- 3,.
s m. 'a
.t # {
r s
CPERATING DATA REPORT s
DOCKET 50-269 DATE 4-15-97 OPEFATINGSTATUh COMPLETED Ey
- 3. A. Reavis s
,j2
., t -
TELEPHONE 704/373-7567
- 1. Unit Nase: OCONEE 1
/
- 2. Reporting Feriod VM CH 1, 1987-SRCH 31, 1987
- 3. Licersed Thersal F ner (MWt):
2568 4.'NaseplateRating(GrossMWelt 934 i Netes Year-tc date and t
f
- 5. Design Electrical Rating (Net MWe):
866 I cusulative capacity factors I
- 6. Maxisas Dependable Capacity (Gross 899 I are calculated using a neight-l
- 7. Maximaa Dependable Casacity (Net MWe):
860 i ed average for santeus i
B. If Changes cccur in tapa: ty Ratings (! tees Nueber 3 Through 7) Since Last I dependable capacitr.
I R n ort. sive Reasons:..........._................ _....
1 i
', i estricted, il.I...........I......
~?..E.....[...l.l.........E....._
ny (Net Mc
. emer eve e Witch
- 10. F e a so n F s t B e s t r i c t i t n s, i f a n y....................".".."."..".."..".."....'."."..".."........."..".".".".".."..".."."...... ".".".'
~ ~ ~
~~~~~.....
~
J' This Mocth Yr.-to-Date CusulatWe.
744.0 2,160.0 120,169.0
~/j,11.HoursinReportingPerted i
4
- 12. Naeber Of Hours Feactor Was Critical 626.0 1,855.5 88,250.4 3
- 13. Feactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hears Eenerator On-Line 618.9 1,844.0 84,846.1
- 15. Lnit Reserve Ehutdown Hours
--0--
~0--
--0--
r-16.GrossThersalEnegySererated(MWH) 1,40,216 4,449,816 205,375,921 f.17. Gross Electrical Erergy Generated (MWH) 494,970 1,535.240 71,329,710 IB. het Electrical Energy Generated (MWh) 457,111 1,453,421 67,636,465
- 19. Unit Service Factor 23.2 E5.4 70.6 i
- 20. Unit Anilasility Factor 83.2 35.4 70.6
- 21. Unit Capacity Fa: tor (Using MDC Net) 71.4 78.2 65.3
- 22. Lnit Capacit Facter tusirs DER Net) 69.3 76.0 63.5 r.it Fcrce t
0.0 0.0 14.6 hui,do.rscheddaeFate-.ed Over hext 6 Months (Type, Date, and Duration of Each):
3.
4.
.....MfJa911ng. :.AVayF.C.2L.12Sl..10. seeks...........
25"IMEMiinn;MnipiirPifiirtiliiiiinili'iniiilus:
E6. Urits In Test Status (Frior to Cossercial Operation):
"""""""""""~Fiiiiiii'"""AE6IiiiT INITIAL CRITICALITY INITIAL ELECT 91CliY tCMER:!AL OPERATION 4
E
/ -
,r
/
i 4
\\\\
F 8704220008 870331 PDR ADOCK 0500 R
sJ
'i ll AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-269 UNIT Oconee 1 DATE April 15, 1987 COMPLETED J. A. Reavis TELEPHONE 704-373-7567 MONTH MARCH,1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWE-Net) 1 0
17 755 2
0 18 755 3
0 19 754 4
0 20 753 5
0 21 753 6
392 22 753 7
748 23 754
=
8 750 24 755 9
4 9
753 25 755 10 755 26 754 755 27 754
=.
12 755 28 751 13 756 29 753 14 755 30 754 15 755 31 753 1.
