Mid-Cycle Performance Review and Inspection Plan 2011 - Calvert Cliffs Nuclear Power Plant Units 1 and 2
ML112420865
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/01/2011
From: Darrell Roberts
Reactor Projects Branch 1
To: George Gellrich
Constellation Energy Nuclear Group, Calvert Cliffs
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
IR-11-006
Download: ML112420865 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSlA. PA 19406-1415 September 1, 201,L Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Constellation Energy Nuclear Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 -47 02

SUBJECT:

MID-CYCLE PERFORMANCE REVIEWAND ]NSPECTION PLAN .

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 0500031 7 t201 1006 AND 0500031 8/201 1 006

Dear Mr. Gellrich:

On August 10,2011, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Calvert Cliffs Nuclear Power Plant (CCNPP) Units 1 and 2. The NRb reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actionsfrom July 1 , 2010, through June 30, 2011. This letter iniorms you of the NRC's assessment of your facility during this period and its plans for future inspections at yo_ur facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at CCNPP Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROp)

Action Matrix because all inspection findings had very low (i.e., green) satety significance, and all Pls indicated that your performance was within the nominal, expected rangeli.e., green). On March 18, 2011, the NRC completed a supplemental inspection for an emergency dielel generator White finding at Calvert Clitfs Unit 2 and determined that Constettition appropriately addressed the root and contributing causes, extent of condition and corrective actions. The White finding was removed from the assessment process resulting in Calvert Cliffs Unit 2 transitioning from the Regulatory Response Column to the Licensee Response Column of the NRC's Action Matrix. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31,2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection pian should circumstances warrant any changes.

G. Gellrich ln the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task foroe to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of SBvere Accident Management Guidelines (SAMGS)" at your facility. Results of these inspections can be found here:

http://www.nrc.govliapanliapan-activities.html, Additionally, on May 1 1, 2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategie$," to confirm compliance with Order EA 026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in itF report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currentlyq reviewing the Task Force's recommendations to determine what additional actions may be warranted.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in thQ NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://wvri,v.nrc,qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Please contact Glenn Dentel at (610) 337-5233 with any questions you have regarding this letter.

Divisioqr of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69

Enclosure:

Calvert Cliffs lnspection / Activity Plan cc Mencl: Distribution via ListServ

G. Gellrich In the days following the Fukushima Daiichi nuclea;'accident in Japan, the Commission directed the staff to establish a senior-level agency task forqe to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. tne runC has since compteteb Temporary llstruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," ind Tl-]_81 'Availability and Readiness Inspection of Sgvere Accident Management Guidelines (sAMGs)" at your facility. Results of these inspections can be found here:

!!1Pfi4ryt.lrc.q,ov/iapan/iapan-activities.html. Additionally, on May 1 1,2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategies," to confirm compliance with Order fn-OZ-026, subsequently imposed license conditions, and,10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Neactol Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Forceis recommendations to determine what additional actigns may be warranted.

ln accordance with 10 CFR 2.390 of the NRC's "Rtrles of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-im/adams.html (the public Electronic Reading Room).

Please contact Glenn Dentel at (610) 337-5233 with any questions you have regarding this letter.

Sincerely,

/RN Darrell jf. Roberts, Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69

Enclosure:

Calvert Cliffs lnspection / Activity Plan Distribution Mencl: (via E-mail)

W. Dean, RA J. Hawkins, DRP N. McNamara, SLO D. Lew. DRA K. Cronk. DRP r D. Tifft. SLO D. Roberts, DRP N. Floyd, DRP RidsNrrPMCalvertCliffs Resource J. Clifford, DRP S. Kennedy, DRP, SRI RidsNrrDorlLpl 1 -1 Resource C. Milter, DRS E. Torres, Rl ROPassessment Resource P. Wilson, DRS DRS Branch Chiefs (6) ROPreportsResource J. McHale, Rl OEDO D. Screnci, PAO l RidsNrrDirslpab@nrc G. Dentel, DRP N. Sheehan, PAO N. Perry, DRP R. Barkley, ORA SUNSI Review Complete: QfQ (Reviewer's Initials)

DOCUMENT NAME: S:\ROP.l2 Mid-Cycle ReviewlBranch 1\CC ttlC l_fn 2Oli.docx Ater declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" Copy with

