Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-14-006 and 05000318-14-006)
ML14239A543
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/02/2014
From: Daniel Schroeder
Reactor Projects Branch 1
To: George Gellrich
Exelon Generation Co
Schroeder D
References
IR-2014-006
Download: ML14239A543 (6)


Text

ber 2, 2014

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2014006 AND 05000318/2014006)

Dear Mr. Gellrich:

On August 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of your Calvert Cliffs Nuclear Power Plant (Calvert Cliffs) Units 1 and 2.

The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Calvert Cliffs Nuclear Power Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Calvert Cliffs Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of a Preliminary White Finding for Unit 2, Inaccurate EAL Threshold Values Incorporated Into Site EAL Scheme Change,(Apparent Violation 05000318/2014003-02) contained in Inspection Report 05000317/2014003 and 05000318/2014003 issued on August 8, 2014. The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) IP 60855.1, Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants, and IP 71003, Post-Approval Site Inspection for License Renewal. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The onsite component at your site has been scheduled for the week of September 8, 2014. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML14239A543 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR DSchroeder/DLS DATE 08/26/14 08/26/14

Letter to George Gellrich from Daniel Schroeder dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2014006 AND 05000318/2014006)

Distribution w/encl: (via email)

W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS P. Krohn, DRS D. Schroeder, DRP A. Rosebrook, DRP R. Clagg, DRP, SRI E. Torres, DRP, RI C. Fragman, DRP, AA A. Bowers, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources A. Dimitriadis, DRS J. Noggle, DRS M. Gray, DRS C. Cahill, DRS J. Rogge, DRS D. Jackson, DRS D. Screnci, PAO, N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource

Page 1 of 2 Calvert Cliffs 08/27/2014 14:33:15 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 8/25EXAM - INITIAL OL EXAM 4 1 07/28/2014 08/01/2014 U01886 FY14-CALVERT CLIFFS INITIAL OPERATOR LICENSING EXAM 1 08/25/2014 09/04/2014 U01886 FY14-CALVERT CLIFFS INITIAL OPERATOR LICENSING EXAM 71003 - U1 LR COMMITMENTS PHASE 2 INSPEC 5 1 07/07/2014 07/11/2014 IP 71003 Post-Approval Site Inspection for License Renewal ISFSI - ISFSI LOADING INSPECTION 3 1, 2 08/18/2014 08/22/2014 IP 60855 Operation Of An ISFSI 1, 2 08/18/2014 08/22/2014 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants MODS - PERMANENT PLANT MODIFICATIONS 6 1, 2 09/22/2014 09/26/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 10/06/2014 10/10/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP PROGR - EP PROGRAM INSPECTION 1 1, 2 11/17/2014 11/21/2014 IP 7111402 Alert and Notification System Testing 1, 2 11/17/2014 11/21/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 11/17/2014 11/21/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - RADIATION SAFETY RAD INSTRUMENTS 1 1, 2 12/01/2014 12/05/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/01/2014 12/05/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/01/2014 12/05/2014 IP 71151-OR01 1, 2 12/01/2014 12/05/2014 IP 71151-PR01 71124 - RADIATION SAFETY INSPECTION - INSTRUMENT 1 1, 2 01/12/2015 01/16/2015 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RADIATION SAFETY INSPECTION 1 1, 2 02/16/2015 02/20/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 7111108P - U2 INSERVISE INSPECTION 1 2 02/23/2015 03/06/2015 IP 7111108P Inservice Inspection Activities - PWR 71124.08 - RADWASTE 1 1, 2 04/06/2015 04/10/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION SAFETY INSPECTION - ALARA 1 1, 2 04/27/2015 05/01/2015 IP 71124.02 Occupational ALARA Planning and Controls 71124 - RADIATION SAFETY INSPECTION - REMP 1 1, 2 06/22/2015 06/26/2015 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Calvert Cliffs 08/27/2014 14:33:15 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP EXERCISE 8 1, 2 09/14/2015 09/18/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1, 2 09/14/2015 09/18/2015 IP 7111408 Exercise Evaluation - Scenario Review PI&R - PI&R - BIENNIAL 1 1, 2 09/14/2015 09/18/2015 IP 71152B Problem Identification and Resolution 1, 2 09/28/2015 10/01/2015 IP 71152B Problem Identification and Resolution 7111111B - REQUAL INSP W/ P/F RESULTS 2 1, 2 11/16/2015 11/20/2015 IP 7111111B Licensed Operator Requalification Program 71124 - RADIATION SAFETY INSPECTION - DOSE 1 1, 2 11/02/2015 11/06/2015 IP 71124.04 Occupational Dose Assessment 1, 2 11/02/2015 11/06/2015 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASIS INSPECTION 7 1, 2 11/02/2015 11/06/2015 IP 7111121 Component Design Bases Inspection 1, 2 11/16/2015 11/20/2015 IP 7111121 Component Design Bases Inspection 1, 2 11/30/2015 12/04/2015 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure