November 14, 2022
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -
EMERGENCY PREPAREDNESS INSPECTION REPORT 05000317/2022501 AND 05000318/2022501
Dear David Rhoades:
On October 13, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Calvert Cliffs Nuclear Power Plant and discussed the results of this inspection with Patrick D.
Navin and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security
Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000317 and 05000318
License Numbers:
Report Numbers:
05000317/2022501 and 05000318/2022501
Enterprise Identifier: I-2022-501-0012
Licensee:
Constellation Energy Generation, LLC
Facility:
Calvert Cliffs Nuclear Power Plant
Location:
Lusby, MD
Inspection Dates:
October 10, 2022 to October 13, 2022
Inspectors:
J. Ambrosini, Senior Emergency Preparedness Inspector
J. Lilliendahl, Senior Emergency Response Coordinator
J. Schoppy, Senior Reactor Inspector
S. Seeley, Regional Agreement State Program Officer
Approved By:
Daniel L. Schroeder, Chief
Security, Emergency Preparedness, and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Calvert Cliffs Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise. The exercise scenario simulated a loss of offsite power following a solar magnetic disturbance and an emergency diesel generator failure which resulted in the loss of all onsite and offsite power sources to the emergency buses that could not be restored in less than four hours.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.
- 21-41, EP-AA-1011 Addendum 3, Calvert Cliffs Nuclear Power Plant Emergency Action Levels, Revision 7
- 21-68, EP-AA-1011 Addendum 3, Calvert Cliffs Nuclear Power Plant Emergency Action Levels, Revision 8
- 22-25, Calvert Cliffs Nuclear Power Plan Intake Bay Level Instrument Upgrade ECP-20-000448 Evaluation, Revision 0
- 22-45, EP-CA-124-F-17, CCNP B.5.B Pump and Auxiliary Equipment, Revision B2222EP-AA-1011 Addendum 3 EP-AA-1011 Addendum 3
This evaluation does not constitute NRC approval.
71114.08 - Exercise Evaluation - Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on August 4,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12)===
- (1) July 1, 2021 through June 30, 2022
EP02: Emergency Response Organization Drill Participation (IP Section 02.13) (1 Sample)
- (1) July 1, 2021 through June 30, 2022
EP03: Alert And Notification System Reliability (IP Section 02.14) (1 Sample)
- (1) July 1, 2021 through June 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 13, 2022, the inspectors presented the emergency preparedness inspection results to Patrick D. Navin and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Calvert Cliffs Nuclear Power Plant 2022 Emergency
Preparedness Biennial Exercise Scenario
07/14/2022
Exelon Nuclear Standardized Radiological Emergency Plan
Revision 33
Exelon Nuclear Radiological Emergency Plan Annex for
Calvert Cliffs Station
Revision 5