MONTHYEARIR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) IR 05000317/20220062023-03-0101 March 2023 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2022006 and 05000318/2022006) ML23047A1022023-02-16016 February 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000317/2023401 and 05000318/2023401 ML23040A0102023-02-0909 February 2023 Notification of Commercial Grade Dedication Inspection (05000317/2023012 and 05000318/2023012) and Request for Information IR 05000317/20220052022-08-31031 August 2022 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2022005 and 05000318/2022005) ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection IR 05000317/20210062022-03-0202 March 2022 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2021006 and 05000318/2021006) IR 05000317/20210052021-09-0101 September 2021 Updated Inspection Plan for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2021005 and 05000318/2021005) ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request IR 05000317/20200062021-03-0303 March 2021 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2020006 and 05000318/2020006) ML21053A3142021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 IR 05000317/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000317/2020005 and 05000318/2020005) ML20154K4602020-06-0202 June 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000317/2020011 and 05000318/2020011 IR 05000317/20190062020-03-0303 March 2020 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2019006 and 05000318/2019006) IR 05000317/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000317/2019005 and 05000318/2019005) ML19141A1242019-05-21021 May 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000317/20180062019-03-0404 March 2019 Annual Assessment Letter for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2018006 and 05000318/2018006) ML18348A4812018-12-13013 December 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000317/2019403 and 05000318/2019403 IR 05000317/20180052018-08-28028 August 2018 Updated Inspection Plan: Inspection Report 05000317/2018005 and 05000318/2018005 IR 05000317/20170062018-02-28028 February 2018 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2017006 and 05000318/2017006, Report 05000317/2017402 and 05000318/2017402, Report 05000317/2017501 and 05000318/2017501) IR 05000317/20170052017-08-28028 August 2017 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Inspection Report 05000317/2017005 and 05000318/2017005 IR 05000317/20160062017-03-0101 March 2017 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2016006 and 05000318/2016006) IR 05000317/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Report 05000317/2016005 and 05000318/2016005 IR 05000317/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2015006 and 05000318/2015006) IR 05000317/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2015005 and 05000318/2015005) IR 05000317/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, (Report 05000317/2014001 and 05000318/2014001)(w/Inspection Plan) IR 05000317/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-14-006 and 05000318-14-006) ML14206A9932014-07-25025 July 2014 Conrete Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNPP-CHLE-010, Revision 1 IR 05000317/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2013001 and 05000318/2013001) (W/Inspection Plan) ML13267A0052013-09-23023 September 2013 Requal Program Inspection 60 Day Letter IR 05000317/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-13-006 and 05000318-13-006) IR 05000317/20120012013-03-0404 March 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 & 2 (Report 05000317-12-001 and 05000318-12-001) ML12244A2032012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20110012012-03-0505 March 2012 Annual Assessment Letter(Report 05000317/2011001 and 05000318/2011001) ML1124208652011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20100012011-03-0404 March 2011 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant-05000317/2010001 and 05000318/2010001 ML1031402312010-11-10010 November 2010 Pre-Inspection Cover Sheet and Inspection Plan (12/6/10 - 12/10/10) ML1024402082010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Calvert Cliffs Nuclear Power Plant ML1016600082010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/7 - 6/11/10) ML1006208092010-03-0303 March 2010 Annual Assessment Letter ML0924402772009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant, Dated 09/01/2009 IR 05000317/20090012009-03-0404 March 2009 IR 05000317-09-001 and 05000318-09-001, on 01/01/2009 - 12/31/2008, Calvert Cliffs Nuclear Power Plant Annual Assessment Report IR 05000317/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Calvert Cliffs, (IR 05000317-08-001 and 05000318-08-001) ML0806100132008-03-0303 March 2008 (05000317-08-001, 05000318-08-001, )Annual Assessment Letter EOC 2007 ROP8 ML0734707242007-12-13013 December 2007 ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant ML0724309302007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant IR 05000317/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Calvert Cliffs Station (IR 05000317-07-001 and 05000318-07-001) ML0624304482006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant ML0606203372006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Calvert Cliffs Nuclear Power Plant (Report 05-317/2006001 and 05-318/2006001) ML0524206942005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Calvert Cliffs 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSlA. PA 19406-1415 September 1, 201,L Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Constellation Energy Nuclear Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 -47 02
SUBJECT:
MID-CYCLE PERFORMANCE REVIEWAND ]NSPECTION PLAN .
CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 0500031 7 t201 1006 AND 0500031 8/201 1 006
Dear Mr. Gellrich:
On August 10,2011, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Calvert Cliffs Nuclear Power Plant (CCNPP) Units 1 and 2. The NRb reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actionsfrom July 1 , 2010, through June 30, 2011. This letter iniorms you of the NRC's assessment of your facility during this period and its plans for future inspections at yo_ur facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined the performance at CCNPP Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROp)
Action Matrix because all inspection findings had very low (i.e., green) satety significance, and all Pls indicated that your performance was within the nominal, expected rangeli.e., green). On March 18, 2011, the NRC completed a supplemental inspection for an emergency dielel generator White finding at Calvert Clitfs Unit 2 and determined that Constettition appropriately addressed the root and contributing causes, extent of condition and corrective actions. The White finding was removed from the assessment process resulting in Calvert Cliffs Unit 2 transitioning from the Regulatory Response Column to the Licensee Response Column of the NRC's Action Matrix. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31,2012.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection pian should circumstances warrant any changes.
G. Gellrich ln the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task foroe to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of SBvere Accident Management Guidelines (SAMGS)" at your facility. Results of these inspections can be found here:
http://www.nrc.govliapanliapan-activities.html, Additionally, on May 1 1, 2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategie$," to confirm compliance with Order EA 026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in itF report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currentlyq reviewing the Task Force's recommendations to determine what additional actions may be warranted.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in thQ NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://wvri,v.nrc,qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Please contact Glenn Dentel at (610) 337-5233 with any questions you have regarding this letter.
Divisioqr of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69
Enclosure:
Calvert Cliffs lnspection / Activity Plan cc Mencl: Distribution via ListServ
G. Gellrich In the days following the Fukushima Daiichi nuclea;'accident in Japan, the Commission directed the staff to establish a senior-level agency task forqe to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. tne runC has since compteteb Temporary llstruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," ind Tl-]_81 'Availability and Readiness Inspection of Sgvere Accident Management Guidelines (sAMGs)" at your facility. Results of these inspections can be found here:
!!1Pfi4ryt.lrc.q,ov/iapan/iapan-activities.html. Additionally, on May 1 1,2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategies," to confirm compliance with Order fn-OZ-026, subsequently imposed license conditions, and,10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Neactol Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Forceis recommendations to determine what additional actigns may be warranted.
ln accordance with 10 CFR 2.390 of the NRC's "Rtrles of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-im/adams.html (the public Electronic Reading Room).
Please contact Glenn Dentel at (610) 337-5233 with any questions you have regarding this letter.
Sincerely,
/RN Darrell jf. Roberts, Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69
Enclosure:
Calvert Cliffs lnspection / Activity Plan Distribution Mencl: (via E-mail)
W. Dean, RA J. Hawkins, DRP N. McNamara, SLO D. Lew. DRA K. Cronk. DRP r D. Tifft. SLO D. Roberts, DRP N. Floyd, DRP RidsNrrPMCalvertCliffs Resource J. Clifford, DRP S. Kennedy, DRP, SRI RidsNrrDorlLpl 1 -1 Resource C. Milter, DRS E. Torres, Rl ROPassessment Resource P. Wilson, DRS DRS Branch Chiefs (6) ROPreportsResource J. McHale, Rl OEDO D. Screnci, PAO l RidsNrrDirslpab@nrc G. Dentel, DRP N. Sheehan, PAO N. Perry, DRP R. Barkley, ORA SUNSI Review Complete: QfQ (Reviewer's Initials)
