ML20106E409
| ML20106E409 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/30/1984 |
| From: | Reavis J, Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8410290213 | |
| Download: ML20106E409 (17) | |
Text
c
,e OPERATING DATA REPORT '
DOCKET NO.
50-269 DATE 10-15-84 C051PLETED BY J.A.
Reavis-TELEPHONE 704-373-7567 L
OPERATING STATUS Oconee 1-Notes t
- 1. Unit Name:
'2. Reporting Period: September 1,1984-September 30,19E4 Year-to-date and cumulative 3.1.icensed Thermal Power (MWt):
2568 capacity factors are calcu-934-
.-lated using a weighted-
- 4. Nameplate Rating (Gross alWe):
average for maximunt 886
- 5. Design Electrical Rating (Net MWe):
dependable capacity.
- 6. Maximum Dependable Capacity (Gross MWe):
899
- 7. Maximum Dependable Capacity (Net MWe):
860
~ 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Pow:er Level To Which Restricted. If Any (Net MWe):
n-
- 10. Reasons For Restrictions.If Any:
This Month Yr. to.Date Cumulative
!!. Hours in Reporting Period 720.0 6 575.0 98 280.0
- 12. Number Of Hours Reactor Was Critical 720.0 6 550.L 71 090.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 720.0 6 542.1
'67'931.4
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (51WH) 1 853 273-16 773 666 163 071 698
- 17. Gross Electrical Energy Generated (MWH) 635 81o s' asa inn 56 722 530
- 18. Net Electrical Energy Generated (MWH) 606 279 5 596 927 53 762 478
- 19. Unit Service Factor 100.0 99.5 69.1 100.0 99.5 69.2
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 97.9 99.0 63.3-
- 22. Unit Capacity Factor (Using DER Net) 95.0
'96.1 61.7
- 23. Unit Forced Outage Rate 0.0 0.5 16.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
[
Refueling - October 5, 1984 - 7 Weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
.6. Units in Test Status t Prior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION i
I h
R PDR
[
TC 284 Y
.. - ~ _ -
.w
-- -, ~ +.
,---y+-=--.-e.smne y
i
+3~
~
~
y '...
AVERAGE-DAILY UNIT! POWER LEVEL
'50-269
/>
-DOCKET NO.
Oconee 1
^
UNIT-DATE -10/15/84
'C0KPLETED BY J. A. Reavis 3
TELEPHONE-704-373-7567-s MONTH September, 1984L
- DAY..
AVERAG D LY OWER LEVEL DAY
- AVERAGE DAILY POWER LEVEL
- (MWe-Ne t).
'1
-845 17' 842 12-845-18' 842 3'
844 39-842 4
843 20; 842 5
844 21 842 6
844 22 840' 7
845 23 842 8
826 24 843' 9
843 25 842 10 842-26-841 11 842 27 842 12 842 28 843 13 842 29 843 14 841 30 844 15 841 31
- 16 842 L
i INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day In the reporting month.
Compute to the nearest whole megawatt.
l O
,.Ie
,,.y..,...~.r,,-
+w.<.
-w.-,
,.,.,..,.,,,+,..,m.-
k UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-269 UNIT NAME oconee i DATE' 10/15/84 REPORT MONTH SEPTEMBER, 1984 COMPLETED BY J.' A. Reavis_'
-TELEPHONE 704-373-7567.
"s_
O
'a enj License y
Cause'& Corrective--
cS7 "c
v5g a
e No.
Date
~.
%h a3, Event je,
,&n, Action to o
+R he a
tER g=
a" o-
=
xmo Report #
mO oO Prevent Recurrence 15-p 84-09-08 S
B CC VALVEX Turbano control.& stop valve novement.
PT's-16-p 84-09-22 F
A HH PUMPXX Heater Drain Pump oil' System Repairs-1 2
3 4
Reason:
Method:
Edlibit G - Instructions SS duled A-Equipment Failure (Explain)'
1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 4 License Examination F-Administrative S
G-Operational Error (Explain)
Exhibit I - Same Source
- II-Other (Explain) 9/77)
a Mr-
+4 re+
4 M
L.
