MONTHYEARIR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) IR 05000317/20220062023-03-0101 March 2023 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2022006 and 05000318/2022006) IR 05000317/20234012023-02-16016 February 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000317/2023401 and 05000318/2023401 ML23040A0102023-02-0909 February 2023 Notification of Commercial Grade Dedication Inspection (05000317/2023012 and 05000318/2023012) and Request for Information IR 05000317/20220052022-08-31031 August 2022 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2022005 and 05000318/2022005) ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection IR 05000317/20210062022-03-0202 March 2022 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2021006 and 05000318/2021006) IR 05000317/20210052021-09-0101 September 2021 Updated Inspection Plan for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2021005 and 05000318/2021005) ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request IR 05000317/20200062021-03-0303 March 2021 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2020006 and 05000318/2020006) IR 05000317/20210102021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 IR 05000317/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000317/2020005 and 05000318/2020005) ML20154K4602020-06-0202 June 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000317/2020011 and 05000318/2020011 IR 05000317/20200112020-06-0202 June 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000317/2020011 and 05000318/2020011 IR 05000317/20190062020-03-0303 March 2020 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2019006 and 05000318/2019006) IR 05000317/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000317/2019005 and 05000318/2019005) ML19141A1242019-05-21021 May 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000317/20180062019-03-0404 March 2019 Annual Assessment Letter for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2018006 and 05000318/2018006) ML18348A4812018-12-13013 December 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000317/2019403 and 05000318/2019403 IR 05000317/20180052018-08-28028 August 2018 Updated Inspection Plan: Inspection Report 05000317/2018005 and 05000318/2018005 IR 05000317/20170062018-02-28028 February 2018 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2017006 and 05000318/2017006, Report 05000317/2017402 and 05000318/2017402, Report 05000317/2017501 and 05000318/2017501) IR 05000317/20170052017-08-28028 August 2017 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Inspection Report 05000317/2017005 and 05000318/2017005 IR 05000317/20160062017-03-0101 March 2017 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2016006 and 05000318/2016006) IR 05000317/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Report 05000317/2016005 and 05000318/2016005 IR 05000317/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2015006 and 05000318/2015006) IR 05000317/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2015005 and 05000318/2015005) IR 05000317/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, (Report 05000317/2014001 and 05000318/2014001)(w/Inspection Plan) IR 05000317/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-14-006 and 05000318-14-006) ML14206A9932014-07-25025 July 2014 Conrete Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNPP-CHLE-010, Revision 1 IR 05000317/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2013001 and 05000318/2013001) (W/Inspection Plan) ML13267A0052013-09-23023 September 2013 Requal Program Inspection 60 Day Letter IR 05000317/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-13-006 and 05000318-13-006) IR 05000317/20120012013-03-0404 March 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 & 2 (Report 05000317-12-001 and 05000318-12-001) ML12244A2032012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20110012012-03-0505 March 2012 Annual Assessment Letter(Report 05000317/2011001 and 05000318/2011001) ML1124208652011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20100012011-03-0404 March 2011 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant-05000317/2010001 and 05000318/2010001 ML1031402312010-11-10010 November 2010 Pre-Inspection Cover Sheet and Inspection Plan (12/6/10 - 12/10/10) ML1024402082010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Calvert Cliffs Nuclear Power Plant ML1016600082010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/7 - 6/11/10) ML1006208092010-03-0303 March 2010 Annual Assessment Letter ML0924402772009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant, Dated 09/01/2009 IR 05000317/20090012009-03-0404 March 2009 IR 05000317-09-001 and 05000318-09-001, on 01/01/2009 - 12/31/2008, Calvert Cliffs Nuclear Power Plant Annual Assessment Report IR 05000317/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Calvert Cliffs, (IR 05000317-08-001 and 05000318-08-001) ML0806100132008-03-0303 March 2008 (05000317-08-001, 05000318-08-001, )Annual Assessment Letter EOC 2007 ROP8 ML0734707242007-12-13013 December 2007 ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant ML0724309302007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant IR 05000317/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Calvert Cliffs Station (IR 05000317-07-001 and 05000318-07-001) ML0624304482006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank 2024-09-06
[Table view] |
See also: IR 05000317/2019403
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BOULEVARD, SUITE 100
KING OF PRUSSIA, PA 19406-2713
December 13, 2018
Mr. Bryan C. Hanson
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: CALVERT CLIFFS NUCLEAR POWER PLANT - INFORMATION REQUEST FOR
THE CYBER-SECURITY INSPECTION, NOTIFICATION TO PERFORM
INSPECTION 05000317/2019403 AND 05000318/2019403
Dear Mr. Hanson:
On April 29, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a team inspection
in accordance with Inspection Procedure 71130.10P, Cyber-Security, issued May 15, 2017, at
Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2. The inspection will be performed to
evaluate and verify your ability to meet full implementation requirements of the NRCs
Cyber-Security Rule, Title 10 of the Code of Federal Regulations (CFR) Part 73, Section 54,
Protection of Digital Computer and Communication Systems and Networks. The onsite portion
of the inspection will take place during the weeks of April 29, 2019, and May 13, 2019.
