OPERATING DATA REPORT DOCKET NO.
50-269 DATE 12/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567-OPERATING STATUS oconee 1 Notes
- 1. Unit Name:
Year-to-date and cumulative
- 2. Reporting Pedod: N2Y..cmber 1 - 10R6-hvanhor 10. tor 6
- 3. Licensed Thermal Power (MWt):
2568 capacity factors are calcu-934 lated using a weighted
- 4. Nameplate Rating (Gross MWe):
amage for ma&um 886
- 5. Design Electrical Rating (Net MWe):
dependable capacity.
- 6. Maximum Dependable Capacity (Gross MWe):
899
- 7. Maximum Dependable Capacity (Net MWe):
860 l
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
None I
- 9. Power Level To which Restricted. If Any (Net MWe):
Mnna
- 10. Reasons For Restrictions,if Any:
l i
. This Month Yr.-to.Date
' Cumulative
- 11. Hours In Reporting Period 720.0 8 016.0 117 265.0
- 12. Number Of Hours Reactor Was Critical 720.0 5 204.6 85 650.9
- 13. Reactor Reserve Shutdown Hours
-~
-~
- 14. Hours Generator On Line 720.0 5 128.6 82 258.2
- 15. Unit Reserve Shutdown Hours i
- 16. Gross Thermal Energy Generated (MWH) 1 797 816 12 759 689 199 059 889
- 17. Gross Electrical Energy Generated (MWH) 628 410 4 398 900 69 145 740
- 18. Net Electrical Energy Generated (MWH) 599 437 4 166 387 65 564,[Qf__
'I
- 19. Unit Service Factor 100.0 64.0 70.2 100.0 64.0 70.2
- 20. Unit Availability Factor
~
- 21. Unit Capacity Factor (Using MDC Net) 96.8 60.4 64.9
- 22. Unit Capacity Factor (Using DER Net) 94.0 58.7 63.1 0.0 15.5 14.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each L j
None 2
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY 4
INITIAL ELECTRICITY CO\\lMERCIAL OPERATION 4
8612220213 861215 I
gDR ADOCK 05000269 PDR
AVERAGE DAILY UNii PCWER LEVEL DOCKET NO 50-269 UNIT Oconee 1 DATE 3ecenter 15, !?86 COMPLETED J. A. Reavis TELEPHONE 704-:173-7567 MONTH N0'vEMBER,1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERASE DAILY POWER LEVEL (MWE-Net)
(MWE-Net) 1 840 17 830 2
840 18 829 3
839 19 827 4
840 20 828 5
039 21 829 6
837 22 831 7
836 23 831 8
836 24 831 9
835 25 830 10 835 26 829 11 835 27 828 12 834 28 828 13 834 29 827
=
14 833 30 828 15 832 31 16 826 i
l i
l l
l l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-269 UNIT NAME oconee 1 DATE 12/15/86 REPORT M) NTH November 1986 COMPLETED BY J. A. Reavis TELEPHONE (704) 373-7567
s.
O
'g,,y License i
y Cause & Corrective-cS7 "c
ofE NO.
Date
%h yy, Event
& r g
gm, Action to o-y, S
5E E
YS$
AB 8%
H o-ce zmo Report #
mo av' Prevent Recurrence 66-p 86-11-01 F
A CH HTEXCH High Steam Generator Levels 67-p 86-11-16 F
A HC PIPEXX Water in Vacuum Lines 68-p 86-11-16 F
A CH HTEXCH High Steam Generator Levels 1
2 3
4 Reason:
Method:
Exhibit G - Instructions S
uled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0151)
E-Operator Training 4 License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
(9/77)
-t DOCKET NO:
50-269 UNIT:
Oconee 1 DATE:
12/15/86 NARRATIVE
SUMMARY
Month:
November 1986 Oconee Unit 1 operated between 98% and 99% for.the entire month of November.
The unit is limited by high steam generator levels.
e e
1
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Oconee, Unit 1 2.
Scheduled next refueling shutdown: August, 1987 3.