1
- 2-s,
+-
DOCKET NO:- 269-t UNIT:
oconee 1 DATE:
10/15/84
' NARRATIVE SUbHARY '
- Month: September'1984 '
'. The unit operated at 100% except for a Turbine Control:PT. The unit also
- repaired an oil leak on one of its Heater Drain Tank Pumps.
t 4
9 I
t t
I, l
i-
~
L f
' [
p.
MONTHLY REFUELING INFORMATION REQUEST Y,'
r El.'; Facility name:
Oconee Unit-1 October 1984
- 2. : Scheduled next refueling shutdown:
November 1984
'- 3'. Scheduled restart following refueling:
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1, j
l I
1 i
7.
Number of fuel assemblies (a) in the core:
177 t
(b) in the spent fuel pool:
1032*
i 8.
Present licensed fuel pool capacity:
1312 i
Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 1991 f
DUKE POWER COMPANY Date: October 15, 1984 l
Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined total for Units 1 and 2.
T:
OPERATING DATA REPORT I
DOCKET NO.
50-270 DATE 10-15-84 C051PLETED BY J.A. Reavis OPERATING STATUS
- 1. Unit Name:
Oconee 2 Notes
'2. Reporting Period: September 1, 1984-September 30, 198L Year-to-date and cumulative
- 3. Licensed Thermal Power 151Wt):
2569 capacity factors are calcu-
- 4. Nameplate Rating (Gross SIWE):
934 lated using a weighted
- 5. Design Electrical Rating (' et 31We):
886-N average for maximum
. 6. Siaximum Dependable Capacity (Gross 51We):
899 dependable capacity.
860
- 7. Slaximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None i
- 9. Power Level To Which Restricted.If Any (Net 31We):
None
- 10. Reasons For Restrictions. !f Any:
This 51onth Yr. to Date' Cumulative
.11. Hours in Reporting Period 720.0 6 575.0 88 200.0
- 12. Number Of Hours Reactor Was Critical 720.0 6 575.0 63 888.5
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 720.0 6 579.0
'69 71s.2
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (51WH) 1 790 166 16 773 663 149 264 330
- 17. Gross Electrical Energy Generated (SIWH) 601 320 5 758 650 50 863 506
- 18. Net Electrical Energy Generated (51WH) 573 566 5 517 761 4R 179 110
- 19. Unit Service Factor 100.0 100.0 71.1
- 20. Unit Availability Factor 100.0 100.0 71.1
- 21. Unit Capacity Factor (Using SIDC Net) 92.6 07.6 61.5
- 22. Unit Capacity Factor (Using DER Net) 89.9 94.7 61.9
- 23. Unit Forced Outage Rate 0.0 0.0 15.0
- 24. Shutdowns Scheduled Over Nest 6 51onths (Type.Date,and Duration of Each1:
Refueling - February 24, 1985 - 9 Weeks t
I i
- 25. If Shut Down At End Of Report Period. Estimated Dxe of Startup:
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achiesed 1
{
INITIAL CRITICALITY INITIA L ELECTRICITY CONistERCIAL OPERAT10N l
(9/77) i
Y AVERAGE DAILY UNIT POWER LEVEL 50-270 DOCKET NO. _
UNIT Ocnnee 2 DATE 10/15/84 COMPLETED BY J.A. Reavis TELEPHONE __704-373-7567 MONTH September, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t) 1 556 17 823 2
678 18 823 3
801 19 823 4
825 20 823 5
503 21 823 6
768 22 823 7
825 23 824 8
825 24 823 9
824 25 823 10 824 26 823 11 824 27 824 12 824 28 824 13 823 29 823 14 823 30 825 15 822 31 16 823 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
+.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-270 UNIT NAME oconee 2 DATE 10/15/84 REPORT MONTH September 1984 COMPLETED BY J. A. Reavis TELEPHONE - 704-373-7567 "s_o t en$
License y
Cause & Corrective-eS7 "c
u." #
a e
No.
