ML20155K322: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:'
    3. .
  ~
                                            JUN 081988
                                                                              fM
          Docket Nos. 50-348, 50-364
          License Nos. NPF-2 and NPF-8
          A]abama Power Company
        MTTN: Mr. R. P. Mcdonald
                  Senior Vice President
          P. O. Box 2641
          Birminc:cm, AL 35291-0400
          Gentlemen:
          SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-16 AND 50-364/88-16
          The above subject inspection report was transmitted to you by letter dated
          May 19, 1988. As a result of a telephone conversation held between D. Jones of
          your staff and N. Merriweather of NRC, Region II, on June 6, 1988, it has come
          to our attention that Appendix A to the report:    1) incorrectly references        i
          ASCO solenoid valves N11SV3976A-B/B-B as normally energized valves during a          !
          design basis accident, 2) incorrectly identifies valve no. N23SV3227CA-A as
          N23SV3226CA-A, and 3) incorrectly identifies valve no B31SV0444BB-B as valve
          no. B31SV044aBA-A. The appendix has been revised with the above changes and is
          enclosed. ~ tease delete the superseded page and insert the corrected page in
          your copy of the report.
          Should you have any questions concerning this letter, please contact us.
                                                  Sincerely,
                                                  Alan R. Herdt, Chief                        ;
                                                  Engineering Branch
                                                  Division of Reactor Safety
          Enclosure-
          Corrected Appendix A to Inspection                                                    i
            Report Nos. 50-348/88-16 and                                                      I
              50-364/88-16
          cg w/ enc 1:
          M.)1. Guthrie, Executive Vice President
          V. D. Woodard, General Manager -
'
            AclearPlant
          W. G. Hairston, III, Vice President -
            fluclear Support
          W. W. McGowan, Wanager-Safety Audit                                                  1
              and Engineering Review
          d Fulmer, Supervisor-Safety
            Audit and Engineering Review
          bec w/ encl:    (Seepage 2)
4
                  8806210176 880600        :                                            i l
                  PDR  ADOCK 050003481
                  Q                  PDR ;                                                  f4
 
  .
    *
                                                                  JUN 081988
      Alabama Power Company          2
      bec w/ encl:
      $d Resident Inspector
      DRS Technical Assistant
      # Reeves, Project Manager NRR
      Document Control Desk
      State of Alabama
l
l
l
l
                                                                                l
                                                                                .
                                                                                l
                                                                                l
                                                                                l
      RII-  V                RII
      NMerriweather:gb        TConlon
      06/4/88                06/9/88
                                        _ _ _ _ _ _ _ _ - _ _ _ _    . _ _
                                                                              ,
}}
}}

Latest revision as of 02:24, 17 December 2020

Forwards Corrected App a to Insp Repts 50-348/88-16 & 50-364/88-16,per 880606 Telcon.Revised App Corrects Valve Number Identifications & Refs to Asco Solenoid Valves
ML20155K322
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/08/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20155K325 List:
References
NUDOCS 8806210176
Download: ML20155K322 (2)


See also: IR 05000348/1988016

Text

'

3. .

~

JUN 081988

fM

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

A]abama Power Company

MTTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birminc:cm, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-16 AND 50-364/88-16

The above subject inspection report was transmitted to you by letter dated

May 19, 1988. As a result of a telephone conversation held between D. Jones of

your staff and N. Merriweather of NRC, Region II, on June 6, 1988, it has come

to our attention that Appendix A to the report: 1) incorrectly references i

ASCO solenoid valves N11SV3976A-B/B-B as normally energized valves during a  !

design basis accident, 2) incorrectly identifies valve no. N23SV3227CA-A as

N23SV3226CA-A, and 3) incorrectly identifies valve no B31SV0444BB-B as valve

no. B31SV044aBA-A. The appendix has been revised with the above changes and is

enclosed. ~ tease delete the superseded page and insert the corrected page in

your copy of the report.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Alan R. Herdt, Chief  ;

Engineering Branch

Division of Reactor Safety

Enclosure-

Corrected Appendix A to Inspection i

Report Nos. 50-348/88-16 and I

50-364/88-16

cg w/ enc 1:

M.)1. Guthrie, Executive Vice President

V. D. Woodard, General Manager -

'

AclearPlant

W. G. Hairston, III, Vice President -

fluclear Support

W. W. McGowan, Wanager-Safety Audit 1

and Engineering Review

d Fulmer, Supervisor-Safety

Audit and Engineering Review

bec w/ encl: (Seepage 2)

4

8806210176 880600  : i l

PDR ADOCK 050003481

Q PDR ; f4

.

JUN 081988

Alabama Power Company 2

bec w/ encl:

$d Resident Inspector

DRS Technical Assistant

  1. Reeves, Project Manager NRR

Document Control Desk

State of Alabama

l

l

l

l

l

.

l

l

l

RII- V RII

NMerriweather:gb TConlon

06/4/88 06/9/88

_ _ _ _ _ _ _ _ - _ _ _ _ . _ _

,