UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CALVERT CLIFFS NUCLEAR POWER PLANT

Dear Mr. Spina:

On August 12, 2009, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant (CCNPP). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Calvert Cliffs Units 1 and 2 was within the Regulatory Response column of the NRCs Action Matrix, based on one finding having low to moderate safety significance (White). This finding involved CCNPPs emergency action level tables fission product barrier matrix being incorrect resulting in a degraded risk significant planning standard function. In August 2009, we were notified by your staff that you will be ready for the NRC to conduct a supplemental inspection after November 2, 2009, to review the actions taken to address the White finding.

Based on our current assessment of performance for Calvert Cliffs Units 1 and 2, we plan to conduct, in addition to the reactor oversight process (ROP) baseline inspections at your facility, a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, and will inform you of the inspection dates once it is scheduled.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. In addition to the 95001 supplemental inspection and the baseline inspections, we plan on conducting an independent spent fuel storage installation

J. Spina 2 (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the ROP. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James W. Clifford, Acting Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DRP-53, DRP-69

Enclosure:

Calvert Cliffs Nuclear Power Plant Inspection/ Activity Plan cc w/ encl.:

M. Wallace, Vice-Chairman, Constellation Energy H. Barron, President, CEO, & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC W. Parran, President, Calvert County Board of Commissioners C. Fleming, Esquire, Sr. Counsel - Nuclear Generation Group, LLC J. Gaines, Director, Licensing, Calvert Cliffs Nuclear Power Plant S. Gray, Program Manager, Power Plant Assessment Program, Maryland Department of Natural Resources K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center L. Larragoite, Manager, Nuclear Safety and Security, Calvert Cliffs Nuclear Power Plant G. Detter, Manager, Nuclear Safety and Security, Constellation Energy M. Griffen, Maryland Department of the Environment Chesapeake Safe Energy Coalition S. Pattison, SLO (2)

J. Spina 2 (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the ROP. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James W. Clifford, Acting Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DRP-53, DRP-69 Distribution:

S. Collins, RA D. Screnci, ORA J. Hawkins, DRP M. Dapas, DRA N. Sheehan, ORA S. Kennedy, DRP, SRI D. Lew, DRP R. Barkley, ORA M. Davis, DRP, RI J. Clifford, DRP L. Trocine, RI OEDO C. Newgent, DRP, OA D. Roberts, DRS R. Nelson, NRR D. Bearde, DRP P. Wilson, DRS D V. Pickett, PM, NRR Region I Docket Room DRS Branch Chiefs A. Muniz, PM, NRR ROPreports Resource L. Scholl, DRS G. Dentel, DRP RidsNrrDirsIpab@nrc.gov D. Silk, DRS N. Perry, DRP SUNSI Review Complete: nsp* (Reviewer=s Initials)

DOCUMENT NAME: S:\ROP-10 Mid-Cycle Review\Branch 1\CC MidCycle Ltr 09.doc ML092440277 After declaring this document AAn Official Agency Record@ it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME NPerry/nsp* GDentel/gtd* JClifford/jwc DATE 08/21/09 08/24/09 09/01/09

  • See prior concurrence OFFICIAL RECORD COPY

J. Spina 2 Page 1 of 2 Calvert Cliffs 09/01/2009 10:39:57 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111121 - CDBI 6 1, 2 08/03/2009 08/07/2009 IP 7111121 Component Design Bases Inspection 1, 2 08/17/2009 08/21/2009 IP 7111121 Component Design Bases Inspection 1, 2 08/24/2009 08/28/2009 IP 7111121 Component Design Bases Inspection 7112203 - PUB RAD SAFETY - REMP 1 1, 2 08/03/2009 08/07/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 08/03/2009 08/07/2009 IP 71151-PR01 RETS/ODCM Radiological Effluent 7111111B - BIENNIAL REQUAL INSP WITH P/F RESULTS 3 1, 2 11/16/2009 11/20/2009 IP 7111111B Licensed Operator Requalification Program EP EXER - EP EXERCISE INSPECTION 3 1, 2 10/18/2009 10/24/2009 IP 7111401 Exercise Evaluation 1, 2 10/18/2009 10/24/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/18/2009 10/24/2009 IP 71151-EP01 Drill/Exercise Performance 1, 2 10/18/2009 10/24/2009 IP 71151-EP02 ERO Drill Participation 1, 2 10/18/2009 10/24/2009 IP 71151-EP03 Alert & Notification System 71152B - PI&R BIENNIAL TEAM 4 1, 2 11/02/2009 11/06/2009 IP 71152B Identification and Resolution of Problems 1, 2 11/16/2009 11/20/2009 IP 71152B Identification and Resolution of Problems 71121 - OCC RAD SAFETY 1 1, 2 12/07/2009 12/11/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 12/07/2009 12/11/2009 IP 7112102 ALARA Planning and Controls 1, 2 12/07/2009 12/11/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 12/07/2009 12/11/2009 IP 71151-OR01 Occupational Exposure Control Effectiveness TI-177 - MANAGING GAS ACCUMULATION IN ECCS 5 1, 2 01/11/2010 01/15/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71121 - OCC RADIATION SAFETY 1 1, 2 01/25/2010 01/29/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 01/25/2010 01/29/2010 IP 7112102-7112102R ALARA - Required 71121 - OCC RADIATION SAFETY 1 1, 2 03/01/2010 03/05/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/01/2010 03/05/2010 IP 7112102 ALARA Planning and Controls 1, 2 03/01/2010 03/05/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 7111108P - UNIT 1 INSERVICE INSPECTION 1 1 03/01/2010 03/12/2010 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 09/01/2009 10:39:57 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI-172 - U1 TI 2515/172 DISSIMILAR METAL WELDS 1 1 03/01/2010 03/12/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 8/2EXAM - OPERATOR LICENSING INITIAL EXAMS 4 1 06/28/2010 07/02/2010 U01770 FY10 - CALVERT CLIFFS UNIT 1&2 INITIAL OPERATOR LICENSING EXAM 1 08/02/2010 08/13/2010 U01770 FY10 - CALVERT CLIFFS UNIT 1&2 INITIAL OPERATOR LICENSING EXAM 71121.03 - RAD MONITORING INSTRUMENTS 1 1, 2 05/03/2010 05/07/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 71122.01 - RAD GAS & LIQ EFFLUENTS SYSTEM 1 1, 2 06/07/2010 06/11/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 2515/173 - INDUSTRY GROUND WATER INITIATIVE 1 1, 2 06/07/2010 06/11/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative ISFSI - ISFSI LOADING CAMPAIGN 1 1, 2 07/12/2010 07/16/2010 IP 60855 Operation Of An ISFSI 1, 2 07/12/2010 07/16/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EP PROGR - EP PROGRAM INSPECTION 1 1, 2 08/02/2010 08/06/2010 IP 7111402 Alert and Notification System Testing 1, 2 08/02/2010 08/06/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 08/02/2010 08/06/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/02/2010 08/06/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/02/2010 08/06/2010 IP 71151 Performance Indicator Verification TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1, 2 11/15/2010 11/19/2010 IP 7111105T Fire Protection [Triennial]

1, 2 11/29/2010 12/03/2010 IP 7111105T Fire Protection [Triennial]

71121 - OCC RAD SAFETY - ACCESS/ALARA & ISFSI 1 1, 2 12/06/2010 12/10/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1, 2 12/06/2010 12/10/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 12/06/2010 12/10/2010 IP 7112102 ALARA Planning and Controls 1, 2 12/06/2010 12/10/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.