ML20204B924
| ML20204B924 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/31/1987 |
| From: | Reavis J DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20204B860 | List: |
| References | |
| NUDOCS 8703250180 | |
| Download: ML20204B924 (2) | |
Text
_
- o R:vicion 1
- 1 OPERATING DATA REPORT DOCKET NO.
50-269 DATE 02-16-87 COMPLETED BY
.7 A - Reavis TELEPHONE 704-373-7567 OPERATING STATUS e
OC "** 1 N*
- 1. Unit Names
- 2. Reporting Period: January 1. 1987-Ja min rv 31. 1987 Year-to-date and cumulative 2568 capacity factors are calcu-
- 3. Licensed Thermal Power (MWt):
934 lated using a weighted
- 4. Nameplate Rating (Gross MWe):
average for maximum 886
- 5. Design Electrical Rating (Net MWe):
dependable capacity.
- 6. Maximum Dependable Capacity (Gross MWe):
899 860
- 7. Maximum Dependable Capacity (Net MWe);
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
l None
- 9. Power Level To which Restricted. If Any (Net MWel:
ha
- 10. Reasons For Restrictions.lf Any:
j j
l l
This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period 744,0 744.0
- 118 753.0
- 12. Number Of Hours Reactor Was Critical 744.0 744.0 87 138.9
- 13. Reacter R tserve Shutdown Hours
- 14. New Wa erator On.Line 744.0 744.0 83 746.1 IS. Unit Rea<m Shutdown Hours j'
- 16. Gross Thermal Energy Generated (MWH) 1 838 472 1 838 472 202 764 577
- 17. Gruss sicctrical Energy Generated (MWH)
- 636 110 636 110 70 429 980 607 430 607 430
_ 66 790 474
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 100.0 100.0 70.5
- 20. Unit Availability Factor 100.0 100.0 70.6 L.
- 21. Unit Capacity Factor (Usmg MDC Net) 94.9 94.9 65.3 92.2 92.2 63.5 f
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 14.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
_ Refueling-July 28,1987-10 weeks
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units In Test Status a Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8703250180 870313 (o/7; >
PDR ADOCK 05000269 R
PDR c
.,--+-.._,2.
own..-.y--y
--,w-..,.,_.
-.---,.,.-p.,.--.v..,
.. -,..,.,.-g
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-270 UNIY NAME OCONEE 2 DATE O 2/13/87 REPORT MONTH January COMPLETED BY GERALD REAVIS TELEPHONE (704)-373-7567 0 Revision 1 l
l MET-R HDD l
E OF l
lT A
SHU-l LICENSE l
N Y
S TING EVENT SYS-CAUSE AND CORRECTIVE D
P DURATION. O DOWN REPORT TEM COMPONENT ACTION TO DATE T
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE l l-p 87-1-
1 F l A
CH HTEXCH l HIGH STEAM GENERATOR LEVEL
)
l l
'I 87-1-18 F l 14.93 A
1 CH HTEXCH LOOSE PARTS MONITOR NOISE INVESTIGA-TION AT TOP OF STEAM GENERATOR l
l 2 87-1-18 F
11.55 H
3 HB TURBIN FEEDWATER SWING & TURDINE CONTACT l
BUFFER HAD NOT BEEN RESET l
l l
l 2-p 87-1-19 F
F RB l CONROD HOLD AT 63% POWER DUE TO ROD l
WITHDRAWAL LIMITS I
3-p 87-1-19 F
A CH l HTEXCH HIGH STEAM GENERATOR LEVEL l
IIB XXXXXX High Feedwater Flow
- 4-0 87-1-26 F
A I
I
/
l l
1 2'
3 4
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For License C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restr ic t ion 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination 5
F-Administrative G-Operator Error (Explain)
Exhibit I - Same Source it-Other (Emplain)