ML20084A952: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:r a
m                                ('~g
                                )                              V                                            "'
ggigs                                                                                  --~
iljyf;1G1 kntti1.173                                                                            l(Y '    "'"
ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y.14649 teaec o e anna coor ti. b.tG 27oO          l
                                                              .r . .q9g          Ginna Station G        1 N      February 6, 1975 N \                              .
5 r
B101975 + 3                                      '
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission    9  @1[f.yQ .g
                                                          .S,. ;    x Directorate of Regulatory Operations          k d b.<..          7 Region I                                    b 631 Park Avenue                                  G          g King of Prussia, Pennsylvania    19406
 
==Subject:==
Abnormal Occurrence 75 Failure of the IC Safety Injection Pump to Start Manually from Buss 16 Ginna Station Docket #50-244
 
==Dear Mr. O'Reilly:==
 
This is to confirm my phone call en Mr. .Tobn u mn thi: ::rnin; tc, agui.
Abnormal Occurrence 75-03 at Ginna Station.
While conducting a rctest of the IC Safety injection Pump on Buss 16, the pump failed to start manually the first time it was tried. It,was started again and it did start successfully. This test was part of tlie action taken in the investigation of Abnormal Occurrence 75-02 dated February 5, 1975 The PORC met and recommended a the' ough inspection of the holding coil of the lockout relaying and the breaker by the Electricians. Any further action
  ~
that PORC.
is necessary will be carried out after the Electricians report back to Very truly yours,
                                                                            'l        eAG Lee S. Lang      <.f Assistant Superintendent
    ,  LSL:fah cc:  Mr.-J. F. O' Leary, NRC Mr. G. J. Swarthou t, RG&E Mr. L. D. White, Jr. ,RG&E 1529-F304060034 750214 DR ADOCK 05000244 PDR
                            .}}

Latest revision as of 20:56, 13 May 2020

AO 75-03:while Conducting Retest of Safety Injection Pump 1C on Bus 16,pump Failed to Start Manually First Time.Holding Coil of Lockout Relay & Breaker to Have Thorough Insp
ML20084A952
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/06/1975
From: Lang L
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084A926 List:
References
AO-75-03, AO-75-3, NUDOCS 8304060034
Download: ML20084A952 (1)


Text

r a

m ('~g

) V "'

ggigs --~

iljyf;1G1 kntti1.173 l(Y ' "'"

ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y.14649 teaec o e anna coor ti. b.tG 27oO l

.r . .q9g Ginna Station G 1 N February 6, 1975 N \ .

5 r

B101975 + 3 '

Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission 9 @1[f.yQ .g

.S,. ; x Directorate of Regulatory Operations k d b.<.. 7 Region I b 631 Park Avenue G g King of Prussia, Pennsylvania 19406

Subject:

Abnormal Occurrence 75 Failure of the IC Safety Injection Pump to Start Manually from Buss 16 Ginna Station Docket #50-244

Dear Mr. O'Reilly:

This is to confirm my phone call en Mr. .Tobn u mn thi: ::rnin; tc, agui.

Abnormal Occurrence 75-03 at Ginna Station.

While conducting a rctest of the IC Safety injection Pump on Buss 16, the pump failed to start manually the first time it was tried. It,was started again and it did start successfully. This test was part of tlie action taken in the investigation of Abnormal Occurrence 75-02 dated February 5, 1975 The PORC met and recommended a the' ough inspection of the holding coil of the lockout relaying and the breaker by the Electricians. Any further action

~

that PORC.

is necessary will be carried out after the Electricians report back to Very truly yours,

'l eAG Lee S. Lang <.f Assistant Superintendent

, LSL:fah cc: Mr.-J. F. O' Leary, NRC Mr. G. J. Swarthou t, RG&E Mr. L. D. White, Jr. ,RG&E 1529-F304060034 750214 DR ADOCK 05000244 PDR

.