ML19317E600

From kanterella
Jump to navigation Jump to search
Corrected Page to Monthly Operating Rept for Dec 1976
ML19317E600
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/10/1977
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E588 List:
References
NUDOCS 7912180802
Download: ML19317E600 (1)


Text

.

O CORRECTED COPY UNIT Oconte Unit 2 DATE 3/10/77 DOCKET NO. 50-270 PREPARED BY L. J. Bare OPERATING STATUS

1. REPORTING PERIOD: December 1 THROUGH December 31, 1976 GROSS HOURS IN REPORTING PERIOD: 744.0
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
4. REASONS FOR RESTRICTION (IF ANY)
5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 256.2 5668.0 14227.0
6. REACTOR RESERVE SHUTDOWN HOURS - - -
7. HOURS GENERATOR ON-LINE 238.1 5486.1 13765.5
8. UNIT RESERVE SHUTDOWN HOURS - - -
9. GROSS THERMAL ENERGY GENERATED (MWH) 564375* 13088834* 32761262*
10. GROSS ELECTRICAL ENERGY GENERATED

()ST) 188470 4455050 11155606

11. NET ELECTRICAL ENERGY GENERATED (tsm) 175677 4228972 10584123
12. REACTOR SERVICE FACTOR 34.4 64.5 70.2
13. REACTOR AVAILABILITY FACTOR 32.0 62.8 68.4
14. UNIT SERVICE FACTOR 32.0 62.5 67.9
15. UNIT AV^.ILABILITY FACTOR 32.0 62.5 67.9
16. UNIT CAPACITY FACTOR (Using Net 27.1 55.3 59.9 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 26.6 54.3 58.8
18. UNIT FORCED OUTAGE RATE 68.0 25.9 25.4
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA1. X 100 110URS IN REPORTING PEh10D REACTOR AVAILABILIIT FACTOR = HOURS RTACTOR UAS AVAIIABl.r. TO OPERATE X 100 110URS IN REFORTING PERIOD UNIT SERVICE TACTO:: = HOPPS CEEERAT09. ON LINF.

X 100 HOURS IN R.CPORTING PERIOD UNIT AVAILABILITY FACTOR = 1100RS UNIT WAS AVA11ALI.E TO GENERATE HOURS IN REP 0kTING PERIOD UNIT CAPACITY FACTOR = NET ELE ('TRICAL P0hER CI.NERATED 31 0

[Nst Capability or Desir,n (Mwc-Net)'.) X 1100RS IN RthTM.

PERIOD UNIT FORCED OUTACE RATE - FonCED OUTAGE HOURS X 100 HOURS GENEPATOR ON 1.JNE + FORCED OUTAGE HOUls5

_ . _ .