ML20084E208

From kanterella
Jump to navigation Jump to search
AO 50-244/74-09:on 740530,during Surveillance Test PT-9, One Underfrequency Relay on Bus 11A Failed to Transmit Signal of Simulated Fault Condition.Relay Replaced
ML20084E208
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/30/1974
From: Platt C
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084E207 List:
References
AO-50-244-74-09, AO-50-244-74-9, NUDOCS 8304140437
Download: ML20084E208 (1)


Text

P

. t

(,

i s j-,5

)G

?

ROCHESTER GAS f.!!D ELECT.?!C CORPORATION e 69 EAST AVEllUE, RCCHESTER. N.Y.14649 Ginna Station

,,u..,

^". m m 2700 May 30, 1974

[.._~

c:M'j] [ ^

Mr. James P. O'Reilly, Director Directorate of "egulatory Operations

[(,(-

Region 1 l

4 U.S.A.E.C.

hLD~

' g6 W 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Abnor-al Occurrence 74-9: Failure of Underfrequency E.

d 6A h,. A f/

Relay During Surveillance Test fI

\\c;

/gM..g/

Ginna Station Docket 50-244

Dear Mr. O'Reilly:

This is to confirn c.y convercation with Mr. A. D.

Davis today to report Abnorn.a1 occurrence 74-9 at Ginna Station.

During the norning of May 30, 1974, while conducting the routine Monthly PT-9 Surveillance Test (Periodic Test - Undervoltage and Underfrequency Protectica 11A and lin - 4160 Volt Busses) one of the underfrequency relays

' "O " a d a "l* " a fa"1" ec. ::.c. 11.'. hu faild to tran:rit a rian:1 t^

the i

condition was being sinulated. This failure defeated one of the two channels of redundancy provided for underfrequency protection o,f this bus.

Inc faulty relay was replaced with a sparc relay. The spare relay vaa tested satisfactorily and declared operable at 1125 on May 30, 1974.

Very truly yours, C. f4w j,

Charles E. Platt Superintendent CEP:bg xc :.lMr. _J. F. O ' Leary, AEC Mr. G. J. Swar thou t, RCLE L-r c { t,/

p.

L

\\

\\3 b i

A O

4 S

PDR

'("'

4

/

7 f

f.). a.. p./

on

-.FY SEKr REGION.. _..

2 cp-..

,