ML20210C228

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1986
ML20210C228
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/31/1986
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8609180290
Download: ML20210C228 (19)


Text

OPERATLNG DATA REPORT e DOCKET NO. 50-269 DATE 9-15-86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS OC "** 1 N***

1. Unit Name: Year-to-date and cumulative 1QAA_Anonne 11. 1ggg
2. Reporting Period: Anonne 1- capacity factors are calcu-2568'
3. Licensed Thermal Power (MWt): . lated using a weighted 934
4. Nameplate Rating (Gross MWe):

886 average for maximum

5. Design Electrical Rating (Net MWe): dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860
8. If Changes Occur in Capacity Rt.!ings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe): Nnna
10. Reasons For Restrictior.s. !f Any:

This Month Yr..to-Date Cumulative

!!. Hours in Reporting Period 744.0 5 831.0 115 080.0

' 12. Number Of Hour.; Reactor Was Critical 485.0 3 403.9 83 850.2

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 473.9 3 333.5 80 463.1

-- - ~ ~

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 172 856 8 292 593 194 592 793 397 900 2 861 580 67 608 420
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 374 170 2 705 995 64 104 244
19. Unit Service Factor 63.7 57.2 69.9
20. Unit Availability Factor 63.7 57.2 70.0

! 58.5 54.0 64.6

21. Unit Capacity Factor (Using MDC Net) 56.8 52.4 62.9

, 22. Unit Capacity Factor (Using DER Net)

23. Unit Forced Outage Rate 36.3 14.3 14.9
24. Shutdowns Scheduled Over Nest 6 Months (Type.Date,and Duration of Eacht:

- None i

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status tPrior o Commercial Operation): Forecast Achiesed I INITIA L CRITICALITY

! IN ilA L ELECTRICITY CO\lMERCIAL OPERATION I

I B609180290 860831 ggg73

! PDR ADOCK 05000269 PDR R

f' $

i

AYERACE DAILY UNIT POWER LEYEL DOCKET NO 50-269 UNIT Oconee 1 DATE 9/15/86 COMPLETED J. A. Reavis TELEPHONEh04-373-7567 MONTH August, 1986 DAY AVERAGE DAILY POWER LEYEL DAY AYERACE DAILY POWER LEVEL tMWE-NetI ---

INUE-Net 1 1 837 17 148 2 836 18 784 3 836 19 833

... =

4 835 20 832 5 811 21 833 6 224 22 832

. .. .......- .. .. =

7 0 23- 830 8 0 24 832 .

..... =,---

9 0 25 831 10 0 26 832 11 0 27 832 12 0 28 478 13 0 29 789 14 0 30 834 15 0 31 832

- 16 0

...= _...-

9 4

w

a+ .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-269 .

' UNIT NAME oconee 1 Page 1 of 2 DATE 9/15/86 REPORT MONTH August. 1986 COMPLETED BY J. A. Reavis TELEPHONE- 704-373-7567 "s.

O c O o,y License y Cause'& Corrective S7 "c v5$

  • g No. Date ~.a %h Lo 3

e

.g g c usz Event h wy gwg y

Action to N 56 E EdiS Report # &O $0 Prevent Recurrence .

34-p 86-08-05 S --

B -

CC VALVEX Turbine. Valve PT.!s 35-p 86-08-06 F --

A -

CC .HTEXCH Once Through Steam Generator Tube Leak-Indication-I 8 86-08-06 F 263.75 A 1 CC HTEXCH Steam Generator Tube Leaks i

36-p 86-08-17 F --

A -

HA TURBIN Main Turbine Bearing f6 Vibration 37-p 86-08-18 F --

A -

HH PUMPXX Put "E" Heater Drain Pump in Service 38-p 86-08-20 F --

A .