16 755 L
- m
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
_5Q-262______'_____-
UNIT NAME __QCQNEE_1________
DATE _Q4/15/@7_________
REPORT MONTH _______ March _12@7_
COMPLETED BY _ GERALD _REAVIS____
TELEPHONE _(7Q4):373;7562___
MET-R HDD
}
E
. 0F L
l T
A SHU-LICENSE l
N Y
S TING EVENT SYS-CAUSE AND CORRECTIVE l
0 P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO
}
DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE l
1 67 1 S l 125.13 A
4 EA TRANSF HIGH ACETYLENE LEVELS IN MAIN l
TRANSFORMER l
}
7-p 87 6 S
A EA TRANSF POWER LIMITED BY SIZE OF REPLACEMENT l
TRANSFORMER
)
)
l I
)
I
)
l
}
I i
1 2
3 4
F Forced Reason:
Method:
Exhibit G-Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-Ol61)
E-Operator Training & License Examination F-Administrative 5
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
DOCKET NO:
50-269 UNIT:
Oconee 1 DATE:
4/15/87 NARRATIVE
SUMMARY
Month: March, 1986 Oconee Unit 1 began'the month in an outage to replace the unit's Main Transformer. The unit returned to service on 3/06 and increased power to 88% of its rated output. The unit is limited by its temporary Main Transformer. The unit operated between 88% and 90% power for the remainder of the month.
t
(
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Ocones, Unit 1 2.
Scheduled next refueling shutdown: August, 1987 3.
Scheduled restart following refueling: November, 1987 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
938*
8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 DUKE POWER COMPANY DATE: April 15, 1987 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
- Represents the combined total for Units 1 and 2.
...-,,-----..,,,m
--e yr----r-, -,,. -, - - - - -. -, -.
,.,--y.-,
,.y-------
m OPERATING DATA REPORT DOCKET 50-270 DATE 4-15-87
......'96 ETATU3 COMPLETED BY J. A. Reavis CPERATI TELEPHONE 704/373-7567
- 1. Unit hise: OCONEE 2
- 2. Reporting Feriod: MARCH 1, 1987-PARCH 31, 1987
- 3. Litersed Thereal Power (MWt):
2568 Q. Niceplate Rating (Gross MWe):
934 I Notes Year-to date and 1
- 5. Design Electrical Rating (Net MWe):
696 I cueulative capacity factors I
- 0. Mulaus Dependable Capacity (Gross 899 I are calculated using a weight-i
- 7. Marious Dependable Capacity (Net Kne):
660 l ed average for saxicas-I S. If Changes Occur in Capacity Ratings (! tees Nester 3 Through 71 Since Last I dependable capacity.
I Peport. 6tve Reasons:
1 i
- 5. P;mer level To Which Restricted, if Anf (Net MWe):
- 10. Reason For Restrictiors, If any:
-=_
This Month Yr.-to-Date Cueulative 2,,160.0
!!0,089.0 2
- 11. Hours In Fe;orting Periot 744.0 143.1 82,234.3
- 12. Nasber Of Hours Reacter Was Critical 740.0
- 13. Reactor Reserve Shutdenn Haurs 14. Fours Bererator On-Line 731.6 2,121.1 80,847.1
- 15. lirit Feserve Stutdown Hours !!. Sross Thersal Energy Generated (MWH) 1,789,552 5,251,032 193,539,310
- 17. Gross Electrical Energy Generated (MWii) 622,730 1,808,770 65,942,291
- 10. Net Electrical Energy Generated (MWH1 595,967 1,730,999 62,699,624
- 19. thit Service Factor 98.3 92.2 73.4
- 20. Unit Availability Factor 92.3 98.2 73.6
- 21. Urit Capacity Factor (Using MDC Net) 93.1 93.2 66.1
- 22. Unit Capacity Factor (Using DER Net) 90.4 90.5 64.3
- 23. Unit forced Outage Fate 1.7 1.8 12.6
- 24. 5Futicans Scheduled Over Next 6 Months l Type, Date, and Duratier, of Each):
......... 6019 -
" i _....i
.R5.'.Z 15"WinilisFAITnTTRe;iert7iFioi Gtisatea EiTFW5fiiTup:--
.-=--
Forecas teve3
- 26. Units in Test Status (Prior to Consercial Operation):
INITIAL CRITICALITY INiilAL ELECTRICITY CCMMERCIAL OPERATION r
i AVERASE DA!!V UNii POWER LEVEL DOCKET NO 50-270 UNIT Oconee 2 DATE April 15, 1987 COMPLETED J. A. Reavis TELEPHONE 704-373-7567 MONTH MARCH,1987 DAY AVERASE DAILY POWER LEVEL DAY AVERAGE DAILY PDWER LEVEL (MWE-Net)
'MWE-Net) 1 819 17 825 2
820 18 820 3
820 19 819 4
817 20 819 5
819 21 816 6
824 22 816 7
827 23 817 8
029 24 819 9
827 25 820 10 824 26 803 11 823 27 221 12 824 28 812
_ = -.
