ML19317E596: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 50: Line 50:
l DAILY UNrr POWER LEVEL FOR\1 INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each das m the reporting month.
l DAILY UNrr POWER LEVEL FOR\1 INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each das m the reporting month.
Compute to the nearest whole megawatt.                                                                )
Compute to the nearest whole megawatt.                                                                )
                                                                                                      ;
These figur:s will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be .n easions when the daily average power level exceeds the 100'," line (or the restricted power lesel kne). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
These figur:s will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be .n easions when the daily average power level exceeds the 100'," line (or the restricted power lesel kne). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.



Latest revision as of 17:08, 21 February 2020

Monthly Operating Rept for Feb 1977
ML19317E596
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/10/1977
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E588 List:
References
NUDOCS 7912180798
Download: ML19317E596 (3)


Text

- . - . - ._ .- . ._ . _ _ - - . .-

UNIT Oconee Unit 3  !

nirt 3' o'77 O DOCKET NO. 50-257

PREPARED BY L. J. Bare OPERATING STATUS
1. REPORTING PERIOD: February 1 THROUGH Fetruary 28, 1977 GROSS HOURS IN REPORTING PERIOD: 672
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY

, (MWe-Net): 860

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) i 4. REASONS FOR RESTRICTION (IF ANY) s Month Year to Date C e lative
5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 423.3 1167.3 14570.02 ,
6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON-LINE 413.18 1157.18 14180.68
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH) 992848 2933438 33301655 f 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 347230 1020520 11459964
11. NET ELECTRICAL ENERGY GENERATED (MWH) 329121 975587 10909229 l
12. REACTOR SERVICE FACTOR 63.0 82.4 75.3
13. REACTOR AVAIIABILITY FACTOR 61.5 81.7 75.8
14. UNIT SERVICE FACTOR 61.5 81.7 73.3
15. UNIT AVAILABILITY FACTOR 61.5 81.7 73.3
16. UNIT CAPACITY FACTOR (Using Net 57.0 80.1 65.6 Capability) i 17. UFIT CAPACITY FACTOR j (Using Design Mwe) 55.2 77.7 63.6 *
18. UNIT FORCED OUTAGE RATE 38.5 18.3 14.3
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, isA'"E & DURATION OF EACH:)
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS RFACTOR WAS CRTTICAT' X 100 HOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = Hol!RS REACTOR UAS AVAILAfil.E TO OPER!n r: X 100 i Il0URS IN REPORTING PERICO UNIT SERVICE TACTOR = holts CD:ERATOR ON L1NE HOURS IN REPORTING PERIOD ,

l I- -

UNIT AVAILABILITY FACTOR = 110URS UNTT WAS AVA11 A LC TO CFJ:ERATE X 100 HOURS IN REPokTING PER10D UNIT CAPACITY FACTOR = NET ELECTRICAL POKER CENERAT 2180"798 . yo s

[Ntst Capability or Desann (We-Net)] X 110U1:5 IN itCPtd.T*1lh.

PERIOD UNIT FORCED OUTACE RATE - FORCED OUTAGE HOURS X 100 HOURS GENERATOR ON 1.7NE + FORCED OUTAd. 3OURS

DOCKET NO. Sn-287 UNIT Oconee Unit 3 DATE 3/10/77 AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 3 869 37 868 ~

8 3 869 gg 867 -

4 5 867 21 6 871 22 874 7 23 873 392 9 871 25 10 26 11 871 27 724 871 849 12 28 862 13 29 08 14 30 15 31 16 l

l DAILY UNrr POWER LEVEL FOR\1 INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each das m the reporting month.

Compute to the nearest whole megawatt. )

These figur:s will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be .n easions when the daily average power level exceeds the 100'," line (or the restricted power lesel kne). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

w DdCKET NO. 50-287 UNIT SHUTDOWNS UNIT NAMii oconee Unit 3 DATl! 3/10L77 __

REPORT MONTil February, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (H THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 1 2/14/77 F 222.44 A 1 Repaired tube leak in "3B" steam generator.

2 2/24/77 F 36.38 D 1 Pursuant to Oconee Technical Specifica-tion 3.1.5.4, corrected high chloride concentration in reactor coolant system.

(l) REASON (2) METIMMs A EQUIPMENT F AILURE IEXPLAIN) l-MANUAL B - M AINT, OR TEST. 2-MANUAL

~

C- RLI t;LLING SCRAM D-REGULA10RY RESTRICTION 3 .* UTOM ATIC i E-OFER ATOR 1R AINING AND SrR AM LICLNSE EX AMINATION 4-Other I - ADMINIST R AllVE G-OFER AllON AL I R ROR ILXFLAIN)

II -01 BIL R (E XPLAIN)

SUMMARY

One major outage this month.