AO 50-244/74-19:on 741204,during Monthly Surveillance Test PT-9,undervoltage Relay 274/11B Failed.Caused by Scale Accumulation on Armature Plunger Opposite Upper Guide Bearing.Plunger Polished
ML20084E111
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/05/1974
From: Platt C
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084E113 List:
References
AO-50-244-74-19, NUDOCS 8304140107
Download: ML20084E111 (1)


Text

.

t____..,

~

(

(

k

e.,

, '. *:' '1.l j Q

.u.

\\[

g.

3

_y ROC ll ESTER GAS AND ELECTRIC CORPORATION o 69 EAST AVGNUE..iOCHESTER. H.Y.14M9 T c L E P**ON I aata coot tie 546 2700 Ginna Station December 5, 1974 Mr. James P. O'Reilly, Director l

Directorate of Regulatory Operations Region 1 y

(

U. S. Atcmic Energy Cc= mission

(.

i 631 Park Avenue k

King of Prussia, Pa.

19406

\\,

I

Subject:

Abnormal Occurrence 74-19: Failure of Undervoltage Belay During k

Monthly Surveillance Test

{

Ginna Station Docket #50-244 t

i

Dear Mr. O'iicilly:

i I

During the pcrformance of the Monthly Serveillance Procedure PT-9, "Under-voltage and i'nderfrequency Protection" on Dcccaber 4, 1974, upon opening the knife switches for the solenoid coil of primary undervoltage device 274/118. It was discovcred that tne device armature did not irop down to asswae its' de-caergized position. As a result of this f ailure to operate, the Reactor Trip Undervoltage Protection sir,nal was not generated for this i

relay. The knife switches were it=ediately opened again, an<' this second l

t'ime the relay operated properly.

The other thrce undervoltage relays on the 4160 volt bus were tested and they operated properly.

RG&E Relay Department was contacted and a relay can came to the station to l

Investigate the failure.

4 f

A scale accumulation was noted on the armature plunger opposite the area of the upper guide bearing.

Thi accumulation uas similar to that reported as l

abnormal occurrence 73-1 on May 29, 1973.

All four undervoltage relays were removed, cac at a tire, and the scale accumulation was removed and the plun-l ter polished.

Upon returning the devices to service, the applicable sect' ion l

of PT-9 procedure was performed to verify operability.

f Very truly yours, g41401oy741213

/bi Y~

ADOCK 05000244 S

Charles E. Platt PDR Superintendent cc: