ML19317E598
| ML19317E598 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/10/1977 |
| From: | Bare L DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19317E588 | List: |
| References | |
| NUDOCS 7912180800 | |
| Download: ML19317E598 (1) | |
Text
'
CCORRECTED COPY Ocon:2 Unit 2 gy DATE 3/10/77 DOCFET NO.
50-270 PREPARED BY L. J. Bare OPERATING STATUS 1.
REPORTING PERIOD: January 1 THROUGH January 31. 1977 GROSS HOURS IN REPORTING PERIOD:
744.0 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
860 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
REASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative 5.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 744.0 14971.0 6.
REACTOR RESERVE SHUTDOWN HOURS 7.
HOURS GENERATOR ON-LINE 744.0 744.0 14509.54 8.
UNIT RESERVE SHUTDOWN HOURS 9.
GROSS THERMAL ENERGY GENERATED (MWH) 19'6321 1916321 34677583*
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 652990 652990 11808696 11.
NET ELECTRICAL ENERGY GENERATED (MWH) 626360 626360 11210483 12.
REACTOR SERVICE FACTOR 100.0 100.0 71.2 13.
REACTOR AVAILABILITY FACTOR 100.0 100.0 69.5 14.
UNIT SERVICE FACTOR 100.0 100.0 69.0 15.
UNIT A1 AILABILITY FACTOR 100.0 100.0 69.0 16.
UNIT CAPACITY FACTOR (Using Net 97.9 97.9 62.0 Capability \\
17.
UNIT CAPACITY FACTOR (Using Design Mwe) 94.9 19 60.1*
18.
UNIT FORCED OUTAGE RATE 0
0 24.4 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
Refueling - July 17, 1977 - 6 weeks 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
EACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA1, X 100 UGURS IN REPORTING PERIOD REACTOR AVAILABILITf FACTOR = HOURS REACTOR L'AS AVAIIAfil.E TO OPERATE X 100 00URS IN RITORTING PERIOD UNIT SERVICE FACTOR
= HOUPS CD:ERATOR ON LINE X 100 HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110URS UNIT WAS A'.'ATI An!.E TO CENERATE CO HOURS IN REPohTING PEnlOD7 9 1 g 1 UNIT CAI'ACITY FACTOR
= NET ELECTRICAL POWER GENERATED (Mwe-Net);l X HOURb IN RfPutJ ik O
_ s. V l Net C.npability or Design PERIOD UNIT FORCED OUTACE RATE
- TOECED OUTACE HOURS X 100 HOURS GENERATOR ON 1.INE + FORCED CUTAGE HOURS