ML20084E149

From kanterella
Jump to navigation Jump to search
AO 50-244/74-15:on 740815,1A Steam Generator Blowdown Isolation Valve Failed to Close Properly.Further Insp of Valve Operator Recommended
ML20084E149
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/16/1974
From: Platt C
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084E147 List:
References
AO-50-244-74-15, NUDOCS 8304140359
Download: ML20084E149 (2)


Text

g -

m - .

vet eme=e s.t24C4E saa 548 2 7

' ~ . O -

O cinna Statien August 16, 1974 Mr. James P. O'Reilly, Director Directorate of Regulatory Operations 1 Region I U. S. Atomic Energy Coasnission ,gg}.; .

631 Park Avenue k;.p.l. p.; '.

King of Prussia, Pennsylvania 19406 7g w .A g

a

Subject:

Abnortsal occurrence __74-15: Failure of the lA Steam Generator Y D" Blowdown Isolation Valve (CV-70) to closs properly

{hh i . 9 %,

A%

5 Daar Mr. O'Reilly: .h , y,

. w, .

This is to confire my phone call to Mr. Bert Davis this afternoon to report ..~ Z c Abnormal Occurrence 74-15 at Ginna Station. N.N. 3.

When Instrument and Control personnel checked out a trouble card yesterday Q(Q)h

. . . . ." ~ "

af ternoon in regards to the limit switch on Valve CV-70 not working properly, they found that tha 1imit switch was working properly, but tht the valve was only closing 807.. There was an apparent violation of the Technical Specifica _

tions in that we did not close the manual valve shead of Valve CV-70 on the ..

af ternoon of August 15, 1974 when it was detertained that the valve was not closing all the way. _

3 At 1000 this morning, the manual valve ahead of Valve CV-70 was closed to y estabilsh containment integrity. Valve CV-70 was then operated and it hung - t up momentarily at the 807. closed position and t. hen it went all the way closed .j The PORC cet and recocmended that the valves be stroked again several times '

with the manual valve closed, and if the valve worked satisfactorily, stroke  ;?

it several times with the manual valve open and steam generator pressure on the valve. Also, the reco:raendation was made that maintenance personnel make -

a further inspection of the valve operator. -

The vcive worked satisfactorily several times with the manual valve closed.

The manual valve was opened and valve CV-70 was stroked several times. The -

3 first few times, the valve operated erratic (but it always closed) and then ',

it operated satisfactorily - smooth motion and 1007. closed.

Maintenance personnel are making further inspections of the valve operator (air to open - spring to close) and the proper operation of the valve. The PORC will meet again this af ternoon to make further recocznendations af ter receiving the inspection report from the maintenance personnel. V

=

PDR ADOCK8304140359 S

05000244 740823 ) _ . . -

PDR k

~ '

.. O - -

Ort-trnr.,

C4 m!LE. M Charles E. Platt Superintendent CEP:fah cca Mr. J. F. O' Leary, AEC Mr. G. J. Swarthout, RG&E Mr. L. D. White, Jr., RG&E I EE O

\