Scheduled restart following refueling:
October, 1987 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?
Technical Specification Revision If ne, has reload design and core configuration been reviewed by Safety Review Committee regarding unrsviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
980*
8.
Present licensed fuel pool capacity:
1312 Size of requested or planned incressa:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 DUKE POWER COMPANY DATE: December 15, 1986 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
- Represents the combined total for Units 1 and 2.
l OPERATING DATA REPORT DOCKET NO.
50-270 DATE 12/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS Oconee 2 Notes
- 1. Unit Name:
- 2. Reporting Period: November l, 1986-November 30, 1986 Year-to-date and cumulative
- 3. Licensed Thermal Power (MWt):
25M capacity factors are calcu-
- 4. Nameplate Rating (Gross MWe):
934 lated using a weighted
- 5. Design Electrical Rating (Net MWe):
886 average for maximum
- 6. Maximum Dependable Capacity (Gross MWe):
899 dependable capacity.
860
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
1 None 1
- 9. Power Level To Which Restricted. lf Any (Net MWe):
None
- 10. Reasons For Restrictions. lf Any:
This Month Yr to.Date Cumulative II. Hours in Reporting Period 720.0 8 016.0 107 185.0
- 12. Number Of Hours Reactor Was Critical 720.0 6 509.6 79 347.2
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 720.0 6 427.6 78 029.1
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 750 968 16 193 191 186 597 094
- 17. Gross Electrical Energy Generated (MWH) 612 270 5 496 240 63 548 581
- 18. Net Electrical Energy Generated (MWH) 585 649 5 243 761 60 411 322
- 19. Unit Service Factor 100.0 80.2 72.8
- 20. Unit Availability Factor 100.0 80.2 72.8
- 21. Unit Capacity Factor (Using MDC Net) 94.6 76.1 65.4
- 22. Unit Capacity Factor (Using DER Net) 91.8 73.8 63.6
- 23. Unit Forced Outage Rate 0.0 0.8 12.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achiesed l
INITI A L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (9/77 )
AVERABE DAILY UNIT POWER LEVEL DOCKET NO 50-270 UNIT Oconee 2 DATE December 15, 1986 COMPLETED J. A. Reavis TELEPHONE 704-373-7567 MONTH NOVEMBER,1986 DAY AVERABE DAILY POWER LEVEL EAY AVERA8E DAILY POWER LEVEL (MWE-Net)
(MWE-Neti 1
812 17 811 2
815 18 811 3
814 19 812 4
812 20 817 5
813 21 816 6
815 22 817 7
816 23 816 8
816 24 815 9
816 25 813 10 816 26 817 11 814 27 821 12 810 28 821
.13.
812 29 821 14 811 30 778 15 810 31 16 811 t
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-270 UNIT NAME oconee 2 DATE 12/15/86 REPORT MONTH November 1986
- 0MPLETED BY J. A. Reavis K
TELEPHONE l
o o o,y License y
Cause & Corrective e37 "c
oSe
=
No.
Date
~.
%h g
3g Event b,
h Action to usE a
'o e
.m gy N 55 E
EdiS Report #
8?O uO Prevent Recurrence 65-p 86-11-01 F
A CH HTEXCH High Steam Generator Level 66-p 86-11-25 S
B CC VALVEX Control and Stop Valve PT's 67-p 86-11-25 F
A CH HTEXCH High Steam Generator Levels 68-p 86-11-30 S
F ZZ ZZZZZZ Decreased for Dispatcher Request I
l 1
2 3
4
)
Reason:
Method:
Exhibit G - Instructions S Sc e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensco C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 6 License Examination F-Administrative S
G-Operational Error (Explain)
Exhibit I - Same Source li-Other (Explain)
(9/77)
,_=
DOCKET NO: 50-270 UNIT: Oconee 2 DATE: 12/15/86
^
NARRATIVE
SUMMARY
Month: November 1986 Oconee Unit 2 operated at 95% power for the entire month of November.
The unit is limited by high steam generator levels.
p i
r 1
1 i
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Oconee, Unit 2 2.
