ML24005A022
| ML24005A022 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/05/2024 |
| From: | Laura Smith Exelon Generation Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML24005A021 | List: |
| References | |
| TS 5.6.9 | |
| Download: ML24005A022 (1) | |
Text
Exelon Generation (~
January 5, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Larry D. Smith Manager-Regulatory Assurance Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5219 Office larry.smith2@constellat1on.com TS 5.6.9 Calvert Cliffs Nuclear Power Plant, Units No. 1 & No. 2 Renewed Facility Operating License Nos. DPR-53 & DPR-69 NRC Docket Nos. 50-317 & 50-318
Subject:
Revised Steam Generator Tube Inspection Reports
Reference:
- 1.
Calvert Cliffs Nuclear Power Plant Units 1 and 2 Technical Specification 5.6.9 The NRC approved a License Amendment Request to implement TSTF-577 for Calvert Cliffs Nuclear Power Plant. In accordance with that amendment request, Calvert Cliffs was required to submit revised Steam Generator Tube Inspection Reports within 60 days of implementation for Units 1 and 2. The amendment was implemented on November 15, 2023. In accordance with the revised Reference 1, Attachments ( 1) and (2) provide the 180-day report with the revised TS 5.6.9 reporting requirements for Unit 1 and Unit 2 respectively.
There are no regulatory commitments contained in this correspondence.
Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.
Respectfully, A~~
Larry D. Smith Regulatory Assurance Manager LDS/MJF/aj
Attachment:
(1)
(2)
Calvert Cliffs CC1 R25 Revised Steam Generator Tube Inspection Report Calvert Cliffs CC2R23 Revised Steam Generator Tube Inspection Report cc:
NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs S. Seaman, MD-DNR