n I
C U
./
1 w as;
,7 ROCHESTER GAS AND ELECTRIC CORPORATION e 69 EAST AVENUE, ROCHESTER, N.Y. lY49 ta t e rwo.c anta coor m 546 27oo Ginna Station
~
July 25, 1975 I
Mr. James P. O'Reilly, Director E J{,)
3 Directorate of Regulatory Operations H. 3301975 '
Region I U. S. Atomic Energy Commission 631 Park Avenue
A King of Prussia, Pa.
19406 C
g..
g kg i
Sub,1ect: Abnormal Occurrence 75-12: Failure of Undervoltage Relay During Monthly Surveillance Test Ginna Station i
Docket #50-24h
,i l
Dear Mr. O'Reilly:
During the performance of the Monthly Surveillance Procedure FT-9, "Under-voltage and Underfrequency Protection" on July 25, 1975, upon opening the knife switches for the solenoid coil of primary undervoltage device 273/11B, it was discovered that the device armature did not drop down to assume its' de-energized position. As a result of this failure to operate, the Reactor l
Trip Undervoltage Protection signal was not generated to this relay. The knife switches were in: mediately opened again, and this second time the relay operated properly. The other three undervoltage relays on the 4160 volt bus were tested and they operated properly, i
l R'G & E Relay Department was contacted and a relay man cane to the station to investigate the failure.
A scale accumulation was noted on the armature plunger opposite the area of f'
the upper guide bearing. This accumulation was similar to that reported as abnormal occurrence 73-1 on May 29, 1973.and 7h-19 on December 5, 1974. All
' four undervoltage relays were removed, one at a time, and the scale accumulation
~
't '
s l?
was removed and the plunger polished. Upon returning the devices to services,
~
the applicable section of PT-9 procedure was performed to verify operability.
~
Very truly yours,.
DR O
a S
A,,,
Lee S. Lang Assistant Superintendent ec: Mr. J.F.0' Leary,'NRC n