AO 50-244/74-07:on 740426,during Surveillance Test, Underfrequency Relay 811/11A Found Inoperable.Caused by Opening of Electrolytic Capacitor.Printed Circuit Board Replaced
ML20084E231
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/03/1974
From: Amish K
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084E228 List:
References
AO-50-244-74-07, AO-50-244-74-7, NUDOCS 8304140459
Download: ML20084E231 (3)


Text

"

L

F '~' %

y' " -

. L,,

uf ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y.14649 a t i;H v. Aussa vette ome u o

<.cc ent s.t r.r Aasacoortis 546 2700 E L E 0 t fu " S NO Sig a to May 3,1974 4 -)

\\.k -

01 a

=. y. M'l %g w

v s

..a.

ts. 6['heg

- &,b Mr. James P. O'Reilly, Director Directorate of Regulatory Operations W ;'"

RegionI v'

U. S. Atomic Energy Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Abnormal Occurrence 74-7: Failure of Underfrequency Relay during surveillance test R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244

Dear Mr. O'Reilly:

In accordance with Technical Specifications, Article 6. 6. 2a, the attached report of Abnormal Occurrence 74-7 is hereby submitted.

Very truly yours,

,N[A/f4 J Keith W. Amish Attachment xc: Mr. John F. O' Leary

I 1

(J!

,e 3' ', ']/ ' !

w

(

pgB/8EWS

/

4041 o

COPY SENT REGION

O O

1.

Report Number:

50-244/74-7 2a.

Report Date:

May 3,1974 '

2b.

Occurrence Date:

April 26,1974 3.

Facility:

R. E. Ginna Nuclear Power Plant, Unit No.1 4.

Identification of Occurrence:

This abnormal occurrence is defined by Technical Specifications Article 1.9 d: Failure of one or more components of an engineered safety feature or plant protection system that causes or threatens to cause the feature or system to be incapable of performing its intended function.

5.

Conditions Prior to Occurrence:

The Plant was operating at a steady-state power level of approxi-mately 610 MW thermal shortly after a power increase from 304 MW thermal.

i 6.

Description of Occurrence:

At 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br /> on April 26, 1974, during performance of the monthly surveillance test "Undervoltage and Underfrequency Protection 11A and 11B 4160 Volt Buses", an underfrequency relay (811/11A) was found to be 4

inoperable. This device is a primary element in the logic' scheme for tripping the Reactor Coolant pumps (1/2 + 1/2 logic from each 4 Kv Bus) 3 d 01:0 f : th:.". ::::: tri; I ;;i if ;;r.T.10:1 1 : ? ? i: p r o t e ".t.

8 The procedure had been performed satisfactorily to the point where it was necessary to close the main contact for the 811/11A relay. The auxiliary and Icgic relays associated with' the signal from the 811/11A i

relay did not operate. The redundant underfrequency relay for this bus (812/r1A) was immediately tested and found to be operable (1/2 logic).

i The test was terminated at this point and the Rochester Gas and Electric i

Relay Department was contacted to inspect the suspect relay.

A Plant Operations Review Committee meeting was convened at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> to approve an Emergency Maintenance Precedure (EM-117) to allow removing the suspect relay and replacing it with a spare.

Underfrequency relay 811/11A _was removed at 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br /> and it was found that an electrolytic capacitor in the timing circuit had opened. A tested spare was used to replace relay 811/11A so that it could be returned to the Relay Department for further testing. The replace-ment relay was checked for operability. Periodic' Test PT-9 was completed without further problems at 1420 hours0.0164 days <br />0.394 hours <br />0.00235 weeks <br />5.4031e-4 months <br />.

7.

Designation of Anparent Cause of Occurrence:

l The apparent cause of the 811/11A relay failure was an electro-lytic capacitor which had opened. This' capacit'or is located on a printed r

circuit board within the relay case and is part of a timing circuit which i

r J4

Abnbrmal Occurrenco 50-244/74-7 cont'd.

2 i

must operate to complete the relay's trip circuit.

8.

Analysis of Occurrence:

There were no safety implications as a result of this occurrence since the redundant underfrequency relay (812/11A) for this bus was found to be operable. Both relays on the llB Bus (811/11B and 812/11B) were also operable.

9.

Corrective Action:

a.

The faulty relay (811/11A) was returned to service on April 29, 1974 after the printed circuit board, which had included the open capacitor, had been replaced and the relay bench tested. This printed circuit board has been modified by the manufacturer (Westinghouse) since these underfrequency relays were initially placed in service to prevent overloading of this circuit.

b.

Additional modified printed circuit boards have been ordered to replace those which are still in service (812/11A, 812/11B and the spare).

Relay 811/11B had been modified after a similar occurrence on January 31, 1972 and has operated in service since that time without failure.

10.

, Failure Data:

a.

As noted in-9.b there has been one other failure with this type of relay which occurred on January 31, 1972. This was reported as Abnormal Occurrence 72-2.

b.

Equipment identification: Westinghouse, Type KP Underfrequency

~

Relay, Style 671B287A10.

G e

.l 1

f o

<