ML20084A888
| ML20084A888 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/18/1975 |
| From: | Platt C ROCHESTER GAS & ELECTRIC CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20084A881 | List: |
| References | |
| AO-75-05, AO-75-5, NUDOCS 8304050667 | |
| Download: ML20084A888 (1) | |
Text
=
c-
. _ _...0 Q,-n.
L,7 9:?g '
~
f;h:::y i
ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCNESTER, N.Y.14649 g
r
,g
,. u. - r aata cons no 546.27oO g
.Y Ginna Station
j...
February 18, 1975
<D. lbler W,
9 f
FtB23B78
?
t-Mr. James P. O'Reilly
"'.cNCEs"'
io
- . art-w
- 3 U. S. Nuclear Regulatory Commission
/.
Directorate of Regulatory Operations
\\/ e WI Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
Abnormal Occurrence 75-05: Failure'of the IC Safety Injection Pump to start manually from Bus 16 Ginna Station Docket #50-244
Dear Mr. O'Reilly:
This is to confirm my phone call to Mr. John Streeter this morning to report Abnormal occurrence #75-05 at Ginna Station.
While conducting Periodic Test PT-2.1 this morning, the IC Safety Injection Pump failed to start from Bus 16 when the control switch was manually activated in the Control Room. The control switch was immediately actuated again, and this time the pump started. The 1A and the IB Safety Injection Pumps were then tested satisfactorily.
Tha. PORC met and recommended further investigation of the breaker on Bus 16, and a thorough check of the Bus 14 - Bus 16 interlock scheme at the breaker on Bus 14 The IC Safety Injection Pump is to be started once a week from Bus 16 until the PORC changes the frequency of testing.
Very truly yours,
{ l J _.. E.
$ W + -
Charles E. Platt Superintendent CEP:fah cc:
Mr. Edson G. Case, NRC Mr. G. J. Swarthout, RC&E Mr. L. D. White, Jr., RC&E MA*ENfdhd-2053 s