Date
~.
%h g
jgc Event 5e g
Action to y,
R he a
tER gE g=
H o~
a:
xmo Report #
mu oO Prevent Recurrence 13-p 84-09-01 F
A CH PUMPXX Main Feedwater Pump Repairs 14-p 84-09-01 S
F ZZ ZZZZZZ Economic Dispatch Reduction 15-p 84-09-05 F
A IHI PIPEXX Repair Heater Bleed Line u- _
1 2
3 4
Reason:
Method:
Exhibit G - Instructions S Sc uled A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER).
D-Regulatory Restriction 4-Other (Explain)
File' (NUREG-0161)
E-Operator Training 4 License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I'- Same Source li-Other (Explain)
- )/771
r dOCKETNO: 270 UNIT:
oconee 2
'DATE:
10/15/84 NARRATIVE
SUMMARY
Month:
September, 1984 l
' This unit ran at 100% except for a reduction to 51% power on September 1, for l
feedwater pump repairs followed by Economic Dispatch at 86% and a reduction to j.
25% power on September 5, to repair a Heater Bleed line, t
L i
o
' MONTHLY REFUELING'INFORMATION REQUEST 1.
Facil'ity name:'
Oconee Unit.2
~2.
Scheduled next refueling shutdown:
February, 1985
[
~
3 p
- 3.. Scheduled restart.following refueling:
April.1985 4$.Willrefuelingorresumptionofoperationthereafterrequireatechnical specification change or other license amendment? Yes-If,yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by. Safety.
Review Committee regarding unreviewed safety questiona?
N/A 5.
Scheduled date(s)/Afor submitting proposed licensing action and supporting information:
N 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
l 7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pools 1032*
l l
- 8..Present licensed fuel pool capacity:
1312
[
Size of requested or planned increase 9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 1991 DUKE POWER COMPANY Date: October 15, 1984 Name of
Contact:
J. A. Reavis Phones 704-373-7567
- Represents the combined total for Units 1 and 2.
1.
- - - ~
i f
OPERATING DATA REPORT DOCKET NO.
50-287 DATE m-15 CO31PLETED BY J.A-Reavis TELEPilONE 704-373-7567 OPERATING STATUS
- 1. Unit Name:
oconee 3 Notes
- 2. Reporting Period: September 1,1984-September 30, 1982 Year-to-date and cumulative
- 3. Licensed Thermal Power p!Wt):
2568 capacity factors are calcu-
- 4. Nameplate Rating (Gross. lWe):
934 lated using a weighted
\\
886 a m age for ma & um S. Design Electrical Rating (Net SIWE):
899 dependable capacity.
- 6. Staximum Dependable Capacity (Gross SIWE):
- 7. Maximum Dependable Capacity (Net 31We):
860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted if Any (Net 51We):
- 10. Reasons For Restrictions.lf Any:
This.\\lonth Yr..to Date Cumulative 720.0 6 575.0 85 847.0
- 11. Hours in Reporting Period
- 12. Number Of Houn Reactor Was Critical 720.0 4 625.6 61 336.5
- 13. Reactor Resene Shutdown Hours
~~
-~
~~
- 14. Hours Generator On.Line 720.0 4 587.4 60 170.0
~~
~~
~~
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (alWH) 1 848 705 11 485 108 M 6 977 672
- 17. Gross Electrical Energy Generated plWH) 631 820 3 956 390 50 770 984 604 146 3 775 477 48 342 595
- 18. Net Electrical Energy Generated ($1WH)
- 19. Unit Service Factor 100.0 69.8 70.1 100.0 69.8 70.1
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using 31DC Net) 97.6 66.8 65.3 94.7 64.8 63.6
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 1.8 14.'4
- 24. Shutdowns Scheduled Oser Nest 6 Sionths(Type. Ihte.and Duration of Each1:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status irrior io Commercial Operation):
Forecast Achiesed INITI \\L CRITICALITY INITIAL ELECTRICITY C0\\l\\lERCI AL OPER ATION (0/77 )
1
.-.-_.. ~
m-
- 7. 7 i:
AVERAGE: DAILY UNIT P'0WER' LEVEL' 2.