HH PUMPXX Trouble Shoot "E" Heater Drain Pump l 39-p 86-08-28 F --

H - HC xxxxxx Low Condenser Vacuum & Feedwater Swings l While Draining Heater from Air Ejector Lines 9 86-08-28 F 6.32 A 1 HA VALVEX Electro-Hydraulic Leak on Control Valve

  1. 3 40-p 86-08-29 S --

B - CC 'VALVEX Turbine Valve PT's

~41-p 86-08-29 F --

A -

HC XXXXXX Air Ejector Relief Valve Feilure to Re-Seat l 'h4 1 2 3 4.

Reason: Method: Exhibit G - Instructions S Sc eduled A-Equipment Failure (Explain) 1-Manual -for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator Training G License Examination F-Administrative S-G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain) 1

UNIT SHUTDOWNS AND' POWER REDUCTIONS DOCKET NO. 50-269 .

Page 2 of 2 UNIT NAME- oconee 1 DATE 9/15/86 REFORT MONTH August 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "sO e o e,$ License y Cause & Corrective 37 "cg v5E

  • N3. Date ~. yb ,gt;c Event h", h Action to R o-YE 8 %E5 RE 8E F oc :c w o Report # mo uo Prevent Recurrence ,

42-p 86-08-29 F --

A -

HH PUMPXX "lE2" Heater Drain Pump Trip 43-p 86-08-29 F --

A -

HC XXYYYY "A" Air Ejector Problems 1

1 i

)

I 1

.I_...____.

1 2- 3 4 Reason: Method: Exhibit G - Instructions SS led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

!!-Operator Training 6 License Examination i Lt:inist rat ire S C.-operational Error (Explain) Exhibit I - Same Source Il-Other (Explain)

DOCKET NO: 50-269 UNIT: Oconee 1 DATE: 9/15/86-NARRATIVE

SUMMARY

Month: August, 1986 Oconee Unit 1 began the month at 100% power. On 8/06 the unit came off line and

~

~

entered an outage to repair Steam Generator tubes. The unit returned to service on 8/18 after working on the Main Turbine's #6 bearing. The unit returned to 100% and operated at that level until 8/28. The Electro-Hydraulic Control system developed a leak which forced ~the unit off line. The leak was repaired, and the unit returned to service. On 8/29 Condenser Air Ejector problems slowed the increase to 100%. The unit was at 100% by 8/30, and remained there l throughout the end of the nonth.

_ . ._ _ -m .. .

i 5

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee, Unit 1
2. Scheduled next refueling.shutdcun: July, 1987
3. Scheduled restart folicwing refueling: September. 1987
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Constittee regarding unreviewed safety questions? N/A
5. Scheduled date(s) for submittiN proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, 4

significant changes in design or new operating procedures).

7. Number of fuel assemblies (a) in the core: 177-(b) in the spent fuel pool: 956*

.8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase:

9. Projected date of last refueling which can be accommodated by present licensed capacity: Augusc, 1991 DUKE POWER COMPANY DATE: September 15,1986 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

  • Represents the combined total for Units 1 and 2.

t

OPERATLNG DATA REPORT DOCKET NO. 50-270 DATE 9-15-86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS Oconee 2 Notes

1. Unit Name:
2. ReportingPeriod: Anount 1. 1986-Anount 31. 1986 Year-to-date and cumulative
3. Licensed Thermal Power (MWt):

NR capacity factors are calcu-

4. Nameplate Rating (Gross MWe): 934 lated using a weighted
5. Design Electrical Rating (Net MWe): 886 average for-maximum
6. Maximum Dependable Capacity (Gross MWe):

899 dependable capacity.

860

' 7. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

.None

9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions.If Any:

This Month Yr to.Date Cumulative

11. Hours in Reporting Period 744.0 5 831.0 los 000.0
12. Number Of Hours Reactor Was Critical 363.4 5 434.3 78 271.9
13. Reactor Reserve Shutdown Hours
14. Hours Generator'On.Line 360.3 5 408.0 77 009.5 15 Unit Reserse Shutdown Hours
16. Gross Thermal Enerly Generated (MWH) 904 752 13 775 983 184 179 AA6
17. Gross Electrical Energy Generated (MWH) 294 900 -4 660 430 62 712 771
18. Net Electrical Energy Cenerated (MWH) 278 012 4 453 937 59 621 498 l
19. Unit Service Factor 48.4 92.7 73.3
20. Unit Availability Factor 48.4 92.7 73.3
21. Unit Capacity Factor (Using MDC Net) 43.5 88.8 65.9
22. Unit Capacity Factor (Using DER Net) 42.2 86.2 64.1 0.0 0.7 13.0
23. Unit Forced Outage Rate l
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eachi:

Currently Refueline t h

October 15,1986
25. If Shut Down At End Of Report Period.Estirr.ated Date of Staitup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed 4

! INITIAL CRITICA LITY INITIA L ELECTRICITT COMMERCl %L OPER ATION 1

l

(4/77 )

4

- .. ,. c

, AYERACE DAILY UNIT P0d A LEVEL 00CKET NO 270 tMIT Otonee 2 DATE 9/15/86 COMPLETED J. A. Reavis TELEPHONE 704-373-7567 MONTH August, 1986 DAY AVERACE DAILY POWER LEYEL DAY AYERACE DAILY POWER LEYEL (MWE-Net 1 (MWE-Neti 1 814 17 0

........... .. ... . . (

2 815 18 9 3 815 19 0 4- 815 20 0 5 814 21 0 6 810 22 t 7 808 23 0 t

8 785 24 0  ;

............................. ....... -. . ~ .. ......

9 704 25 0 10' 596 26 0 11 810 27 0

........== ..... ......... . . . . . . - . . . . . . . - - - . +

12 811 28 0 13 793 29 0 14 786 30 0 15 723 31 0 16 0 l

e 1

1 4 L

i

,--.- ,, - , -- ,- - - -, ,e -+ -r.w-- - -- - - , - - - - - - --

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET P0. 59 'M0 -

UNIT NAME '- Oconee 2 _

DATE 9/15/86 REP 3RT MONTH Augus: t . 1936 COMPLETED BY J. A. Reavis _

i

. TELEPHONE 704-373-7567 _

I i '

3 c Img License y Cause & Corrective N

37 e v .5 0 *

  • I No. Date ~. %h

$ o~ 5S S

E 3gc

%E$

Event h

y,B h

g" Action to

  • - o: :c w o Report # mo oO Prevent Recurrence .

42-p 86-08-01 F --

A -

HB HTEXCH Second' Stage Reheater Valved Out 43-p 86-08-08 Y --

A -

HH PUMPXX Take of f "2D'!" Heater Drain Pump for Re pirs 44-p 86-08-08 F --

A -

HB HTEXCH Second Stage Reheater Valved Out 45-p 86-08-09 F --

A -

CH INSTRU Blown Fuse in Thrust Bearing Wear System Circuitry caused Feedwater Pump Trip 46-p 86-08-09 F --

A -

CH INSTRU Investigation of "2A" Feedwater Pump Trip Problem 47-p 86-08-10 F --

A -

CH INSTRU Blown Fuse in Thrust Bearing Wear System Circuitry Caused Feedwater Pump to Trip 48-p 86-08-10 F --

A -

CH INSTRU Investigation of "2A" Feedwater Pump Trip Problem 49-p 86-08-10 F -

A -

HB HTEXCH Second Stage Reheater Valved Out j 50-p 86-08-12 S -

F -

RC ZZZZZZ Core Coastdown j ;51-p 86-03-12 S --

F -

RC ZZZZZZ. Core Coastdown 52-p 86-08-13 S --

F -

RC ZZZZZZ, Core Coastdown

, 5 86-08-16 S 383.72. C 1 RC FUELXX ,

End of Cycle 8 Refueling Outage 1 2 3 4 Reason: Method:

A-Equipment Failure (Explain)

Exhibit G - Instructions

! S led 1-Manual for Preparation of Data B-Maintenance or Test ~ 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

E-Operator Training G Licence Examination File (NUREG-0161) i F-Adninistrative S G-Operational Error (Explain) Exhibit I - Same Source n o - -,

II-Other (Explain)

L DOCKET NO: '50-270 UNIT: Oconee 2 DATE: 9/15/86 NARRATIVE

SUMMARY

Month: August, 1986 -

Oconee Unit 2 began the month at 100% power. Power was reduced.to 87% on 8/08 to repair a Heater Drain pump valve. On 8/09 the "A" Feedwater pump tripped due to unknown causes which resulted in a runback to 40%. The unit had returned to 85% and the "A" Feedpump tripped again, causing a runback to 50%. The caused was identified as a Thrust Bearing Wear switch which had .

shorted. .The switch was replaced'and the unit returned to 100%. On 8/12 the unit began its Core Coastdown to refuel. The unit was' shutdown on 8/16 and entered its refueling outage.

i I

a f

i 4

k 4

, , ~ ~ , - _e.-_._.,...---- __.---y ,__m. v.---m, -nm+-,,..--... _ . r ,,,.,-- _.+.,-. - c__ . . _ _ . - _ _ - - , - , - v.

. ~ . . . _ _ .

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee, Unit 2
2. Scheduled next refueling shutdown: Currently Refueling
3. Scheduled restart following refueling: -
4. Will refueling or resumption'of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number cf fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 956*
8. Present licensed fuel pool capacity: 1,312 Size of requested or planned increase: -
9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 I

l l

l DUKE POWER COMPANY DATE: September 15,1986 l

Name of

Contact:

J. A. Reavis Phone: 704-373-7567 cRepresents the combined totals for Units 1 and 2.

l

\

f OPERATING DATA REPORT DOCKET NO. 50-287 DATE 9-15-86 CoalPLETED BY J.A. Reavis TELEPHONE 704-373-7507 OPERATING STATUS X. Unit Name: oconee 3 Notes

2. Reporting Period: August 1. 1986-August 31. 1986 Year-to-date and cumulative
3. Licensed Thermal Power (31Wt): 2568 capacity factors are calcu-
4. Nameplate Rating (Gross SIWE): 934 lated using a weighted
5. Design Electrical Rating (Net SIWE): 886 average for maximum
6. Maximum Dependable Capacity IGross alWe): 899 dependable capacity.
7. Maximum Dependable Capacity (Net SIWE): 860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To which Restricted.If Any(Net 31We):
10. Reasons For Restrictions.If Any:

This Stanth Yr to.Date Cumulative i

i II. Hours in Reporting Period 744.0 5 831.0 102 647.0

12. Number Of Hours Reactor Was Critical 744.0 5 827.8 75 199.2 l 13. Reactor Reserve Shutdown Hours --

i 14. Hours Generator On.Line 744.0 5 807.3 73 939.8

15. Unit Resene Shutdown Hours -
16. Gross Thermal Energy Generated (31WH) 1 888 416 14 620 976 181 289 422

.17. Gross Electrical Energy Generated (31WH) 616 780 4 976 160 62 504 214

18. Net Electrical Energy Generated (31WH) 588 082 4 762 007 59 541-364
19. Unit Service Factor 100.0 99.6 72.0
20. Unit Availability Factor 100.0 99.6 72.0
21. Unit Capacity Factor (Using MDC Net) 91.9 95.0 67.3
22. Unit Capacity Factor (Using DER Net) 89.2 92.2 65.5
23. Unit Forced Outage Rate 0.0 0.4 13.6
24. Shutdowns Scheduled Over Next 6 31onths (Type.Date,and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: -
26. Units in Test Status t Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY _

INITIA L ELECTRICITY CO\lNIERCIA L OPER ATION (0/77i

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-287 UNIT Oconee 3 WE ,,9/,{}/8,6,,,,

COMPLETED J. A. Reavis. -

TELEPHONE 704-373-7567 MONTH August, 1986 DAY AYERAGE DAILY POWER LEYEL DAY AYERAGE DAILY POWER LEYEL

--- IMWE-NetI ---

(MWE-Neti 1 581 17 791 2 803 18 793 3 804 19 799' 4 803 20 799 5 802 21 798

.- -=

6 801 22 799 7 802 23 791 8 000 24 797 9 800 25 799 10 798 26 800

..- = . .......

