 0810212010 08/0212010 End 01/1512010 01/2912010 0112912010 03/0512010 0310512010 0310512010 03105/2010 03105/2010 03/1212010 03112/2010 0710212010 08113/2010 05/0712010 06/1112010 0611112010 07/1612010 07/16/2010 0810612010 0810612010 0810612010 08/06/2010 08/0612010 0810612010 0810612010 Radiological Environmental Monitoring Program Emergency Response Organization Augmentation Testing Emergency Action Level and Emergency Plan Changes Correction of Emergency Preparedness Weaknesses and Deficiencies DrilUExercise Performance ERO Drill Participation Alert &Notification System his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 20f2 02/1912010 10:14:39 Report 22 Planned Dates 3

1 1

1 1

1 1

3 05/2012011 IP 7111107T 7111107T 05/2012011 IP 7111107T 7111117 01/0112011 IP 7111117T Calvert Cliffs Inspection I Activity Plan 01101/2010 - 0613012011

- TRIENNIAL FIRE PROTECTION INSPECTION Fire Protection {TrienniaO FireProtectionrrriennial]

- RAD SAFETY* RAO HAZZARD/ALARA & ISFSI Title Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiological Hazard Assessment and Exposure Controls Occupational AlARA Planning and Controls Performance Indicator Verification

- RAD MATERIAL AND TRANSPORTATION Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

- TI2515/172 RCS OM WELDS Reactor Coolant System Dissimiliar Meta! Butt Welds

- U21NSERVICE INSPECTION' 1,2 1.2 1,2 1,2 1.2 1.2 1,2 2

2 1.2 1.2 1.2 1.2 1.2 1

2 1,2 Start 11/15/2010 1112912010 1210612010 1210612010 1210612010 1210612010 01/2412011 0212812011 02/28/2011 03/07/2011 03/07/2011 03/0712011 03/07/2011 0310712011 05/16/2011 05/1612011 0612712011 End 1111912010 12103/2010 1211012010 12/1012010 12f1012010 12f10f2010 0112812011 03111/2011 0311112011 03/11/2011 03/11/2011 03/11/2011 03/11/2011 03111/2011 TRI FIRE IP 7111105T IP 7111105T 71124 IP 60855.1 IP 71124.01 IP 71124.02 IP 71151 71124.08 IP 71124.08 2515/172 I P 25151172 7111108P IP 7111108P 71124.01 IP 71124.01 IP 71124.02 IP 71124.03 IP 71124.04 IP 71124.05 7111107T lnservice Inspection Activities* PWR

- RAD HAZZARD ASSESS OUT, ALARA, AIR, DOSE Radiological Ha:zard Assessment and Exposure Controls Occupational ALARA Planning and Controls tn-Plant AirbomJl-Radioacti....1ty Control and Mitigation Occupational Dose Assessment Radiation Monitoring Instrumentation

- TRIENNIAL HEAT SINK Heat Sink Performance

- TRIENNIAL HEAT SINK Heat Sink Performance

  • PERMANENT PLANT MODIFICATIONS Evaluations of Changes, Tests. or Experiments and Permanent Plant Modifications his report does not and OUTAGE activities.