Experience has shown that team inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by the cyber security inspection procedure. This
information should be made available via compact disc and delivered to the regional office no
later than February 4, 2019. The inspection team will review this information and, by March 4,
2019, will request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
and the areas of your plants Cyber Security Program selected for the cyber security inspection.
This information will be requested for review in the regional office prior to the inspection by
April 1, 2019
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, April 29, 2019.
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
B. Hanson 2
The lead inspector for this inspection is David Werkheiser. We understand that our regulatory
contact for this inspection is Ken Green of your organization. If there are any questions about
the inspection or the material requested, please contact the lead inspector at 610-337-5316 or
via e-mail at David.Werkheiser@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
This letter and its enclosure will be available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Glenn T. Dentel, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-317 and 50-318
License Nos. DPR-53 and DPR-69
Enclosure:
Calvert Cliffs Nuclear Power Plant
Cyber-Security Inspection Document Request
cc w/encl: Distribution via ListServ
ML18348A481
Non-Sensitive Publicly Available
SUNSI Review
Sensitive Non-Publicly Available
OFFICE RI/DRS RI/DRS
NAME DWerkheiser GDentel
DATE 12/12/18 12/13/18
CALVERT CLIFFS NUCLEAR POWER PLANT
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report: 05000317/2019403 and 05000318/2019403
Inspection Dates: April 29 - May 3, 2019 and May 13 - 17, 2019
Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date May 15, 2017
Reference: Guidance Document for Development of the Request for
Information (RFI) and Notification Letter for Full-Implementation of
the Cyber Security Inspection, Issue Date October 26, 2017
NRC Inspectors: David Werkheiser, Lead Louis Dumont
610-337-5316 610-337-5183
David.Werkheiser@nrc.gov Louis.Dumont@nrc.gov
NRC Contractors: Cynthia DeBisschop William (Bill) Johns
Cynthia.DeBisschop@nrc.gov William.Johns@nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection
team with the general information necessary to select appropriate components and
Cyber Security Program (CSP) elements to develop a site-specific inspection plan.
The first RFI is used to identify the list of critical systems and critical digital assets
(CSs/CDAs) plus operational and management (O&M) security control portions of the
CSP to be chosen as the sample set required to be inspected by the cyber security IP.
The first RFIs requested information is specified below in Table RFI #1. The
Table RFI #1 information is requested to be provided to the regional office by
February 4, 2019, or sooner, to facilitate the selection of the specific items that will be
reviewed during the onsite inspection weeks.
The inspection team will examine the returned documentation from the first RFI and
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
focused follow-up request to develop the second RFI. The inspection team will submit
the specific systems and equipment list to your staff by March 4, 2019, which will identify
the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
defensive architecture, and the areas of the licensees CSP selected for the cyber
security inspection. We request that the additional information provided from the second
RFI be made available to the regional office by April 1, 2019. All requests for information
responses shall follow the RFI table matrix and the guidance document referenced
above.
The required Table RFI #1 information shall be provided on compact disc (CD) to the
lead inspector by February 4, 2019. Please provide four copies of each CD submitted
(i.e., one for each inspector/contractor). The preferred file format for all lists is a
1 Enclosure
CALVERT CLIFFS NUCLEAR POWER PLANT
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-
linked to facilitate ease of use. If you have any questions regarding this information,
please call the inspection team leader as soon as possible.
Table RFI #1
Reference Section 3,
Paragraph Number/Title: Items
1 List All Identified Critical Systems and Critical Digital Assets All
List CDA Facility and Site Ethernet - Transmission Control
2 Protocol/Internet Protocol (TCP/IP) Based Local Area Networks All
(LANs) and Identify Those LANs That Have Non-CDAs On Them
List CDA Facility and Site Non-Ethernet TCP/IP Based LANs Including
3 Those Industrial Networks and Identify LANs That Have Non-CDAs On All
Them
Network Topology Diagrams (Be Sure To Include all Network Intrusion
Detection Systems (NIDS) and Security Information and Event
4 All
Management (SIEMs) for Emergency Preparedness (EP) networks
and Security Level 3 and 4 Networks)
List All Network Security Boundary Devices for EP Networks and All
8 All
Network Security Boundary Devices for Levels 3 and 4
9 List CDA Wireless Industrial Networks All
NIDS Documentation for Critical Systems That Have CDAs Associated 11.a.1)
11
with Them 11.a.2)
SIEM Documentation for Critical systems That Have CDAs Associated 12.a.1)
12
with Them 12.a.2)
List EP and Security Onsite and Offsite Digital Communication
14 All
Systems
Cyber Security Assessment and Cyber Security Incident Response
25 All
Teams
In addition to the above information please provide the following:
(1) Electronic copy of your current Cyber Security Plan.
