UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 2, 2006 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
SUBJECT:
ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORT 05000317/2006001 AND 05000318/2006001)
Dear Mr. Spina:
On February 8, 2006, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.
Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
While plant performance at Unit 2 for the most recent quarter is within the Licensee Response column of the Action Matrix, there was an inspection finding that resulted in this unit being within the Regulatory Response column through the first quarter 2005. The finding was of low to moderate safety significance (White) in the Mitigating Systems cornerstone, and involved a relay failure that caused the steam dump valves to remain full open following a reactor trip in January 2004. An NRC Supplemental Inspection, conducted in January 2005, determined that the root causes for the performance deficiencies were understood and that completed and planned corrective actions were reasonable to address the related causes.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2007. Planned inspections include reactor vessel head replacement inspections at both units and an independent spent fuel storage installation inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections
2 J. Spina in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Brian McDermott at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Brian E. Holian, Director Division of Reactor Projects, Region 1 Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69
Enclosure:
Calvert Cliffs Inspection/ Activity Plan cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)
3 J. Spina Distribution w/encl:
(via E-mail)
S. Collins, RA M. Dapas, DRA B. Holian, DRP A. Blough, DRS D. Lew, DRP M. Gamberoni, DRS B. Sosa, RI OEDO R. Laufer, NRR P. Milano, PM, NRR R. Guzman, PM, NRR (Backup)
J. Trapp, DRP C. Khan, DRP M. Giles, DRP, Senior Resident Inspector C. Newgent - Resident OA D. Screnci, ORA N. Sheehan, ORA DRS Branch Chiefs (5)
Institute of Nuclear Power Operations (INPO)
RidsNrrDirsIpab@nrc.gov ROPreports@nrc.gov (All IRs)
Region I Docket Room (with concurrences)
DOCUMENT NAME: S:\\ROP-6 EOC Review\\ROP-6 Annual Assessment Letters\\CC EOC.wpd SISP Review Complete: JMT (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME CKhan/JMT for JTrapp/JMT BHolian/BEH DATE 02/28/06 02/28/06 03/01/06 OFFICIAL RECORD COPY
Calvert Cliffs Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/01/2006 12:49:38 Report 22 2
71007
- U1 REACTOR VESSEL HEAD REPLACEMENT Other Routine 01/09/2006 04/30/2006 1
71007 IP Reactor Vessel Head Replacement Inspection Baseline Inspections 03/06/2006 03/08/2006 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 03/06/2006 03/08/2006 1
7111117B IP Permanent Plant Modifications Other Routine 03/10/2006 03/24/2006 1
71007 IP Reactor Vessel Head Replacement Inspection 1
71121
- OCC RADIATION SAFETY Other Routine 02/27/2006 03/03/2006 1
71007 IP Reactor Vessel Head Replacement Inspection Baseline Inspections 02/27/2006 03/03/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/27/2006 03/03/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 02/27/2006 03/03/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/27/2006 03/03/2006 1
71151 IP Performance Indicator Verification 2
7111108P
- INSERVICE INSPECTION - UNIT 1 Baseline Inspections 02/27/2006 03/03/2006 1
7111108P IP Inservice Inspection Activities - PWR Safety Issues 03/06/2006 03/10/2006 1
2515/160 IP Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
Baseline Inspections 03/13/2006 03/17/2006 1
7111108P IP Inservice Inspection Activities - PWR 3
8/28 EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 07/24/2006 07/28/2006 1
U01585 CALVERT CLIFFS INITIAL EXAM (3/06)
Not Applicable 08/28/2006 09/01/2006 1
U01585 CALVERT CLIFFS INITIAL EXAM (3/06) 1 71121
- OCC RAD SAFETY Baseline Inspections 04/17/2006 04/21/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/17/2006 04/21/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 04/17/2006 04/21/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 04/17/2006 04/21/2006 2
71151 IP Performance Indicator Verification 2
- ISFSI Other Routine 05/01/2006 08/31/2006 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 8
7111121
- CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/31/2006 08/04/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 08/14/2006 08/18/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 08/21/2006 08/25/2006 1, 2 7111121 IP Component Design Bases Inspection 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/31/2006 08/04/2006 1
71151 IP Performance Indicator Verification 1
71121
- OCC RAD SAFETY Baseline Inspections 09/11/2006 09/15/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/01/2006 12:49:38 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections 09/11/2006 09/15/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 09/11/2006 09/15/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 09/11/2006 09/15/2006 2
71151 IP Performance Indicator Verification 1
71007
- U2 RX VESSEL HEAD REPLACEMENT Other Routine 01/01/2007 04/10/2007 2
71007 IP Reactor Vessel Head Replacement Inspection 1
71114
- EP PRGM INSP & PI VERFICATION Baseline Inspections 11/27/2006 12/01/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 11/27/2006 12/01/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 11/27/2006 12/01/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 11/27/2006 12/01/2006 1, 2 71151 IP Performance Indicator Verification 1
71121
- OCC RAD SAFETY Baseline Inspections 01/15/2007 01/19/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/15/2007 01/19/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 01/15/2007 01/19/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/15/2007 01/19/2007 1
71151 IP Performance Indicator Verification 1
71121
- OCC RAD PROT Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/05/2007 03/09/2007 2
71151 IP Performance Indicator Verification 1
7111108P
- IN SERVICE INSPECTION Baseline Inspections 03/05/2007 03/16/2007 2
7111108P IP Inservice Inspection Activities - PWR 3
MODS
- MODS & 50.59 Baseline Inspections 04/16/2007 04/20/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 04/16/2007 04/20/2007 1, 2 7111117B IP Permanent Plant Modifications 1
7112202
- PUB RAD SAFETY - RETS Baseline Inspections 05/28/2007 06/01/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 05/28/2007 06/01/2007 1
71151 IP Performance Indicator Verification 3
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 06/25/2007 06/29/2007 1, 2 7111105T IP Fire Protection [Triennial]
1 71121
- OCC RAD SAFETY Baseline Inspections 08/06/2007 08/10/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/06/2007 08/10/2007 1, 2 7112102 IP ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/01/2006 12:49:38 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections 08/06/2007 08/10/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/06/2007 08/10/2007 2
71151 IP Performance Indicator Verification 4
- PI&R Baseline Inspections 08/27/2007 08/31/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 09/10/2007 09/14/2007 1, 2 71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.