Scheduled nsxt refueling shutdown: December, 1987 3.
Scheduled' restart following refueling: March, 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuratien been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
980*
8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 DUKE POWER COMPANY DATE: December 15, 1986 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
- Represents the combined total for U its I and 2.
n
_.,-.,.,4
.,,_,-,-9
_...-.,,-------,_-----,,-v-.--..~_.__4
OPERATLNG DATA REPORT DOCKET NO.
50-287 DATE 12-15-86 COMPLETED BY _ J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS 4
l
- 1. Unit Name:
oconee 3 Notes
- 2. Reporting Period:. Novomber 1.
I986-November 30. 1986 Year-to-date and cumulative
- 3. Licensed Thermal Power (MWt):
2568 capacity factors are calcu-
- 4. Nameplate Rating (Gross 31We):
934 lated using a weighted
- 5. Design Electrical Rating (Net 31We):
886 average for maximum
- 6. Staximum Dependable Capacity (Gross MWe):
899 dependable capacity.
4
- 7. Maximum Dependable Capacity (Net 31We):
860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted.If Any(Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to Date Cumulative i1. Hours In Reporting Period 720.0 8 016.0 104 832.0
- 12. Number Of Hours Reactor Was Critical 720.0 7 432.4 76 803.8 j
- 13. Reactor Reserve Shutdown Houis i
- 14. Hours Generator On Line 720.0 7 381.I 75 513.6
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Genersted (SIWH) 1 365 768 18 042 776 184 711 222
- 17. Gross Electrical Energy Generated (MWH) 453 840 6 102 230 63 630 284
- 18. Net Electrical Energy Generated (MWH) 432 751 5 826 507 60 605 864
- 19. Unit Service Factor 100.0 92.1 72.0-
- 20. Unit Availability Factor 100.0 92.I 72.0
- 21. Unit Capacity Factor (Using MDC Net) 69.9 84.5 67.I
- 22. Unit Capacity Factor (Using DER Net) 67.8 82.0 65.3
(
- 23. Unit Forced Outage Rate 0.0 7.9 13.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refueline - February 25, 1987 - 10 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY CO\\lMERCIA L OPERATION (0/77 )
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-287 UNIT Oconee 3 DATE December 15,1986 COMPLETED J. A. Reavis TELEPHONE 704-373-7567 MONTH ND'KMBER, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWE-Net) 1 601 17 602 2
599 18 600 L
l 3
601 19 600 4
605 20 600 3
607 21 601 6
604 22 600
...~
7 604 23 599 8
604 24 600 1
9 602 25 600 10 601 26 599 600 27 599 12 601 28 599 13 601 29 599 14 600 30 599 15 601 31 16 603 l
l
________._____._m
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-287 -
UNIT NAME oconee 3 DATE 12/15/86 REPORT M) NTH November, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_
O O c,,y License g
Cause & Corrective c87 "c
m.c a h'
h Action to v
e No.
Date yy jg Event o
5E E
%5b E3 8i H
o-a:
zmo Report #
mo uo Prevent Recurrence 38-p 86-11-01 F
A CH HTEXCH High Steam Generator Level 1
2 3
4 Reason:
Method:
Exhibit G - Instructions Fo 3 Sc e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 4 License Examination i
F-Administrative 5
l G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain) l (9/77)
T
DOCKET NO: 50-287 UNIT: Oconee 3 DATE:
12/15/86 NARRATIVE
SUMMARY
Month: November 1986 Oconee Unit 3 operated at 72% power for the entire month of November.
The unit is limited'in power because one Reactor Coolant pump has been taken out of service.
?
MONTHLY REFUELING INFORMATION REQUEST
-1.
Facility name: Oconee, Unit 3 2.
Scheduled next refueling shutdown: February, 1987 3.
Scheduled restart following refueling:
May, 1987 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
- 5. ~ Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool.: 469 8.
Present licensed fuel pool capacity: 875 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 DUKE POWER COMPANY DATE: December 15, 1986 Name of
Contact:
J. A. Reavis Phone: 704-373-7567 1