DOCKET NO.
50-287
' UNIT Oconee 3 DATE ' 10/15/84
' COMPLETED BY-J.A. Reavis TELEPHONE 704-373-7567 HONTH September, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AV'ERAGE DAILY' POWER LEVEL (MWe-Ne t)
(MWe-Ne t) 1 842 17 840 2
843 18 839 3
842 19 839 4
840 20 839 5
840 21 840 6
841 22 840 7
841 23 840 8
840 24 839 9
840 25 839 10 838 26 839 11 839 27 839 12 840 28 840 13 839 29 841 14 838 30 841 15 817 31 16 839 INSTRUCTIONS On this format, 11st the average daily unit power level in MWe-Net for each day in-the reporting month. Compute to the nearest whole megawatt.
O
m UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-287-UNIT NAME-oconee 3 DATE 10/15/84 REPORT PONTH September 1984
- COMPLETED BY J. A. Reavis-
"s.
TELEPHONE. 704-373-7567 o
o o,$
License y
Cause & Corrective e32 "e
o3E m
o No.
Date
%h g
gc Event
,Be, h
Action to
~ o o.
s-o
.o o s 3:
..o N 56 E
$5S Report #
&O bb Prevent Recurrence 13-p 84-09-15 S
B CC VALVEX Control & Stop Valve Movement PT's I
1 2
3 4
Reason:
Method:
Exhibit G - Instructions
[
A-Equipment Failure (Explain) 1-Manual
.for Preparation of Data 1ed B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report-(LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 4 License Examination F-Ahinistrative 5
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain) nrrn
)
~
+
J
- LOCKET NO: 50-287
. UNIT: Oconee 3 DATE:_10/15/84 NARRATIVE
SUMMARY
l Month: September 1984 The ~ unit operated at 100%' except for a reduction to 85% for turbine control PT on September 15.
i l
l l
l i
I' L._
-~
a MONTHLY REFUELING INFORMATION REQUEST 1.
Facility.name:
Oconee. Unit 3 2.
Scheduled.next refueling shutdown: September,1985
-3.
Scheduled restart following refueling:
November 1985
- 4. !W111 refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, What will these be?
Technical Specification Revision Elf no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A Scheduled date(s)/Afor submitting proposed licensing action and supporting 5.
information:
N 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fual pool:
158 8.
Present licensed fuel pool capacity:
825 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 1991 DUKE POWER COMPANY Date: October 15, 1984 Name of
Contact:
J. A. Reavis Phone: 704-373-7567 I
u'^
4'
+
OCONEE NUCLEAR' STATION Monthly Operating Status Report-l'.
' Personnel ~ Exposure
'For the' month of August, n' individual (s) exceeded.10 percent of-their allowable annual radiation dose limit.
2.. The' total station liquid release for August has been compared with the Technical Specifications maximum annual dose commitment.and was less than 10 percent of this limit.
'The total station gaseous release for August has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
I s
0 4
L-_
s DumE POWER GOMPANY P.O. BOX 33189 CHARLOTTE. M.C. 28949 trALn. m m October 15, 1984 vws,ames===v -
(704)373-453:
.wo.,-
s Director Office of Inspection and Enforcement-U. S. Nuclear Regulatory Commission Washington,'D. C.)-20555 Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287 s
s
Dear Sir:
i Picase find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of September, 1984.
Very truly yours.
Hal B. Tucker JAR:scs Attachments cc: Regional Administrator 1 American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region 11 The Exchange, Suite 245 101 Marietta Street, FW,' Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 '
Farmington, Connecticut 06032 Mr. Phil Ross Ms. Helen Nicolaras, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation HNBB-5715 U. S. Nucicar Regulatory Commission Washington, D. C.
20555 Washington, D. C.
20555 Senior Resident Inspector INPO Records Center Oconee Nuclear Station Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 Ms. Judy Dovers Nucicar Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 p$
Y is m
.