=

attachmenuenclosure "N" = No copy

Page 1 of 2 Calvert Cliffs 0812912011 15:30:0'l Inspection / Activity Plan Report 22 07101t2011 - 1213112012 Unit No. of Staff Number on Site 7111117 . PERMANENT PLANT MODIFICATIONS 1,2 0612712011 0710112011 lp 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1,2 07t11t2011 0711512011 lp 7 j11117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 71124.07 - REMP 1,2 07t11t201'l 0711512011 tP 71124.07 Radiological Environmental Monitoring Program

'l 0711112011 0711512011 rP 71151-PRo1 RETS/ODCM Radiological Effluent 7'1124.01 . RAD HAZARD ASSESS, ALARA, AIR, DOSE 1,2 0812912011 09/02/201 1 tP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1,2 081291201',! 0910212011 tP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 08t29t2011 09t0212011 tP 71124.02 Occupational ALARA Planning and Controls 1,2 08!2912011 09t0212011 lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1,2 0812912011 4910212011 tP 71124.04 Occupational Dose Assessment

't,2 08t29t2011 09t0212011 lP 71124.05 Radiation Monitoring Instrumentation EP EX - EP EXERCISE INSPECTION 1,2 09t12t2011 0911612011 tP 71't140'l Exercise Evaluation 1,2 09t12t2011 0911612011 tP 7',t11404 Emergency Action Level and Emergency Plan Changes

't,2 09t12t2011 0911612011 rP 71r51-EP01 D!t!/Exercise Pgrformgnce 1,2 09t12t2011 0911612011 tP 71151-EP02 ERO Drill Participation 1,2 0911212011 0911612011 tP 71151-EP03 Alert & Notification System 711'1118 . REQUAL INSP W/ P/F RESULTS 1,2 11t14t2011 11t18t2011 lP 711 'l 11 1B Licensed Operator Requalification Program 711528 - Pr&R 1,2 10t2412011 1012812011 lP 711528 Problem ldentification and Resolution 1,2 11t14t2011 11t1812011 l? 711528 Problem ldentification and Resolution 71124.01 . RAD HAZARD ASSESS, ALARA 1,2 12t05t2011 12t09t2011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 12105t2011 12t09t201'l lP 71124.02 Occupational ALARA Planning and Controls I,Z 12t05t2011 12t09t2011 lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1,2 12t0512011 1210912011 lP 71124.04 Occupational Dose Assessment 1,2 12t0512011 12t0912011 lP 71124.05 Radiation Monitoring Instrumentation 2 1210512011 12t09t2011 lP 71151-OR01 OccupationalExposureControlEffectiveness 7111108P . Ul INSERVICE INSPECTION 1 02t13t2012 02t24t2012 lP 71 1 1 108P lnservice lnspection Activities - PWR fhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 08,29t2011 15:30:01 Inspection I Activity Plan Report 22 07t01t2011 - 12t3112012 Unit No. of Staff Number on Site 71124 . RADIATION SAFETY NSPECTION 1,2 03t04t2012 03108t2012 tP 7',t124.02 Occupational ALARA Planning and Controls 1,2 03104t2012 03t08t2012 tP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation I,Z 0310412012 03t08t2012 tP 71124.04 Occupational Dose Assessm ent 8/13EXAM . CALVERT CLIFFS INITIAL EXAM 1 07t16t2012 07t20t2012 u01 849 FY12-CALVERT CLIFFS INITIAL OPEMTOR LICENSING EXAM 4

08113t2012 08t24t2012 u01849 FY12-CALVERT CLIFFS INITIAL OPEMTOR LICENSING EXAM 71124.05 . OCC RDA SAFETY.INSTRUMENTS 1,2 0510712012 05t11t2012 tP 7',t124.05 Radiation Monitoring nstrumentation I

7111121 . CDBI 1,2 0512112012 05125t20',!2 tP 7111121 Component Design Bases Inspection I,Z 06104t2012 06t08t2012 tP 7111121 Component Design Bases Inspection 1,2 ad1Bt2a12 46t22t2012 tP 7111121 Component Design Bases lnspection EP PROGR . EP PROGRAM INSPECTION 1,2 07130t2012 08/03/2012 lP 7111402 Alert and Notification System Testing 1,2 07t30t2012 08t03t2012 tP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1,2 07t3o!:291? 0q/032012 lP 7111404 Eqergercy AcJlon Lgve! an{ Emelgelcy Plan Chq19e5 I,Z 07t30t2012 08t03t2012 tP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies lhis reoort does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.