DOCUMENT NAME: S:\ROP.l2 Mid-Cycle ReviewlBranch 1\CC ttlC l_fn 2Oli.docx Ater declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" Copy with
=
attachmenuenclosure "N" = No copy
Page 1 of 2 Calvert Cliffs 0812912011 15:30:0'l Inspection / Activity Plan Report 22 07101t2011 - 1213112012 Unit No. of Staff Number on Site 7111117 . PERMANENT PLANT MODIFICATIONS 1,2 0612712011 0710112011 lp 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1,2 07t11t2011 0711512011 lp 7 j11117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 71124.07 - REMP 1,2 07t11t201'l 0711512011 tP 71124.07 Radiological Environmental Monitoring Program
'l 0711112011 0711512011 rP 71151-PRo1 RETS/ODCM Radiological Effluent 7'1124.01 . RAD HAZARD ASSESS, ALARA, AIR, DOSE 1,2 0812912011 09/02/201 1 tP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1,2 081291201',! 0910212011 tP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 08t29t2011 09t0212011 tP 71124.02 Occupational ALARA Planning and Controls 1,2 08!2912011 09t0212011 lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1,2 0812912011 4910212011 tP 71124.04 Occupational Dose Assessment
't,2 08t29t2011 09t0212011 lP 71124.05 Radiation Monitoring Instrumentation EP EX - EP EXERCISE INSPECTION 1,2 09t12t2011 0911612011 tP 71't140'l Exercise Evaluation 1,2 09t12t2011 0911612011 tP 7',t11404 Emergency Action Level and Emergency Plan Changes
't,2 09t12t2011 0911612011 rP 71r51-EP01 D!t!/Exercise Pgrformgnce 1,2 09t12t2011 0911612011 tP 71151-EP02 ERO Drill Participation 1,2 0911212011 0911612011 tP 71151-EP03 Alert & Notification System 711'1118 . REQUAL INSP W/ P/F RESULTS 1,2 11t14t2011 11t18t2011 lP 711 'l 11 1B Licensed Operator Requalification Program 711528 - Pr&R 1,2 10t2412011 1012812011 lP 711528 Problem ldentification and Resolution 1,2 11t14t2011 11t1812011 l? 711528 Problem ldentification and Resolution 71124.01 . RAD HAZARD ASSESS, ALARA 1,2 12t05t2011 12t09t2011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 12105t2011 12t09t201'l lP 71124.02 Occupational ALARA Planning and Controls I,Z 12t05t2011 12t09t2011 lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1,2 12t0512011 1210912011 lP 71124.04 Occupational Dose Assessment 1,2 12t0512011 12t0912011 lP 71124.05 Radiation Monitoring Instrumentation 2 1210512011 12t09t2011 lP 71151-OR01 OccupationalExposureControlEffectiveness 7111108P . Ul INSERVICE INSPECTION 1 02t13t2012 02t24t2012 lP 71 1 1 108P lnservice lnspection Activities - PWR fhis report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Calvert Cliffs 08,29t2011 15:30:01 Inspection I Activity Plan Report 22 07t01t2011 - 12t3112012 Unit No. of Staff Number on Site 71124 . RADIATION SAFETY NSPECTION 1,2 03t04t2012 03108t2012 tP 7',t124.02 Occupational ALARA Planning and Controls 1,2 03104t2012 03t08t2012 tP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation I,Z 0310412012 03t08t2012 tP 71124.04 Occupational Dose Assessm ent 8/13EXAM . CALVERT CLIFFS INITIAL EXAM 1 07t16t2012 07t20t2012 u01 849 FY12-CALVERT CLIFFS INITIAL OPEMTOR LICENSING EXAM 4
08113t2012 08t24t2012 u01849 FY12-CALVERT CLIFFS INITIAL OPEMTOR LICENSING EXAM 71124.05 . OCC RDA SAFETY.INSTRUMENTS 1,2 0510712012 05t11t2012 tP 7',t124.05 Radiation Monitoring nstrumentation I
7111121 . CDBI 1,2 0512112012 05125t20',!2 tP 7111121 Component Design Bases Inspection I,Z 06104t2012 06t08t2012 tP 7111121 Component Design Bases Inspection 1,2 ad1Bt2a12 46t22t2012 tP 7111121 Component Design Bases lnspection EP PROGR . EP PROGRAM INSPECTION 1,2 07130t2012 08/03/2012 lP 7111402 Alert and Notification System Testing 1,2 07t30t2012 08t03t2012 tP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1,2 07t3o!:291? 0q/032012 lP 7111404 Eqergercy AcJlon Lgve! an{ Emelgelcy Plan Chq19e5 I,Z 07t30t2012 08t03t2012 tP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies lhis reoort does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.