13 824 29 817 14 824 30 819 15 825 31 820 16 824
'l UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO.
50-270 UNIT NAME
__QQQNEE_2________
DATE _Q4f15LQ2_________
REPORT MONTH _______Margh_1282_
COMPLETED BY _QERALQ_REAVIS____
TELEPHONE _1794)-323-7562___
MET-R HOD E
OF T
A SHU-LICENSE N
Y S
TING EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 6-p 87 1 F
A HB xxxxxx HIGH FEEDWATER FLOW IN
'2A' STEAM GENERATOR 3
87-3-26 F
12.43 A
3 CB GENERA REACTOR AND GENERATOR TRIP DUE TO HIGH REACTOR COOLANT SYSTEM PRESSURE 7-p 87-3-27 F
A HH PUMPXX PROBLEMS WITH
'2A' FEEDWATER PUMP 8-p 87-3-28 F
A HB xxxxxx HIGH FEEDWATER FLGW IN
'2A' STEAM GENERATOR 1
2 3
4 F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-Ol61)
E-Operator Training & License Examination F-Administrative 5
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
r DOCKET NO:
50-270 UNIT:
Oconee 2 DATE:
4/15/87-NARRATIVE
SUMMARY
Month: March, 1987 Oconee Unit 2 began the month at 97% power,' limited by high Steam Generator-levels. On 03/26, a spurious signal in the Integrated Control System caused the unit to trip. The unit returned to service on 03/27 and escalated power to 96%,
where it remained for the rest of the month.
i i-F l
l I
(
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Oconee, Unit 2 2.
Scheduled next refueling shutdown: December, 1987 3.
Scheduled restart following refueling: March, 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Connaittee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
938*
8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 DUKE POWER COMPANY DATE: April 15, 1987 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined total for Units 1 and 2.
L OPERATING DATA REFDRT DOCKET 50-267 DATE 4-15-87 0PEFATING STATUS COMPLETED BY J. A. Reavis TELEPHONE 704/373-7567
- 1. Unit hase 0'ONEE 3
- 2. Pe;orting Period: MAR"H 1,1967-MARCH 31,1927
- 3. Licensed ~hereal Fower (MWt):
2568
- 4. Naseplate Rating (Gross MWe): '
934 I Notes Year-to date and__
1
-9.DesignElectricalRating(NetMWe):
986 l cumulative capacity fatters I
- 6. Marisue Dependable Capacity (Gress 899 1 are calculated using a weight-i
- 7. Marious Dependable Capacity (het MWe):
660 1 ed average for eaxinus l
E. If Cnanges Occur in Capacity Ratings (! tens Nueber 3 Through 7) Since Last I dependable capacity.
1 Report. Give Reasons:
l I
~~
T'EcwerLevel70Which-Restricted,'lfAny(NetMWeII.,,.._
- 10. Feas:n or Restrictions, If any:
r
=.........-
This Month Yr.-to-Date Cusulative ll. Hours In Reporting Period 744.0 2,160.0 107,736.0
- 12. Number Of Mcurs Reactor Was Critical 51.9 51.9 77,258.6
- 13. Rea: tor Feserve Sautdcun Hours
--0--
--0--
--0--
M. Hours Generator On-Line 0.6 0.6 75,915.9
- 13. Unit Fgserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross thereal Energy Generated (MWH) 2,472 2,472 125,449,582
- 17. Grcss Electrical Energy Generated (MW4) 360 36C 63,821,434
- 18. Net Electrical Energy 6enerated (MWH)
(5,940)
_ 9,455) 60,834,208
(
- 19. Jnit Service facter 0.1 0.0 70.5
- 20. Unit A<ailability Fatter 0.1 0.0 70.5
- 21. U7it Capacity Factor (Using MDC Net) 0.0 0.0 65.5
- 22. de:t Capa:ity Factor (using DER Net) 0.0 0.0 63.7
- 23. Unit Farceo Outage Rate 0.0 0.0 13.9
- 24. Shatdowns Scneduled ]ver Next 6 Months (Type, Date, and Duratien of Eacnl:
...Cntrentlx RefneUng--
25! li'5EuiliiiDi'iffdileport Ferio3. Estteatec Date of 5tartups.~~
April l L. 193 71....i.......,dh[i e v e::.2
~~~
fore:as
- 20. Uni:s in Test States (Prior te Consercial Operatton):
i INITIALCRITICALITY INITIAL ELECTRICITY COV ERCIA'. OPERATION l
l t
t f
l AVERAGE DAILY UNIT PDWER LEVEL f
f D0rKET NO 50-287 I
UNIT Oconee 3 DATE April 15, 1987.
COMPLETED J. A. Reavis TELEPHONE 704-373-7567 MONTH MARCH,1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERASE DAILY POWER LEVEL (MWE-Net)
(MWE-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-287 UNIT NAME
__QQQNEE_3________
DATE' _Q4215282_________
REPORT MONTH _______ Match _1282_
COMPLETED BY._GERALQ_REAVIS____
TELEPHONE _12941:@23:2562___
e-MET-R HOD E
OF T
A SHU-LICENSE N
Y S
TING EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION.TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 1
87 1 S
264.00 C
4 RC FUELXX END OF CYCLE 9 REFUELING OUTAGE 1A 87-3-12 S
447.87 C
4 CB PUMPXX REFUELING OUTAGE EXTENSION.DUE TO REACTOR COOLANT PUMP WORK 2
87-3-30 S
31.50 B
1 HA GENERA GENERATOR BEARING VIBRATION 1
2 3
4 F Forced Reason:
Method:
Exhibit G-Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative 5
G-Operator Error (Explain)
Exhibit I - Same Source.
H-Other (Explain)
DOCKET NO:
50-287 UNIT:
Oconee 3 DATE:
4/15/87 NARRATIVE
SUMMARY
Month: March, 1987 Oconee Unit 3 began the month in a refueling outage. The outage was extended due to additional required work on the unit's reactor coolant pumps. On 3/30, as the unit's generator was being prepared to be put on line, excessive vibration was detected on two of the generator's bearings. The unit immediately The outage lasted through the end of the month.
entered a maintenance outage.
?
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Oconee, Unit 3 2.
Scheduled next refueling shutdown:
Currently Refueling 3.
Scheduled restart following refueling:
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
529 8.
Present licensed fuel pool capacity: 875 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: Augus t, 1991 DUKE POWER COMPANY DATE: April 15, 1987 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT 1.
Personnel Exposure For the month of February, 17 individuals exceeded 10 percent-of their allowable annual radiation dose limit with the highest dose being 1.760 Rem which represents approximately 14.7% of that person's allowable annual limit.
2.
The total station liquid release for February has been compared with the Technical Specifications maximum annual dose commitment and was less
.than 10 percent of this limit.
The total station gaseous release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
D DUKE POWER GOMPANY i
v.o. nox aatso CHARLOTTE, N.C. 28242 un n.Tucxsa retze=o==
== ramment (704) 373-453:
neusam reonomom l
April 15, 1987 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.
20555 Re: Oconee Nuclear Station Docket No. 50-269, -270, -287
Dear Sir:
Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of March, 1987.
l Very truly yours,
/
6.nQ, Hal B. Tucker JAR /18/sbn Attachment xc:
Dr. J. Nelson Grace, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, CT 06032 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Comission Suite 1500 MNBB-5715 1100 circle 75 Parkway Washington, D. C.
20555 Atlanta, Georgia 30323 Ms. Helen Pastis, Project Manager Ms. Judy Dovers Office of Nuclear Reactor Regulation Nuclear Assurance Corporation U. S. Nuclear Regulatory Commission 5720 Peachtree Parkway Washington, D. C.
20555 Norcross, Georgia 30092 Mr. J. C. Bryant NRC Resident Inspector Oconee Nuclear Station 4 54q
- - - _