11 799 27 799 12 799 28 776 13 801 29 780 14 000 30 801 15 798 31 801 16 791 O

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-287 -

UNIT NAME oconee 3 DATE 9/15/86' REPORT MONTH' August, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.

O c o o,$ License y Cause & Corrective'

.2 7 "c y .c y a a2 No. Date ~

as n.

%5 s- O 8

no

.8 % c oaz Event k y

mo g,

eo-Action to N 55 E $d5S Report # #8 88 Prevent Recurrence .

21-p 86-08-01 F --

A -

CH- PUMPXX "3A" Feedwater Pump Repair (Pump Seals) 22-p. 86-08-23 F --

B -

HH FILTERS Condenser Circulating Water Pump Screen Cleaning

23-p 86-08-28 F --

A -

CH INSTRU "3A" Feedwater Pump Trip During Oil Trip Test (Unit Runback)-

24-p 86-08-28 S --

B -

CC VALVEX Turbine Valve PT's m-1 2 3 4 Reason: Method:

A-Equipment Failure (Explain)

Exhibit G - Instructions SScfeuled 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

E-Operator Training 6 License Examination File. (NUREG-0161)

F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source li-Other (Explain)

'O /*7 7)

DOC'KET NO: 50-287 UNIT: Oconee 3 DATE: 9/15/86 NARRATIVE

SUMMARY

- Month: August 1986 Oconee Unit 3 began the month at_55% power, while repairing the "A" Feedpump Seal Injection line. -The unit returned to 100% and operated at that level until 8/28. A runback occurred when the "A" Feedpump tripped during a performance test. The unit returned to 100% and operated at that level for the balance of, the month.

I t

I t

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee. Unit 3
2. Scheduled next refueling shutdown: February, 1987
3. Scheduled restart following refueling: April, 1987
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

~

i

7. Number of fuel assemblies (a)- in the core: 177 l (b) in the spent fuel pool: 469
8. Present licensed fuel pool capacity: 875 Size of requested or planned increase: ---

l 9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 l

September 15,1986 DUKE POWER COMPANY DATE:

l Name of

Contact:

J. A. Reavis Phone: 704-373-7567 l

l l

1

. 3 OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT

1. Personnel Exposure For'the month of July, no individuals exceeded.10 percent of their allowable annual radiation dose limit.
2. The total station. liquid release for July has been compared with the Technical Specifications maximum annual dose connitment and was less

- than 10 percent of this limit.

The total station gaseous release for July has been compared with the Technical Specifications maximum annual dose connitment and was less than 10 percent of.this limit.

i DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE, N.C. 28949 HALH. TUCKER TEMPHONE (704) 373-4531 September 15, 1986 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission Washington, D.C. 20555 ATTENTION: Document Control Desk Re: Oconee Nuclear Station Docket No. 50-269, 50-270,'and 50-287

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of August,1986.

Very truly yours, gb .

Hal B. Tucker JAR /04/V3/jgm Attachment

xc
Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Connission - Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 l Mr. Phil Ross 1

U.S. Nuclear Regulatory Commission MNBB-5715 Washington, D.C. 20555 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue 7M Farmington, CT 06032 9

I/ i

\

Director September 13,1986 ,

Page Two xc: INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30323 Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 Ms. Helen Pastis, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. J. C. Bryant

) NRC Senior Resident Inspector Oconee Nuclear Station l

e 1

l W

i I