ML20125A762: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:,
          h.
  *
                        e
                                                                                          lIs
                /'gaC,3      'o,                              UNITED STATES
              i j , ,.'-*/,/(' j                  NUCLEAR REGULATORY COMMISSION
                                                                  REGION 11
              -                  e
              'o,>k,'.          f                      tot naanitTTA ST es.w suefs 3100
                                                            ATL ADf7 A. GE ORCIA 30303
                g s .-.....f
          In Reply Refer To:                                    JUN 1 fr 1379
          RII:EHB
          50-348/79-19
                  Alabama Power Company
                  Atta:      F. L. Clayton, Jr.
                              Senior Vice President
                    Post Office Box 2641
                    Birmingham, Alabama 35291
                    Gentlemen:
                    This refers to the inspection conducted by E. H. Brooks of this office
                    on May 8-10, 1979 of activities authorized by NRC License No NPF-2 for
                    the Farley facility,IJnit 1, and to the discussion of our findings held
                    with J. Woodard at the conclusion of the inspection.
                                                                                                1
                    Areas examined during the inspection and our findings are discussed in
                    the enclosed inspection report. Within these areas, the inspection
                    consisted of selective examinations of procedures and representative
                    records, interviews with personnel, and observations by the inspector.
                    Within the scope of this inspection, no items of noncompliance were
                    disclosed.
                    In accordance with Section 2.790 of the NRC's " Rules of Practice",
                    Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
                    the enclosed inspection report will be placed in the NRC's Public
                    Document Room. If this report contains any information that you (or
                    your contractor) believe to be proprietary, it is necessary that you
                    make a written application within 20 days to this office to withhold
                    such information from public disclosure. Any such application must
                      include a full statement of the reasons on the basis of which it is
                      claimed that the information is proprietary, and should be prepared so
                      that proprietary information identified in the application is contained
                      in a separate part of the document. If we do not hear from you in this
                      regard within the specified period, the report will be placed in the
                      Public Docu.sent Room.
6
                                                                                              .#
                                                                                        f 90sWOFM
    . _ -  .
                  - .              .. ..    - - _
 
j  '\"
  .
  -
      Alabama Power Company                    -2-
                                                                          jut ! S G1
      Should you have any questions concerning this letter, we will be glad to
      discuss them with you.
                                          Sincerely,
                                          [.C.
                                          R. C.    was, Acting Chief
l                                        Reactor Operations and
                                            Nuclear Support Branch
      Enclosure:                                                                      i
      Inspection Report No. 50-348/79-19                                              l
      cc w/ enclosures:                                                              l
      A. R. Barton                                                                  !
      Executive Vice President                                                      !
,      Post Office Box 2641
      Birmingham, Alabama 35291
      J. T. Young
(      Vice President-Production
      Post Office Box 2641
      Birmingham, Alabama 35291                                                        l
      H. O. Thrash                '
      Manager-Nuclear Generation
      Post Office Box 2641
      Birmingham, Alabama 35291
      C. Biddinger, Jr.
      Manager-Corporate Quality Assurance
      Post Office Box 2641
      Birmingham, Alabama 35291
      W. G. Hairston III
        Plant Manager                                                                j
        Drawer 470                                                                  !
                                                                                    '
        Ashford, Alabama 36312
        R. E. Hollands, Jr.
        QA Supervisor
        Post Office Box U
        Ashford, Alabama 36312
}}
}}

Latest revision as of 03:43, 24 July 2020

Forwards IE Insp Rept 50-348/79-19 on 790508-10.No Noncompliance Noted
ML20125A762
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/19/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML20125A765 List:
References
NUDOCS 7908170226
Download: ML20125A762 (2)


See also: IR 05000348/1979019

Text

,

h.

e

lIs

/'gaC,3 'o, UNITED STATES

i j , ,.'-*/,/(' j NUCLEAR REGULATORY COMMISSION

REGION 11

- e

'o,>k,'. f tot naanitTTA ST es.w suefs 3100

ATL ADf7 A. GE ORCIA 30303

g s .-.....f

In Reply Refer To: JUN 1 fr 1379

RII:EHB

50-348/79-19

Alabama Power Company

Atta: F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, Alabama 35291

Gentlemen:

This refers to the inspection conducted by E. H. Brooks of this office

on May 8-10, 1979 of activities authorized by NRC License No NPF-2 for

the Farley facility,IJnit 1, and to the discussion of our findings held

with J. Woodard at the conclusion of the inspection.

1

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Docu.sent Room.

6

.#

f 90sWOFM

. _ - .

- . .. .. - - _

j '\"

.

-

Alabama Power Company -2-

jut ! S G1

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

[.C.

R. C. was, Acting Chief

l Reactor Operations and

Nuclear Support Branch

Enclosure: i

Inspection Report No. 50-348/79-19 l

cc w/ enclosures: l

A. R. Barton  !

Executive Vice President  !

, Post Office Box 2641

Birmingham, Alabama 35291

J. T. Young

( Vice President-Production

Post Office Box 2641

Birmingham, Alabama 35291 l

H. O. Thrash '

Manager-Nuclear Generation

Post Office Box 2641

Birmingham, Alabama 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

Post Office Box 2641

Birmingham, Alabama 35291

W. G. Hairston III

Plant Manager j

Drawer 470  !

'

Ashford, Alabama 36312

R. E. Hollands, Jr.

QA Supervisor

Post Office Box U

Ashford, Alabama 36312