ML20084A941
| ML20084A941 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/05/1975 |
| From: | Lang L ROCHESTER GAS & ELECTRIC CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20084A926 | List: |
| References | |
| NUDOCS 8304060026 | |
| Download: ML20084A941 (1) | |
Text
a
~
k;cyg:g lQu
'itduc f
- =
s
(
aa" ROCNESTER GAS AND ELECTRIC CORPORATION e 69 EAST AVENUE, ROCHESTER, N.Y.1549 8
/-
...uo.
... s.io.22oo
.., ~.,.
fih.r h ]. Cinna Station February 5, 1975 i
FEB101975s q-f Mr. J. P. O'Reilly, Director l
g p,,',,[pf U.S. Nucicar Regulatory' Commission RT (.
/
g Directorate of Regulatory Operatio,ns
/gfgi
/
Region I f
631 Park Avenue 4
g ta King of Prussia, Pennsylvania 19406
)
~
t
Subject:
Abnormal Occurrence 75 Failure of the 1C Safety Injcetion Pump to Start Manually from Dus 16 j
Ginna Station Docket #50-244
Dear Mr. O'Reilly:
This is to confirm my phone call to Mr. John Hannon this morning to report Abnormal Occurrence 75-02 at Ginna Station.
L While conducting Periodic Test (PT-2.1), and following the sat,isfactory test of the 1-A and 1-B Safety Injection Pumps, the 1-C Safety Injection vn y ub M een 5: : ::.tc.* fw. uithet T2us 14 or bus 10, tatico to start manually on Bus 16 the first time it was tried.
The 1-C pump was started from Bus 14 and the pump test completed.
The pump was tried from Bus 16 twice since the malfunction and operated successfully.
The PORC met and reconrnended a thorough inspection of the breaker by the Electricians. Any further action that is necessary will be carried out after the Electricians report back to PORC.
Very truly yours, A-rt e Lee S. Lang Assistant Superintendent LSL:bg cc: Mr. J. F. O' Leary, NRC Mr. G. J. Swarthout, RC&E Mr. L. D. White, Jr. RG&E
[D gE h f
f304060026 750214 h
PDR ADOCK 05000244 25pg o
PDR w
- COPY SENT REGION c