ML20084A914
| ML20084A914 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/13/1975 |
| From: | Lang L ROCHESTER GAS & ELECTRIC CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20084A905 | List: |
| References | |
| AO-75-04, AO-75-4, NUDOCS 8304050676 | |
| Download: ML20084A914 (1) | |
Text
- _ _ _ _d*44
/-,.yu.js <~ k. e O.
xec j
,3. g f y.
m
^
,f i
Ec;;g ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y.14649
~~O's.27oo L
[dthnaSUr, n
fj j
~
p
' i; Mr.,J. O'Reilly, Director Q
N 1I2 Directorate of Regulatory Operations U. S. Nuclear Regulatory Commission el Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
Abnormal Occurrence 75-04: Failure of the Main Steam Line Isolation (MSLI) Valves Solenoid valves to operate properly Cinna Station - Docket #50-244 Dear Mr. Case this is to cuaritu uj pLuas cer.ver::ti:n with Mr. Bha Sera-ear enday to re-port Abnormal Occurrence 75-04 at Ginna Station.
During the performance of PT-20, " Main Steam Isolation Valve Solenoid Trip Test" one air supply solenoid valve on the 1A Main Steam Isolation Valve failed to operate when tested.
Instrument and Control personnel were called and the test repeated twice and the solenoid valves operated correctly. The linkage on the supply solenoid was adjusted and the valve tested several times successfully.
The PORC met and recomended that the test be repeated before our scheduled outage on March 15, 1975 to determine'the amount of maintenance to be per-formed during the shutdown.
Very truly yours,
.)
w'
<m AL Lee S. Lang Assistant Superintendent
.-l-h g LSL:fah j.
N go-)
Ap f,[
h g[( i(t I b j
-cc Mr. Edson C. Case, AEC Mr. C. J. Swarthout, RG&E Mr. L. D. White, Jr. RC&E j
gg,,,
- p,- i, y3,peteeR
.s,n sa w:4
'tM1 PDR ADOCK 05000244
-^4"' h.,_L.'V. \\
8304050676 750221 M M ON_
/
ni tru e <;
d S
PDR 1858
~
--_ -