ML20204G632: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:__ .        _ _ _ _ _ _ _
                                                  '
  s .; _ _ :s ., -                                                                                  ,
                                                                                                            ,
          a                                                                                        .
    :                                                                                              v
                                '
                                                              OCT 0 3 tggg .
                        >
                                                                                                          .
                          Docket Nos.-50-325 and 50-324
                          License Nos. DPR-71 and DPR-62
                  Jarolina Power. and Light Company                                                              .
            / ATTN: Mr. E. E. Utley
                                      Senior Executive Vice President
                                      Power Supply and Engineering                                                i
                                        and Construction                                                          '
-
    ,            'P. O. Box 1551
                          Raleigh, NC. 27602
                          Gentlemen:
                                                                                                                  ,
                          SUBJECT: NRC INSPECTION REPCRT NO. 50-325/88-29 AND 50-324/88-29
                          This refers to the Nuclear Regulatory Commission ~(NRC) inspection conducted by
                          William H. Ruland on August 8-31,.1988. The inspection included a review of
'
                  . activities' authorized for yo'ur Brunswick facility. At the conclusion of the
                            inspection, the findings were discussed with those members of your staff              ,.
                            identified in the enclosed inspection report.
                          Areas examined during the inspection are identified in the report. Within
                            these areas, the inspection consisted of selective examinations of procedures
                            and . representative records, interviews with personnel, and observation of
                            activities in progress.
                          Within the scope of the. inspection. no violations or deviations were                  ;
                              identified.
                                                                                                                  i
                            The enclosed Inspection Report documents an oral commitment (see paragraph 6.b)
,                          made by a licensee representative and discussed it, the exit interview. If your
                            understanding of this commitment differs from the report statements, please
                              inform this office promptly.
                                                                                                                  [
                              In ' accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,        ,
                            Title 10, Code of Federal Regulations, a copy of this letter and its enclosure        ;
                            will be placed in-the NRC Public Document Room.
                              Should you have any questions concerning this letter, please contact us.
                                                                        Sincerely,                                i
                                                                                                                  .
                                                                                                                  !
                                                                        David M. Verrelli, Chief
                                                                        Reactor Projects Branch 1                ;
                                                                        Division of Reactor Projects              j
                              Enclosure:  (See page 2)                                                          .
                                                                                                                  I
                                                                                                                  ?
          6910240193 881003
          PDR                  ADOCK Ot5000324                                                                  ,[
          Q                                PDC
                                                                                                              397
 
F
  ?'
    , ,
        '*.
  .
                                                    OCT 0 3 FAB
            Carolina Power and Light Company    2
,
            Enclosure:
            NRC Inspection Report                              ,,
            ej w/ encl:
            W. W. Howe, Vice President
                Brunswick Nuclear Project
          v 6. L. Harness, Plant General Manager
            State of North Carolina
            bec w/encis:
          vNRC Resident Inspector
            Document Control Desk                e
            RII            RII    g.
            RC  ro 1:tj    PFre-rickson
                                  /88
            g/2,/88            /$
}}
}}

Latest revision as of 17:27, 30 December 2020

Forwards Insp Repts 50-324/88-29 & 50-325/88-29 on 880808- 31.No Violations or Deviations Noted.Oral Commitment Made by Licensee Documented in Paragraph 6.b of Rept
ML20204G632
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/03/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20204G637 List:
References
NUDOCS 8810240193
Download: ML20204G632 (2)


See also: IR 05000324/1988029

Text

__ . _ _ _ _ _ _ _

'

s .; _ _ :s ., - ,

,

a .

v

'

OCT 0 3 tggg .

>

.

Docket Nos.-50-325 and 50-324

License Nos. DPR-71 and DPR-62

Jarolina Power. and Light Company .

/ ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering i

and Construction '

-

, 'P. O. Box 1551

Raleigh, NC. 27602

Gentlemen:

,

SUBJECT: NRC INSPECTION REPCRT NO. 50-325/88-29 AND 50-324/88-29

This refers to the Nuclear Regulatory Commission ~(NRC) inspection conducted by

William H. Ruland on August 8-31,.1988. The inspection included a review of

'

. activities' authorized for yo'ur Brunswick facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff ,.

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and . representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the. inspection. no violations or deviations were  ;

identified.

i

The enclosed Inspection Report documents an oral commitment (see paragraph 6.b)

, made by a licensee representative and discussed it, the exit interview. If your

understanding of this commitment differs from the report statements, please

inform this office promptly.

[

In ' accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, ,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure  ;

will be placed in-the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, i

.

!

David M. Verrelli, Chief

Reactor Projects Branch 1  ;

Division of Reactor Projects j

Enclosure: (See page 2) .

I

?

6910240193 881003

PDR ADOCK Ot5000324 ,[

Q PDC

397

F

?'

, ,

'*.

.

OCT 0 3 FAB

Carolina Power and Light Company 2

,

Enclosure:

NRC Inspection Report ,,

ej w/ encl:

W. W. Howe, Vice President

Brunswick Nuclear Project

v 6. L. Harness, Plant General Manager

State of North Carolina

bec w/encis:

vNRC Resident Inspector

Document Control Desk e

RII RII g.

RC ro 1:tj PFre-rickson

/88

g/2,/88 /$