(2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p
analysis to support those changes, made to the originally approved Cyber
Security Plan.
(3) Electronic copy of a matrix that summarizes what controls are in place to satisfy
the controls required by Policies and Procedures.
(4) Electronic copy of the Updated Final Safety Analysis Report and Technical
Specifications.
(5) Name(s) and phone numbers for the regulatory and technical contacts.
(6) Current management and engineering organizational charts.
(7) In a separate directory, an electronic copy of the documents listed in the matrix
from (3) above.
2
CALVERT CLIFFS NUCLEAR POWER PLANT
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Based on this information, the inspection team will identify and select specific systems
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
will submit a list of specific systems and equipment to your staff by March 4, 2019, for
the second RFI (i.e., Table RFI #2).
II. Additional Information Requested to be Available Prior to Inspection.
As stated above, in Section I. of this enclosure, the inspection team will examine the
returned documentation requested from Table RFI #1 and submit the list of specific
systems and equipment to your staff by March 4, 2019, for the second RFI (i.e., RFI #2).
The second RFI will request additional information required to evaluate the CSs/CDAs,
defensive architecture, and the areas of your stations CSP selected for the cyber-
security inspection. The additional information requested for the specific systems and
equipment is identified in Table RFI #2. All requested information shall follow the Table
RFI #2 and the guidance document referenced above.
The Table RFI #2 information shall be provided on CD to the lead inspector by April 1,
2019. Please provide four copies of each CD submitted (i.e., one for each
inspector/contractor). The preferred file format for all lists is a searchable Excel
spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate
ease of use. If you have any questions regarding this information, please call the
inspection team leader as soon as possible.
Table RFI #2
Section 3,
Paragraph Number/Title: Items
Plant Computer System Block Diagram (If Plant Computer System Is
5 All
Selected for Inspection)
Plant Security System Block Diagram (If Security Computer System Is
6 All
Selected for Inspection)
Systems That Are Distributed Block Diagrams (For Systems Selected
7 All
For Inspection)
Host-Based Intrusion Detection System Documentation (For CDAs for 10.a.1)
10
Systems Selected for Inspection) 10.a.2)
List all Maintenance and Test Equipment Used On CDAs for Systems
13 All
Selected for Inspection
15 Configuration Management All
16.b.
16.c.1)
16 Supply Chain Management
16.c.5)
16.c.6)
17 Portable Media and Mobile Device Control All
18 Software Management All
20 Vendor Access and Monitoring All
21 Work Control All
22 Device Access and Key Control All
23 Password/Authenticator Policy All
24 User Account/Credential Policy All
3
CALVERT CLIFFS NUCLEAR POWER PLANT
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Table RFI #2
Section 3,
Paragraph Number/Title: Items
26 Corrective Actions Since Last NRC Inspection All
In addition to the above information please provide the following:
(1) The documented CSP assessment and analysis for each CDA in each of the
selected systems.
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in this enclosuresSection II., provide
the following RFI (i.e., Table 1ST Week Onsite) on a CD by April 29, 2019, the first day of
the inspection. All requested information shall follow the Table 1ST Week Onsite and the
guidance document referenced above.
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. The
CD should be indexed and hyper-linked to facilitate ease of use. If you have any
questions regarding this information, please call the inspection team leader as soon as
possible.
Table 1ST Week Onsite
Section 3,
Paragraph Number/Title: Items
10.a.3)
Host-Based Intrusion Detection System Documentation for CDAs
10 thru
for systems selected for inspection
10.a.12)
11.a.3)
NIDS Documentation for Critical Systems That Have CDAs
11 thru
Associated with Them
11.a.15)
12.a.3)
SIEM Documentation for Critical Systems That Have CDAs
12 thru
Associated with Them
12.a.14)
16.c.2)
16 Supply Chain Management 16.c.3)
16.c.4)
19 Cyber Security Event Notifications All
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access
to them:
a. Original Final Safety Analysis Report Volumes;
b. Original Safety Evaluation Report and Supplements;
4
CALVERT CLIFFS NUCLEAR POWER PLANT
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
c. Final Safety Analysis Report Question and Answers;
d. Quality Assurance (QA) Plan;
e. Latest Individual Plant Examination for External Events / Probabilistic Risk
Assessment Report; and
f. Vendor Manuals.
(2) Assessment and Corrective Actions:
a. The most recent Cyber Security QA audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generated as a result of the most recent Cyber Security
QA audit and/or self-assessment.
IV. Information Requested To Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and
the status/resolution of the information requested (provided daily during the
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
5