r a
('~g m
)
V ggigs
--~
iljyf;1G1 l(Y '
kntti1.173 ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y.14649 teaec o e anna coor ti. b.tG 27oO
.r..q9g Ginna Station G
1 N
February 6, 1975 N \\
5 r
$ @1[f.yQ.g B101975 +
3 Mr. James P. O'Reilly, Director
.S,. ;
x U. S. Nuclear Regulatory Commission 9
Directorate of Regulatory Operations k d b.<..
7 Region I b
631 Park Avenue G
g King of Prussia, Pennsylvania 19406
Subject:
Abnormal Occurrence 75 Failure of the IC Safety Injection Pump to Start Manually from Buss 16 Ginna Station Docket #50-244
Dear Mr. O'Reilly:
This is to confirm my phone call en Mr..Tobn umn thi: ::rnin; tc, agui.
Abnormal Occurrence 75-03 at Ginna Station.
While conducting a rctest of the IC Safety injection Pump on Buss 16, the pump failed to start manually the first time it was tried.
It,was started again and it did start successfully.
This test was part of tlie action taken in the investigation of Abnormal Occurrence 75-02 dated February 5, 1975 The PORC met and recommended a the' ough inspection of the holding coil of the lockout relaying and the breaker by the Electricians.
Any further action that is necessary will be carried out after the Electricians report back to PORC.
~
Very truly yours,
'l eAG
<.f Lee S. Lang Assistant Superintendent LSL:fah cc: